My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
CSA Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 4:40:44 PM
Creation date
2/2/2016 4:40:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EN, CONTINUING PROFESSIONAL /A <br /> dddd//// I <br /> ARCHITECTURAL & ENGINEERING SERVICES '` : G �;;::/: <br /> FIRMS ONLY (CCN!A> RFO NO. 12 04 02 . 1 .o _ �4AAs <br /> TRAFFIC & TRANSPORTATION ENGINEERING CSA Groups/4 <br /> ..A /A <br /> !/AAAI• Idle <br /> III. Staffing Website: www.csagroup.com <br /> The professional staff proposed by CSA Group Team is Carlos Mallol, P.E., DBA, Principal-in-Charge (CSA Group). <br /> shown in the attached organizational chart. Our local office Dr. Mallol's primary responsibility will be to assure that the <br /> is enhanced by our ability to pull in resources within the Project Manager has all the resources available to satisfy <br /> local office or anyone available in other offices where the the City's needs on time and with the highest degree of <br /> expertise exists of where the extra hand is available. This quality. He will oversee the contract and ensure that <br /> allows CSA Group to keep the project's staff to the level management and staff is following established management <br /> required to complete the project on time. CSA Group's staff protocols, procedures in accomplishing the City's goals. Dr. <br /> of 400-plus professionals includes over 125 licensed Mallol has over 33 years of experience totally dedicated to <br /> engineers and architects, and over 30 scientists spread out the areas of construction. His emphasis has been in road <br /> in 50 technical disciplines. Our organizational structure and bridge construction with significant participation in the <br /> offers a unique advantage to the City of Sunny Isles Beach infrastructure development of Southeast Florida. Dr. Mallol <br /> for the optimum performance of this contract. CSA Group's brings the combination of both the experience of managing <br /> structure designates a principal of the firm to whom the a road construction company that participated in over $100 <br /> Program Manager must report project issues for the Million of infrastructure work in South Florida and that of a <br /> effectively and timely resolution. This chain of command professional offering construction management consulting <br /> allows an effective and fast communication to respond to services for large civil engineering projects. Additionally, <br /> any situation that may affect a project. Relevant experience Dr. Mallol has been active in the investigation and <br /> resumes are included immediately fol owing the narrative in resolution of constructability issues and construction <br /> this section. claims, providing claim analysis, scheduling analysis and <br /> MMANAGEMENT TEAM expert witness testimony in construction-related claims. <br /> Evelio Chavez, P.E., Project Manager. Mr. Chavez has over Andres Garganta, P.E., Quality Assurance/Duality Control <br /> 27 years of highway design experience with both the public (QA/QC). Mr. Garganta's primary responsibility will be to <br /> and private sector. His emphasis has been roadway design, oversee the QA/QC efforts and will assign the independent <br /> plans production, and project management. Mr. Chavez reviewers for this contract. Mr. Garganta is a registered <br /> a has extensive experience and knowledge of the Florida engineer with over 37 years of experience in civil <br /> Department of Transportation's (FOOT) procedures. He has engineering, primarily dedicated to the area of <br /> successfully managed similar continuing services contracts Transportation Engineering and Management of roadway <br /> that include: City of Miami Civil Engineering Services forII <br /> and highway projects. Mr. Garganta's work experience for <br /> Roadway Projects, City of Miami Program Management this contract is exemplified by his management of several <br /> Services, City of Miami General Engineering Consultant continuing services contract including, but not limited to, <br /> ilServices; FDOT District Six Districtwide Miscellaneous PE the General Engineering Consultant #1, Districtwide <br /> Design Consultant and Miami-Dade County FEMA-DORM Miscellaneous PE Design Consultant, City of Miami General <br /> Restoration Program. Engineering Consultant, City of Sweetwater Improvements, <br /> 0 and FEMA-DORM Drainage Improvements. <br /> He will be responsible for all project coordination and <br /> overseeing the schedule and budget. Mr. Chavez will meet ROADWAY DESIGN <br /> 0 with the City's project manager on a monthly basis to review Alfredo Reyna, P.E. (CSA Group). Mr. Reyna has over 25 <br /> the progress and discuss all relevant project issues. years of experience involved in a variety of Transportation/ <br /> Contact Information: Highway projects including geometry design (vertical and <br /> U Mr. Evelio Chavez, P.E. horizontal), storm drainage systems, Pavement Marking and <br /> CSA Central, Inc. (CSA Group) signing, Signalization, utilities, water/sewer systems and <br /> 6100 Blue Lagoon Drive, Suite 300, Miami, FL 33126 site development. His experience includes the elements of <br /> I Office Phone Line: (305) 461-5484 ext. 7306 geometric calculation, drainage design, traffic control plans <br /> Direct Fax Line: (305) 461-5494 (TCP), signalization, right-of-way map preparation, roadway <br /> E-Mail: echavez@csagroup.com <br /> I Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.