Laserfiche WebLink
CONTINUING PROFESSIONAL <br /> AIA <br /> LLddAdddd E <br /> II>, y�MM�llff L^dd dd d [ <br /> ARCHITECTURAL & ENGINEERINGSERVICES o .� .. , P .Sddd d <br /> O. 444444 <br /> FIRMS ONLY (CCN.`,) RFO NO. 12-04-02 "� o° �� 4���. <br /> I TRAFFIC & TRANSPORTATION ENGINEERING CSA Group4dd <br /> �' •e.. ds <br /> . :AAAAAA AIAA <br /> I IV. Approach & Methodology led us to identify several key elements necessary to the <br /> success of this program. They include: <br /> We have developed our approach to fit the needs of those <br /> services which we understand to be a part of the scope for QUALITY of DESIGN: The quality of design translates <br /> this solicitation, and which are further described in the directly into satisfactory services, durability, and low <br /> "Technical Approach" section of this submittal. This maintenance costs. Our engineers and technicians have the <br /> approach begins with a detailed analysis of the project necessary skills and direct hands on knowledge that will <br /> needs. This review includes, but is not limited to, meetings allow the application of quality standards on all projects <br /> with the City's Project Manager and other City officials, to associated with this program. <br /> I <br /> better understand the needs and priorities of all <br /> stakeholders. Our track record reflects consistent enforcement and the <br /> achievement of an exceptional level of quality in the design <br /> Moving on to our processes for the administration of and construction projects we have delivered to the City. <br /> Icontinuing services contracts, it is important to note our <br /> approach in executing the management of our services to SAFETY to the COMMUNITY: The safety of anybody <br /> the City. We understand this program to be an "on entering the construction area is and always will be the <br /> Idemand" contract, where the City will request services as team's top priority. All personnel proposed for this program <br /> projects are released and scheduled. We also understand have proved mastery of all work zone traffic and <br /> that adherence to the cost effectiveness of these services is construction safety procedures. This expertise is vital, and <br /> Ia very important consideration for the City, a fact that we've will promote a proactive role in avoiding risks to the public, <br /> already begun to reflect in the scheduling of our resources as well as to all workers involved in the program. <br /> and allocation of manpower for this program. Having worked <br /> I <br /> extensively on multiple projects, we are well versed in the MINIMAL IMPACT to the PUBLIC: The public demands <br /> practice of cross utilization of personnel when appropriate, efficient solutions with minimal inconvenience and impact <br /> all without losing quality or oversight of design activities. to their daily lives. Whether it's our sensitivity to the elderly <br /> population, our ability to help minimize disruption to the <br /> This simple practice directly results in significant cost flow of traffic, or our strict adherence to all security and <br /> savings to our clients, and we commit to providing the City safety regulations, we know that the improvements to the <br /> of Sunny Isles Beach with the same cost savings techniques community must take place with the most minimal impact <br /> at every appropriate interval. Additionally, and in the and inconvenience to the public. Balancing the economy <br /> interest of providing the best possible service to the City, and quality of any public construction project, maintaining <br /> we have committed only the best in terms of personnel, safety and security, and minimizing disruptions to public <br /> equipment systems, and other vital resources. This life is a challenge that should not be left to just any A/E/C <br /> commitment allows us to make a 100% guarantee that we team to tackle. We are confident that our personnel have <br /> O have, and will continue to, assign our most qualified the training and experience necessary to achieve this <br /> personnel available to service our community in the balance, and the track record of providing effective <br /> multiple number of simultaneous projects the City solutions under exactly this type of program. <br /> o commissions to our trust. <br /> We know that the proper way to address these key elements <br /> Philosophy, Methodology and Process is through effective Team Work and clear <br /> D Possibly the most important component necessary for any communications... and we've already put into practice this <br /> firm to succeed in the execution of this program, is the knowledge on past projects in South Florida. Our experience <br /> possession of a high level of empathy toward the tells us that the success of any project cannot rely on the <br /> community. CSA Group understands and shares the City's individual actions of the designer, CEI Consultant, City's <br /> goal of delivering projects for the benefit of its citizens, Representative, or Contractor alone, but on the effective <br /> while simultaneously controlling quality and costs. We have teamwork approach to the project and in the advance <br /> put into practice this understanding while executing problem solving capabilities that come from an experienced <br /> Iprevious services on similar contracts, and it is precisely our team of professionals. Only through this joint effort are we <br /> understanding and empathy toward the community that has able to ensure safety, quality and the timely completion of <br /> 0 Ism <br />