My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil - Urban Planning
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Bermello Ajamil
>
Bermello Ajamil - Urban Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 3:30:26 PM
Creation date
2/3/2016 3:30:25 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> • APPROACH & METHODOLOGY <br /> • <br /> • <br /> O <br /> • Phase 3 - Construction Documents <br /> B&A will prepare a set of construction documents that will include both drawings and specifications. <br /> 0 <br /> • Phase 4 - Permitting and Bidding Phase <br /> • B&A's role will be to comply with all required procedures during the bidding portion of the project collect <br /> • and respond to all RFI's via addendums and review all submitted bids and assist the City as needed <br /> • regarding the recommendation of the most qualified bidder. In conjunction with this phase, the project <br /> • documents will be issued for permitting to all applicable agencies. B&A will assist in responding to all <br /> • permit comments. <br /> • <br /> 0 <br /> • Phase 5 - Construction Administration Phase <br /> • B&A will provide general oversight of the construction and reasonable assurances based on site and <br /> • progress observation that the construction is being prosecuted in accordance with the prepared plans <br /> • and specifications. <br /> • <br /> • <br /> • Phase 6 - Public Outreach <br /> • We believe that public outreach and consensus building is one of the most important elements of this <br /> • assignment. We have provided community outreach for numerous major projects in South Florida <br /> • including the City of Miami Beach Parks Master Plan. B&A's community consensus building capabilities <br /> • coupled with its design expertise came into play in the development of the Pompano Beach Boulevard <br /> • Master Plan where a parking structure and beach side improvements including the construction of a new <br /> • park was proposed. <br /> • <br /> • <br /> • Phase 7 - General Planning Services <br /> • B&A will provide general planning services as may be defined and required by the City of Sunny Isles beach. <br /> • The necessary studies and approach to each specific service will be provided prior to commencement <br /> • of the work. <br /> • <br /> • <br /> • Phase 8 - Studies <br /> • <br /> • B&A has performed many different planning studies throughout the years. One of our most recent and <br /> • successful was the writing of the TIGER II Grant for the Pod of Miami in 2010;an endeavor that resulted in the <br /> • federal government awarding a$22 million grant for construction of the Rail Reconnection and Intermodal <br /> • Project. This project will restore cargo rail service to the Port of Miami and will lay the groundwork for the <br /> • inclusion of passenger rail on the Florida East Coast Railway corridor. <br /> • <br /> • The B&A Team,with its varied expertise and presence, is ready to immediately assist the City of Sunny Isles <br /> • beach in all its general planning needs. <br /> • <br /> • <br /> • <br /> • `a CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) <br /> • RFQ No. 12-04-02 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.