|
0
<br /> 0
<br /> 0
<br /> 0
<br /> 0
<br /> 0
<br /> Jorge Ferrer
<br /> Director of Quality Control, Partner
<br /> O
<br /> • Professional Design Experience
<br /> Mr. Ferrer has over 20 years experience in architecture and interior architecture for a variety of
<br /> o clients, including government facilities, offices, parks, and hospitality facilities. He has served as
<br /> 4
<br /> -'
<br /> 7
<br /> O project manager and project architect, coordinating project teams and engineering consultants
<br /> [j '� from project inception through implementation.One of Mr.Ferrer's primary responsibilities is to ensure
<br /> O a
<br /> that all projects developed at B&A go through our rigorous document review and coordination
<br /> process.He,along with his team of professionals,reviews all projects for completion,correctness and
<br /> • '+' compliance with established design criteria and governing codes.
<br /> O
<br /> PROJECT EXPERIENCE
<br /> • Miami International Airport- MIA Mover Automated People Mover, Miami, Florida - As the Design
<br /> • Review Coordinator for the Construction Services Team(FFCST),Mr.Ferrer leads o team of architects
<br /> • and engineers performing design reviews of the design-build team's documents of the fixed facilities
<br /> design of this$259 million project which includes the People Mover Station.Guideway and Traction
<br /> • EDUCATION Power Sub-Station currently under construction. As the Owner's representatives, Mr. Ferrer and his
<br /> • Master of Architecture,
<br /> University of Florida. 1993 team reviewed all design and construction documentation including Architectural.MEP,Structural.
<br /> 0 Civil and Landscape Architecture drawings, RFIs,calculations,schedule,pay applications,waivers,
<br /> • Bochelor of Architecture, and change orders.
<br /> University of Florida, 1986
<br /> • Florida Department of Transportation (FDOT) District 4, Amtrak Station Historic Rehabilitation. Fort
<br /> • Lauderdale, Florida-QA/QC.Performed quality control services associated with the Rehabilitation/
<br /> • Repair/Restoration of the Historic Ft.Lauderdale Amtrak Train Station in Broword County.
<br /> Miami-Dade Expressway Authority SR836, SR874 and SR112 ORT/DMS Gantries-Miami Florida-B&A
<br /> • Project Manager and Designer responsible for the development of preliminary designs for the
<br /> • proposed ORT and DMS gantries throughout the SR836,SR874 and SRI 12 corridors.This includes the
<br /> • redesign/replacement of the award-winning existing Wing toll plaza on SR836 with a new signature
<br /> gateway gantry spanning both East and Westbound lanes and exit ramp to 17th avenue.Numerous
<br /> • signature designs were also generated for mainline and romp gantries throughout the corridors
<br /> • incorporating the proposed ORT and DMS systems.
<br /> •
<br /> Miami-Dade Expressway Authority(MDX) SR 836, East Bound Toll Plaza Design Consultant Services,
<br /> Miami, Florida - Project Manager responsible for all phases of this project, from initial conceptual
<br /> • design through construction phase. This award-winning facility is located on an existing expressway
<br /> • and includes two AVI lanes,six toll lanes,a canopy,a service tunnel and a catwalk.Stainless steel and
<br /> • aluminum cladding provided MDX with the advantages of off-site prefabrication,rapid construction
<br /> and installation and minimum disruption for the public during this construction process.
<br /> •
<br /> • Miami-Dade Expressway Authority(MDX)Headquarters,Miami,Florida-Project Manager responsible
<br /> • for all phases of this project,from initial conceptual design through construction phase. This award-
<br /> winning 14,000 SF building was designed to house a state-of-the-ad traffic center.o boardroom and
<br /> • general office space.The existing one-story building was modified to create a gateway into the new
<br /> building and operated uninterrupted during construction.
<br /> • Miami-Dade Water And Sewer Department Headquarters Facility,Miami, Florida-Project Manager
<br /> responsible for all phases of this project, from initial conceptual design through construction phase.
<br /> • B&A served as Design Criteria Professional for the$30 million headquarters facility comprised of a-5
<br /> • story office building and a 10-story parking garage.Responsibilities included consolidating numerous
<br /> • department divisions that were spread throughout the county.
<br /> Miami-Dade Water And Sewer Department LeJeune Office Building, Coral Gables, Florida -
<br /> • Project Manager responsible for programming, space planning, construction documents, and
<br /> • construction administration services for 58.000 SF building. Responsibilities include coordination
<br /> •
<br /> Cba > www.bermelloajamil.com
<br /> •
<br /> • 47
<br />
|