My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
CSA Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 4:40:44 PM
Creation date
2/2/2016 4:40:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUING PROFESSIONAL dddAddd4A <br /> ,,w�.,.,1. � c de .e 4 4 <br /> ARCHITECTURAL & ENGINEERING SERVICES �4d- <br /> .♦.4444.4 <br /> FIRMS ONLY (CCN".) RFO NO. 12-04-02 � ��4. <br /> TRAFFIC & TRANSPORTATION ENGINEERING CSA Grana 44 <br /> .:AAAAAA AAAI <br /> I Coordination services to be provided by the consultant and to define the <br /> This contract requires extensive coordination with various scope of services. <br /> agencies, subconsultants, utility companies, internal <br /> 1. Survey <br /> I <br /> support services, and the City. As part of the initial project development, a detailed survey <br /> The Consultant services on an "As-Needed" basis will of the project site should be prepared at the accuracy <br /> require that the appropriate staff is available to meet the needed for final design plans. CSA will be in charge of <br /> ICity's requests. We have the staff available comprised of creating such detailed survey to meet the design and City's <br /> local talent to meet these needs. requirement. In addition to the survey, aerial photos and <br /> ' It is envisioned that as work orders are assigned by the City, existing as-built drawings will be reviewed. <br /> the Project Manager will assign the project (s) to one or 2. Preliminary Design <br /> more of the Task Managers. The Task Managers will have For the Preliminary Design Phase, an "iterative" analysis <br /> Iavailable to them a large pool of personnel and resources to process of all issues that affect the project should be <br /> assign individual work. Continued coordination between the followed. These interrelated issues, in conjunction with any <br /> Project Manager and the Task Managers is a key element to value engineering analysis, should be studied in a <br /> I successfully reach the assigned project goals. multidisciplinary basis before recommendations for the <br /> various design elements are finalized. These issues may <br /> Continuous personalized coordination is paramount on this include: <br /> I <br /> type of project. CSA is well aware of the coordination <br /> efforts required and is committed to excel. Our reputation is • Existing underground utilities. <br /> that we are a client service oriented firm and "always • Horizontal and vertical geometry and site limitations. <br /> available." • Proposed concepts with the objective of providing <br /> I <br /> simple, constructible and cost effective solutions. <br /> Project Files • "Constructability" means that all construction stages and <br /> A separate file will be maintained for each project assigned construction schedule must work adequately to avoid <br /> Ito the Team. Each file will contain copies of all general <br /> correspondence, reports, man hour estimates, and meeting service interruptions. <br /> minutes. • Demolition of existing structures and surface restorations <br /> These files will be continuously maintained and • <br /> Overall cost analysis of the final concept in regards to <br /> I updated throughout the duration of the project. construction. CSA is sensitive to the fact that <br /> Maintenance of CADD generated files is equally important maintenance costs are an important consideration in cost <br /> as the regular correspondence project files. The Team will analysis. <br /> I <br /> • The Preliminary Design analysis will be reviewed by the <br /> maintain all CADD related information in compliance with Project Manager, QA/QC Manager and the Project Task <br /> an established standard so that it can be delivered to the Manager together with the City staff. <br /> I <br /> City at the end of the project in AutoCAD Format. 3. Final Design <br /> Reports Upon approval or acceptance of the Preliminary Design <br /> For each project work order assignment, CSA will prepare Phase Documentation, work commences with the <br /> monthly reports outlining the status, pending issues, and preparation of final construction plans, specifications and <br /> schedules. These reports will be made available to the cost estimates. <br /> appropriate Task Managers and to the City. In developing the final construction plans, we will review <br /> II <br /> II. TECHNICAL APPROACH the following major milestones: 30% design, 60% design, <br /> CSA Group will be responsible, along with other duties, for 90% design and 100% design. Much of the 30% design <br /> managing and coordinating project design and effort will already have been accomplished in the <br /> 11 subconsultants, undertaking project development and plans Preliminary Design Phase Documentation, where we will <br /> production duties, and addressing project complexity have reviewed the design concepts while insuring <br /> issues. constructability. <br /> IIOn any of the City proposed project, it is very important to <br /> clearly determine the requirements of the project and the <br /> Gtq <br />
The URL can be used to link to this page
Your browser does not support the video tag.