Laserfiche WebLink
4) <br /> 1110• <br /> , '" I' 3 :GYry��4_31 LL tel.l.., p <br /> r <br /> S� • <br /> 4 ., `1 With over 25 years of experience,Mr Hall has been involved in numerous diverse Land Development AO <br /> r d <br /> 'Nfia^ ` tand Civil Engineering projects. His experience providing construction management for a Builder/ <br /> 7, Developer, permit review and program management for a large municipality, and Design/Consulting <br /> services for both Private and Public sector clients, provides broad insight into the variety of issues <br /> 4 T` " related to project development. <br /> , Having participated in the design and implementation of everything from small in-fill development to <br /> or'4 large neighborhood improvement projects,Mr.Hall has been exposed to a wide range of private land <br /> "/-' development and public infrastructure projects. His experience spans from modeling and master <br /> ACADEMIC planning to preparation of construction documents, permitting,and construction administration,for <br /> BACKGROUND numerous water distribution, sewer collection, storm water management, and land development <br /> B.5., Civil Engineering, projects. <br /> University of Maryland, RELEVANT EXPERIENCE <br /> 1987 <br /> PRIVATE SECTOR: Mr.Hall has provided design services for dozens of private development projects <br /> PROFESSIONAL throughout Florida;including residential,commercial,and institutional.The diversity in project locations <br /> REGISTRATION has provided exposure to the unique multi-jurisdictional requirements throughout South Florida. His <br /> Registered Professional project management skills and ability to prioritize client needs and concerns while complying with <br /> Engineer, FL#50588 jurisdictional requirements have been enhanced through his years of experience and the variety of <br /> projects completed. <br /> PROFESSIONAL PUBLIC SECTOR: Projects include modeling and design of water, wastewater, and stormwater <br /> AFFILIATIONS collection systems at both a master planning and project specific level. Mr.Hall has a firm awareness of <br /> Florida Engineering Society State and Jurisdictional requirements and methodology/means for compliance. His past civic experience ID <br /> and role as client manager for several general services contracts,provides an understanding of what's 6:�i <br /> needed to work as an extension of Municipal Staff. <br /> • <br /> ACME BASIN B — SECTION 24, WELLINGTON, F L: Project lead on development of 360-acre <br /> stormwater attenuation basin with 4.5 miles of related canal improvements and two 200 cfs pump '1t <br /> stations. Project included working with a ACOE Project Implementation Report as a consultant to AL1. <br /> SFWMD, in an effort to provide construction documents for water quality and flood attenuation <br /> project meeting.Client/Contact:South Florida Water Management District(SFWMD)/Tommy Strowd, 411) <br /> P.E.,Phone:(561) 242-5520 ext 4010.(1/03 to 10/06) <br /> EDGEWOOD DRAINAGE ANALYSIS, FORT LAUDERDALE, FL: Project lead on drainage is <br /> analysis of existing 600-acre neighborhood with the purpose of quantify and identifying cause for <br /> frequent and substantial flooding. Orchestrated project modeling,proposed alternatives,and provided <br /> cost estimates with defined level of service. Presentation findings to homeowners and City officials. <br /> Client/Contact:City of Fort Lauderdale/Paul Pohlander,P.E.,Phone:(954) 828-6527.(2006 to 2007) • <br /> CITY OF FORT LAUDERDALE —WW2011 PROGRAM, FORT LAUDERDALE, FL: Project <br /> Lead for design services related to City's Capital Improvements Program which included approximately <br /> $636 million in utilities infrastructure repair,replacement,and upgrades.The program includes analysis, <br /> modeling and design for improvements to water and wastewater facilities in meeting a comprehensive <br /> plan in response to expanded demand and service areas.Client/Contact City of Fort Lauderdale/Paul <br /> Bohlander,P.E.,Phone:(954) 828-6527.(2003 to 2010) <br /> ITCHEPACKESSASA CREEK WATER MANAGEMENT FACILITY, POLK COUNTY, FL: <br /> Principal-in-charge for 265-acre parcel purchased by the County for conversion from pasture to a cp <br /> water quality treatment facility with active and passive park components. Project considerations <br /> include uptake of nutrients from existing streams,creation and preservation of wetlands and habitat, I): <br /> and provisions for a natural ecosystem providing an ancillary affect of stormwater attenuation.Client/ <br /> Contact:Polk County Natural Resources (PCNR)/Robert Kollinger,P.E.Project Manager,Phone:(863) <br /> 534-7377.(5/09 to 5/1 I) <br /> BROWARD COUNTY NEIGHBORHOOD IMPROVEMENT PROJECTS, BROWARD 41 <br /> COUNTY, F L: Four individual neighborhood improvement projects ranging from 900 to 1600-acres <br /> each. Prepare models to identify areas of inadequate fire protection, sewer collection,and drainage. ' <br /> Utilize models to design upgrades to water, force main, lift stations, and drainage. Improvements <br /> include re-grading of roadways and landscaping. <br /> ¢tyon KEITH and SCHNARS,P.A. <br /> FIAIUDAS 5,k LOCAL FIRM <br /> PAGE 22 RFQJ2-04-02 <br />