|
CONTINUING PROFESSIONAL dddddddd44
<br /> IARCHITECTURAL & ENGINEERING SERVICES - - � �A;a®eei
<br /> FIRMS ONLY (CCN^.) RFQ NO. 12-04-02 _•0, _ 4%
<br /> a TRAFFIC & TRANSPORTATION ENGINEERING41
<br /> 14
<br /> CSAGrrOU6dArlan ®j
<br /> •/AAAAAA AAAA
<br /> aCITY OF SWEETWATER IMPROVEMENTS FEMA-DORM DRAINAGE
<br /> Miami-Dade County, FL Miami-Dade County, FL
<br /> n CLIENT INFORMATION: CLIENT INFORMATION:
<br /> ,UI Florida Department of Transportation - District Six Miami-Dade County Department of Environmental
<br /> 1000 N.W. 111th Avenue, Miami, Florida 33172 Resources Management
<br /> Ana Arvelo, P.E., ana.arvelo@dot.state.fl.us 33 S.W. 2nd Avenue, Miami, Florida 33130
<br /> (305) 470-5210 Eduardo Vega, P.E., vegae@miamidade.gov
<br /> Phone No.: (786) 552-8571
<br /> PROJECT DESCRIPTION:
<br /> 0 The scope consisted of improvements to the street system PROJECT DESCRIPTION:
<br /> of the City of Sweetwater including milling and resurfacing, CSA Group was responsible for the management of a $380
<br /> sidewalk replacement and ADA compliance. Design Million program for the replacement and upgrade of
<br /> U services include Roadway design, drainage, signing and roadways and drainage systems at over 3,000 sites in
<br /> pavement markings, signalization, lighting, landscaping and Miami-Dade County, damaged during Hurricane Irene and
<br /> right-of-way. Start Date and Year Completed: November the No-Name Storm. The repairs ranged from simple
<br /> fl 2005-November 2007 roadway resurfacing to full roadway reconstruction and
<br /> drainage improvements. The engineering design process
<br /> GENERAL ENGINEERING CONSULTANT began with the inspection of each individual site which
<br /> a Miami-Dade County, FL allowed the determination of whether resurfacing or
<br /> reconstruction was the appropriate required scope of work,
<br /> CLIENT INFORMATION: as well as making a preliminary evaluation of the hazard
<br /> aCity of Miami mitigation measures that could be implemented at a
<br /> 444 S.W. 2nd Avenue, 8th Floor, Miami, FL 33130
<br /> Alice Bravo, P.E., abravo@miami.gov particular site. The design process required coordination
<br /> Phone No.: (305) 416-1225 with the following disciplines: geotechnical consultants,
<br /> utilities, DERM (permitting), other County design programs,
<br /> II PROJECT DESCRIPTION: and survey work. We were retained by the County at the
<br /> CSA Group provided general engineering consultant beginning of the program to provide a complete solution
<br /> O performing a wide range of engineering services to assist which included a procurement plan for consultant and
<br /> the City in the implementation and completion of a $610M contractors, the development of design standards,
<br /> Capital Improvement Program including roadways, parks engineering design, construction administration, and
<br /> 0 and facilities. Services included Program Management for coordination of projects. We were responsible for developing
<br /> horizontal projects (roadways and drainage projects) all the program guidelines and procedures and the
<br /> performing various general engineering consultants tasks administration and coordination of over 160 firms that
<br /> 0 including, but not limited to: project scope development, participated in the program, including designers,
<br /> special contract previsions, project concept reports; project geotechnical consultants, surveyors and contractors.
<br /> estimates and budgets; project tracking; assistance to the Services performed by Consul-Tech Enterprises, Inc., a CSA
<br /> a construction management team; assistance to the vertical Group company. Start Date/Year Completed: 2001 -2006.
<br /> group including permits approval, utility coordination,
<br /> execution of contracts, and coordinate between vertical & 'w 5,--s. r. 4 l
<br /> !0 horizontal projects. Additional, our work included Surveying y Tr 't: ��L ,, ;41
<br /> u and Mapping services and QA/QC plans review coordinator -`� �e- c ' i,,\
<br /> PP g /cam j' ` A �'p. —
<br /> for all horizontal projects which included issues such as: ' __y� s '��. 11 �,S <^
<br /> i yd .te l' e?'�. '-4-'7 a ,,,� "s-'•
<br /> tracking of designs, reviews, comments, and check and y b -.-- -,Vt ' z;
<br /> resolve the inconsistencies and/or conflicting comments. Fi� � v-
<br /> Services performed by Consul-Tech Enterprises, Inc., a CSA �, �,,; � C f '� � /
<br /> Group company. Start Date/Year Completed.-2004-2006 fr >: , xr F' .-
<br /> �rl�{
<br /> "r'�y7�"�i.. it .y : a' \. 4-, 4%...,may .,
<br /> Ic.n
<br />
|