|
ill> CONTINUING PROFESSIONAL ddddededet
<br /> ARCHITECTURAL & ENGINEERING SERVICES " -•. eeeeeA
<br /> FIRMSal ONLY (CCN",) RFQ NO. 12-04-02 o` 4 �ae
<br /> I- TRAFFIC & TRANSPORTATION ENGINEERINGJ CSAGraoaup4 1
<br /> .'AAAAAA AAA/
<br /> ISimon Gutierrez de Pineres, P.E. .
<br /> CONSTRUCTION MANAGEMENT �♦�O0
<br /> IMr. Gutierrez has over 7 years of experience with a specific emphasis on contract administration CSA Group
<br /> and management of construction projects. He brings a dual perspective to the management of Education:
<br /> projects as a former employee of FDOT District Four responsible for overseeing the preparation of M.S. Civil Engineering
<br /> progress and final estimates; oversees preparation of supplemental agreements and work orders; University of Florida
<br /> work schedule reviews; plan reviews, claim analysis; permit compliance; resolving conflicts Gainesville, FL
<br /> during construction; public involvement/public relations; provide contractor quality control May 2010
<br /> I oversight; partnering; correspondence, and documentation.
<br /> Relevant Experience B.S. Civil Engineering
<br /> P Florida International
<br /> 1 SR AlA Light Replacement Project from Harbor Drive to Sunrise Boulevard (P-11498), Broward University Miami, FL
<br /> County, FL — The Improvements under this contract includes the removal and replacement of light April 2004
<br /> poles and decorative fixtures to meet the requirement for protecting the turtles during the nesting
<br /> season; retrofitting existing poles; installation of new conduit and establishing new service Registrations:
<br /> connection points. Client: City of Fort Lauderdale, Earl Prizlee, P.E., (954) 828-6522, 08/2011 Professional Engineer
<br /> Present Florida No. 69452
<br /> Exp. 2/28/13
<br /> I 1-595 Express Corridor Improvement Project from I-75/Sawgrass Expressway Interchange to the I-
<br /> 595/1-95 Interchange (FM 420809-1-52-01), Broward County, FL - Construction Support Services Professional Engineer
<br /> Leader for the reconstruction of the 1-595 Expressway and all associated improvements to adjacent Colombia No.
<br /> crossroads, frontage roads and ramps for a total project length of 10.5 miles. Responsibilities 25202148895CND
<br /> I included coordinating the RFI process, coordination of shop drawing reviews, coordination of
<br /> geotechnical field operations (Pile Driving and Drilled Shaft Operations), resolution of non- Certifications:
<br /> conforming work, coordination of re-design efforts, constructability reviews, and preparation of CTQP Drilled Shaft
<br /> Iprogress reports. Client: FDOT District Four, Paul Lampley, (954) 845-9552, 8/2009 — 7/2011 Inspection
<br /> ■II Construction Project Engineer - Responsibilities include contract administration and supervision of Exp. 11/18/2011
<br /> inspection personnel for transportation projects. Oversees preparation of progress and final CTQP, Asphalt Paving
<br /> estimates; oversees preparation of supplemental agreements and work orders; work schedule Level I Exp. 7/10/12
<br /> reviews; plan reviews, claim analysis; permit compliance; resolve conflicts during construction; CTQP, Final Estimates
<br /> public involvement/public relations; provide contractor quality control oversight; partnering; Level I, Exp. 9/28/16
<br /> Icorrespondence, and documentation. Representative projects include: CTQP, Final Estimates
<br /> SR 820/Hollywood Boulevard from Young Circle East to West of SR AlA (FM 413835-1-52- Level II Exp. 12/13/11
<br /> 01), Broward County, FL — The improvements under this project consisted of widening and FDOT, Advanced Work
<br /> I resurfacing, rehabilitation and renovation, lighting, drainage improvements, irrigation, Zone Traffic Control
<br /> landscaping, signalization and median modifications to improve safety and mobility. Client: Exp. 8/23/15
<br /> FDOT District Four, James Jeffers, P.E., (954) 958-7628, (1/2009 —8/2009). FDOT, Design,
<br /> • SR 5/US-1 from Young Circle North to South of Sheridan Street (FM 413794-1-52-01), Construction and
<br /> Q Broward County, FL — The improvement under this project consists of Resurfacing, Maintenance of Rigid
<br /> Rehabilitation and Renovation on State Road 5 / US-1 and includes lighting, drainage Pavements
<br /> improvements, irrigation, landscaping, signalization and median modifications to improve FDOT, Design,
<br /> safety and mobility. Client: FDOT District Four, James Jeffers, P.E., (954) 958-7628, (1/2009— Construction and
<br /> 8/2009). Inspection of MSE Walls
<br /> • SR-814/Atlantic Boulevard from East of 1-95 to West of US-1 (FM 227921-1-52-01), Broward
<br /> County, FL — The improvements consisted of Resurfacing, Rehabilitation and Renovation on FDOT, Contract Legal
<br /> D State Road 814/Atlantic Boulevard and included the stabilization of the slope along C-14 Interpretation
<br /> Canal, landscaping, signalization and median modifications to improve safety and mobility. FHWA, Federal-Aid
<br /> Client: FDOT District Four, James Jeffers, P.E., (954) 958-7628, 8/2008 —8/2009. Contract Administration
<br /> 0 • SR 818/Griffin Road from East of SR-7/US-441 to West of US-1 (FM 413832-1-52-01), FEMA, Incident
<br /> Broward County, FL — The improvements consisted of Resurfacing, Rehabilitation and Command System
<br /> Renovation on State Road 818 / Griffin Road. This project also includes the landscaping, ICS 100
<br /> signalization and median modifications to improve safety and mobility. Client: FDOT District
<br /> II Four, James Jeffers, P.E., (954) 958-7628, 8/2007 —9/2008.
<br /> Wim,
<br />
|