Laserfiche WebLink
m <br /> O <br /> O <br /> O <br /> O <br /> O <br /> Jorge Ferrer <br /> • Director of Quality Control, Partner <br /> O <br /> 0 with city-provided space plans for the 199.000 SF facility, B&A produced documents for demolition <br /> a and new construction, reconfigured selected sections to owner specifications. constructed or <br /> refinished walls, doors, and other areas to match existing standards, and provided construction <br /> O estimates and construction administration. The B&A team was also responsible for mechanical, <br /> 0 electrical and plumbing revisions,and a complete signage package for exterior and interior spaces. <br /> • The project was floor-by-floor phased to accommodate the city's relocation schedule and avoid <br /> disruption to city operations. <br /> O <br /> • Colonial Bank Doral Branch. Miami, Florida - New single story, 3.600 SF bank branch office. <br /> • Scope included programming, production and coordination of construction documents and <br /> construction administration services. <br /> • <br /> • Community Bank of Homestead,Homestead, Florida-New two-story,6,000-sf bank building.Scope <br /> • included production and coordination of construction documents, coordination of security & <br /> • telecommunications,construction details&specifications manual,construction administration. <br /> • Commercial Trust Bank, Miami, Florida - Interior remodeling/space planning, production and <br /> coordination of construction documents, coordination of security & telecommunications, <br /> • specifications,construction administration for 4,000-sf bank. <br /> • DESIGN REVIEWS <br /> • The following is a sample of the variety of projects that Mr.Ferrer and his team have reviewed and <br /> • coordinated through B&A's design review process. <br /> South Miami Hospital Clinical Expansion-South Miami <br /> • Joseph Caleb Center New Courthouse Annex and Parking Garage Building-Miami-Dade <br /> • Onyx 2-City of Miami <br /> Opera Place-West Palm Beach <br /> Filling Station-City of Miami <br /> • Dorol Park-City of Doral <br /> • Terminal#18-Port Everglades <br /> • Administration Building-Port Everglades <br /> Terminal#25-Port Everglades <br /> • Terminal#29-Pod Everglades <br /> • Premiere Towers-City of Miami <br /> • Wittkop Park-City of Homestead <br /> • Vistono Village Phase IIB-Orlando <br /> NAP of West Africa-Canary Islands <br /> • Las Terrazas-Belize <br /> • TECOTA 4th Floor West Expansion-City of Miami <br /> • Valley Church-Antigua <br /> TECOTA 3rd Floor West Expansion-City of Miami <br /> • <br /> Broadway Pier Terminal-San Diego <br /> • UM Oasis Café-University of Miami <br /> • Continental Hotel-Miami Beach <br /> • Casa Palermo at Old Spanish Village-Coral Gables <br /> United Kingdom-The World,Dubai,UAE <br /> • The Heart of Europe-The World,Dubai.UAE <br /> . The Island of Java-The World,Dubai,UAE <br /> • Huainan-The World.Dubai,UAE <br /> Osaka-The World.Dubai,UAE <br /> • <br /> • <br /> • <br /> Cba > www.bermelloajamil.com <br /> • <br /> 49 <br />