My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants - Environmental
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
CES Consultants - Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 3:32:05 PM
Creation date
2/3/2016 3:32:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O (Typical MOT Two (Typical MOT Plan Two-Lane Two-Way) <br /> o <br /> goa a .� _i ... _.y <br /> — 0 nr. 6 . u u a u <br /> D 0 D D D-'. :1-..---101"S",--:1/T-:- D I <br /> e <br /> II • mo mew/ © <br /> I <br /> Multilane, Work Within the Travel Way <br /> 1 This MOT also has a close proximity to the general public. The work area will typically take one full <br /> lane. Channelizing devices will allow drivers with the required time and space fo properly merge <br /> into one lane. Since the work zone will constantly move, there is no need for concrete barriers. <br /> The proper traffic control signs and devises will help all drivers safely maneuver around our work <br /> zone. <br /> - - - (Typical MOT plan with median)I - - - - <br /> a a <br /> b b <br /> 1 / epen - <br /> 0 D D D / D <br /> o / Me RdICvfz r Pbees-1 Wr4Xa q <br /> Il /ledArea <br /> 0 D D D ////////// -I--; D <br /> 'A <br /> ,_ 8 c — Tr LenTtn_L I Buffer Sore I �' su Et <br /> See Tele B See Tele II ' OW etre <br /> y. •��r •• I DM •/`: /.J Doke S�1 'rat I Doke Seele geeprd I .EV 1 <br /> SPEEOLE Fla <br /> ® <br /> See Telt 1 see rme t <br /> DDUBt® <br /> WO MUSS <br /> PRESENT _ — _ ___-- __. <br /> 1 Final Opinion of Probable Construction Cost Estimate <br /> The opinion of probable construction costs will be updated to reflect final design documents, <br /> Iincluding supporting documentation and quantity takeoffs. <br /> Permit Compliance Matrix <br /> 1 A matrix including all required permits will be developed from research and contacts in Phase I. <br /> The compliance matrix will include target dates for acquisition, permit conditions/dates, and <br /> status for tracking purposes. <br /> 1 QA/QC Reviews <br /> The team will conduct internal QA/QC, constructability and operability reviews continually <br /> throughout the design process. At the 60%and 90% completion stages, workshop review sessions <br /> a <br /> will be conducted with the City. Comments and resolution will be documented for the project <br /> files. <br /> I <br /> I <br /> City of Sunny Isles Beoch Continuing Professional Architectural&Engineering Services RFQ 12-04-02 I 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.