Laserfiche WebLink
BERNARDO BIELER, P.E. <br /> C® Project Manager <br /> CONSULTANWNC —� <br /> Project Manager: Mr. Bieler will be the city's main point of contact. He will oversee the <br /> ' infrastructure improvements performed by the CES team. He will manage engineering 0-co <br /> staff during project programming and preparation of conceptual design, preparation O <br /> of construction contract drawings and specifications complying with the requirements mG <br /> of the authorities having jurisdiction, development of schedules for design and a <br /> construction, preparation of estimated quantities, costs and bid forms, construction <br /> support services. <br /> Education <br /> M.S. Civil Engineering - Florida International University - Miami, FL 2011 <br /> M.S. Civil Engineering - University of Miami- Miami, FL 2005 <br /> B.S. Civil Engineering - Universidad del Zulia - Maracaibo, Venezuela 2001 <br /> Registrations <br /> Professional Engineer Florida # 71425 o <br /> Mr. Bieler is a Professional Engineer with 8 years of experience in the areas of Civil Engineering, <br /> Transportation, Water Resources, and Project Management. He provides a unique input in the <br /> development of projects with a mix academic and professional experience in transportation <br /> and water resources, has actively been involved in the geometric design of major and minor <br /> highways following local and federal standards, and has extensive experience in implementing <br /> hydrodynamic models for management and designing storm water systems. <br /> SW 62nd Avenue from SW 74th Street to SW 60th Street, Miami-Dade County, Florida, Miami- <br /> Dade Public Works Department-Mr. Bieler was Design Engineer responsible for development of <br /> the lighting design and maintenance of traffic plans. This project entailed the reconstruction of <br /> approximately 0.5 mile of an urban arterial from an existing four-lane roadway to a two-lane <br /> roadway with a shared median and parallel parking on the east side of the corridor. <br /> US-1 (SR 5) Design-Build Project, Miami-Dade County, FDOT/ Community Asphalt Corporation - <br /> Mr. Bieler was Project Engineer assisting in the design and plans preparation of the bell south <br /> duct banks. The project involved reconstructing US-1 from an undivided 2-lane rural road to a <br /> divided 2 lane rural road primarily with the purpose of introducing a buffer separation between <br /> northbound and southbound traffic. <br /> Miramar Toll Plaza - SR 821 H.E.F.T. Toll Plaza Improvements (from University Drive to Turnpike <br /> Mainline)/ EAC Consulting, INC -Improvements included milling/resurfacing and widening the o <br /> east and westbound mainline of the existing structure and reconstruction of exit ramp. Primary <br /> responsibilities include Project Designer for the development of the construction drawings, <br /> pavement design, signing and pavement marking package, typical section package and <br /> drainage package. <br /> SR826 (Palmetto Expressway) Improvement Programs, Section 2 FDOT District 6 - Mr. Bieler was <br /> Project Engineer in the design of the roadway drainage system, develop hydraulic modeling <br /> and prepare environmental permitting renewals and applications. Additionally, assist in the <br /> design and plans preparation of the storm water pollution prevention plan. The proposed <br /> improvements include the addition of one general use lane in each direction; auxiliary lanes <br /> between all interchanges; interchange improvements and, operational and safety <br /> improvements along the SR-826 mainline and ramps. <br /> City of Sunny Isles Beach Continuing Professional Architectural&Engineering Services RFQ 12-04-02 I 14 <br />