|
O
<br /> O
<br /> O
<br /> O
<br /> O
<br /> O
<br /> Jorge Ferrer
<br /> • Director of Quality Control, Partner
<br /> 0
<br /> O with existing departmental standards,phasing of departments for renovation and analysis of ADA
<br /> compliance of existing building.
<br /> O Miami-Dade Water And Sewer Department Alexander Orr Maintenance Building, Miami. Florida -
<br /> • Project Manager for remodeling of three-story. 3,600-sf maintenance building. Responsibilities
<br /> O include programming, space planning, production and coordination of construction documents
<br /> and construction administration services.
<br /> •
<br /> • Miami-Dade Water And Sewer Department Salzedo Office Building. Coral Gables, Florida - Project
<br /> • Manager for remodeling of a three-story. 36,000 SF building. Responsible for programming, space
<br /> O planning,production and coordination of construction documents and construction administration
<br /> services. Also responsible for coordination with existing departmental standards, phasing of
<br /> • departments for renovation and analysis of ADA compliance of existing building.$1.000,000 furniture
<br /> • (systems and case goods) budget.
<br /> • Miami-Dade Water And Sewer Department Southwest Customer Service Building, Kendall, Florida -
<br /> • Project Manager for new 3-story,95,000 SF building.Responsible for programming,space planning.
<br /> • interior design and production and coordination of construction documents. $2.5 million furniture
<br /> • )systems and case goods) budget.
<br /> • Marriott Vacation Club International Architectural Due Diligence Analysis,Miami,Florida-Prepared
<br /> ® a due diligence analysis in an effort to attract international and domestic timeshare owners for a
<br /> proposed 240-unit, 7 building complex at the Marriott Vocation Club Timeshare Resort along the
<br /> O Greg Norman"Great White Course," at the Doral Golf Resort and Spa in Doral,Miami-Dade County.
<br /> Analyzed regulatory process,focusing on zoning,plotting.concurrence,and impact fees.Developed
<br /> general architectural concept including drawings,site plans and preliminary specifications.
<br /> 0 Marriott Vacation Club International Villas at Doral, Miami, Florida - Prepared design and
<br /> construction documents for 240 unit, 7 building multi-phase project of the Doral Golf Resort and
<br /> 0 Spa.Scope included programming,production and coordination of construction documents and
<br /> • construction administration services.
<br /> 0 American Airlines,Admirals Club Concourse D,Miami International Airport,Miami,Florida -Renovated
<br /> on existing Admirals Club while minimizing the impact on 2,000 daily passengers.Capacity for 289 club
<br /> 0 members combined a dynamic interior with the comfort level club members hove come to demand.
<br /> 410
<br /> American Airlines Admirals Club Mexico City,Mexico-Project Manager responsible for all phases of
<br /> this award winning project,from initial conceptual design through construction phase.Intended for
<br /> business travelers and international passengers,the Admirals Club in Mexico City combines upscale
<br /> • finishes with practical amenities expected by all visitors.
<br /> Salvadore Park and Tennis Center Improvements,Coral Gables,Florida-Provided programming.park
<br /> master planning,schematic design and construction documentation for this tennis center and public
<br /> park located in Coral Gables,Florida.The facility has 13 tennis courts including eight clay courts and
<br /> • five hard/asphalt courts and a tennis center that houses restrooms,showers and a tennis pro-shop. In
<br /> • addition,the park features a picnic pavilion.playground,tot lot,picnic area and street furniture.
<br /> • Athalie Range Park Improvements,Miami,Florida-Provided architectural and engineering services
<br /> • for the development of construction documents,bid/negotiations and construction administration.
<br /> • The project scope included the remodeling of the existing pool facility,including office,bathrooms.
<br /> • pool and pool equipment.Construction cost-$1.5 million.
<br /> Riverside Center, Miami, Florida - B&A assisted the City of Miami in remodeling an existing 10-story,
<br /> • 199,000 SF office building to consolidate all the city's scattered administrative functions.Operating
<br /> • Cba > www.bermelloajamil.com
<br /> • 48
<br />
|