Laserfiche WebLink
ill> CONTINUING PROFESSIONAL ddddededet <br /> ARCHITECTURAL & ENGINEERING SERVICES " -•. eeeeeA <br /> FIRMSal ONLY (CCN",) RFQ NO. 12-04-02 o` 4 �ae <br /> I- TRAFFIC & TRANSPORTATION ENGINEERINGJ CSAGraoaup4 1 <br /> .'AAAAAA AAA/ <br /> ISimon Gutierrez de Pineres, P.E. . <br /> CONSTRUCTION MANAGEMENT �♦�O0 <br /> IMr. Gutierrez has over 7 years of experience with a specific emphasis on contract administration CSA Group <br /> and management of construction projects. He brings a dual perspective to the management of Education: <br /> projects as a former employee of FDOT District Four responsible for overseeing the preparation of M.S. Civil Engineering <br /> progress and final estimates; oversees preparation of supplemental agreements and work orders; University of Florida <br /> work schedule reviews; plan reviews, claim analysis; permit compliance; resolving conflicts Gainesville, FL <br /> during construction; public involvement/public relations; provide contractor quality control May 2010 <br /> I oversight; partnering; correspondence, and documentation. <br /> Relevant Experience B.S. Civil Engineering <br /> P Florida International <br /> 1 SR AlA Light Replacement Project from Harbor Drive to Sunrise Boulevard (P-11498), Broward University Miami, FL <br /> County, FL — The Improvements under this contract includes the removal and replacement of light April 2004 <br /> poles and decorative fixtures to meet the requirement for protecting the turtles during the nesting <br /> season; retrofitting existing poles; installation of new conduit and establishing new service Registrations: <br /> connection points. Client: City of Fort Lauderdale, Earl Prizlee, P.E., (954) 828-6522, 08/2011 Professional Engineer <br /> Present Florida No. 69452 <br /> Exp. 2/28/13 <br /> I 1-595 Express Corridor Improvement Project from I-75/Sawgrass Expressway Interchange to the I- <br /> 595/1-95 Interchange (FM 420809-1-52-01), Broward County, FL - Construction Support Services Professional Engineer <br /> Leader for the reconstruction of the 1-595 Expressway and all associated improvements to adjacent Colombia No. <br /> crossroads, frontage roads and ramps for a total project length of 10.5 miles. Responsibilities 25202148895CND <br /> I included coordinating the RFI process, coordination of shop drawing reviews, coordination of <br /> geotechnical field operations (Pile Driving and Drilled Shaft Operations), resolution of non- Certifications: <br /> conforming work, coordination of re-design efforts, constructability reviews, and preparation of CTQP Drilled Shaft <br /> Iprogress reports. Client: FDOT District Four, Paul Lampley, (954) 845-9552, 8/2009 — 7/2011 Inspection <br /> ■II Construction Project Engineer - Responsibilities include contract administration and supervision of Exp. 11/18/2011 <br /> inspection personnel for transportation projects. Oversees preparation of progress and final CTQP, Asphalt Paving <br /> estimates; oversees preparation of supplemental agreements and work orders; work schedule Level I Exp. 7/10/12 <br /> reviews; plan reviews, claim analysis; permit compliance; resolve conflicts during construction; CTQP, Final Estimates <br /> public involvement/public relations; provide contractor quality control oversight; partnering; Level I, Exp. 9/28/16 <br /> Icorrespondence, and documentation. Representative projects include: CTQP, Final Estimates <br /> SR 820/Hollywood Boulevard from Young Circle East to West of SR AlA (FM 413835-1-52- Level II Exp. 12/13/11 <br /> 01), Broward County, FL — The improvements under this project consisted of widening and FDOT, Advanced Work <br /> I resurfacing, rehabilitation and renovation, lighting, drainage improvements, irrigation, Zone Traffic Control <br /> landscaping, signalization and median modifications to improve safety and mobility. Client: Exp. 8/23/15 <br /> FDOT District Four, James Jeffers, P.E., (954) 958-7628, (1/2009 —8/2009). FDOT, Design, <br /> • SR 5/US-1 from Young Circle North to South of Sheridan Street (FM 413794-1-52-01), Construction and <br /> Q Broward County, FL — The improvement under this project consists of Resurfacing, Maintenance of Rigid <br /> Rehabilitation and Renovation on State Road 5 / US-1 and includes lighting, drainage Pavements <br /> improvements, irrigation, landscaping, signalization and median modifications to improve FDOT, Design, <br /> safety and mobility. Client: FDOT District Four, James Jeffers, P.E., (954) 958-7628, (1/2009— Construction and <br /> 8/2009). Inspection of MSE Walls <br /> • SR-814/Atlantic Boulevard from East of 1-95 to West of US-1 (FM 227921-1-52-01), Broward <br /> County, FL — The improvements consisted of Resurfacing, Rehabilitation and Renovation on FDOT, Contract Legal <br /> D State Road 814/Atlantic Boulevard and included the stabilization of the slope along C-14 Interpretation <br /> Canal, landscaping, signalization and median modifications to improve safety and mobility. FHWA, Federal-Aid <br /> Client: FDOT District Four, James Jeffers, P.E., (954) 958-7628, 8/2008 —8/2009. Contract Administration <br /> 0 • SR 818/Griffin Road from East of SR-7/US-441 to West of US-1 (FM 413832-1-52-01), FEMA, Incident <br /> Broward County, FL — The improvements consisted of Resurfacing, Rehabilitation and Command System <br /> Renovation on State Road 818 / Griffin Road. This project also includes the landscaping, ICS 100 <br /> signalization and median modifications to improve safety and mobility. Client: FDOT District <br /> II Four, James Jeffers, P.E., (954) 958-7628, 8/2007 —9/2008. <br /> Wim, <br />