|
4)
<br /> 1110•
<br /> , '" I' 3 :GYry��4_31 LL tel.l.., p
<br /> r
<br /> S� •
<br /> 4 ., `1 With over 25 years of experience,Mr Hall has been involved in numerous diverse Land Development AO
<br /> r d
<br /> 'Nfia^ ` tand Civil Engineering projects. His experience providing construction management for a Builder/
<br /> 7, Developer, permit review and program management for a large municipality, and Design/Consulting
<br /> services for both Private and Public sector clients, provides broad insight into the variety of issues
<br /> 4 T` " related to project development.
<br /> , Having participated in the design and implementation of everything from small in-fill development to
<br /> or'4 large neighborhood improvement projects,Mr.Hall has been exposed to a wide range of private land
<br /> "/-' development and public infrastructure projects. His experience spans from modeling and master
<br /> ACADEMIC planning to preparation of construction documents, permitting,and construction administration,for
<br /> BACKGROUND numerous water distribution, sewer collection, storm water management, and land development
<br /> B.5., Civil Engineering, projects.
<br /> University of Maryland, RELEVANT EXPERIENCE
<br /> 1987
<br /> PRIVATE SECTOR: Mr.Hall has provided design services for dozens of private development projects
<br /> PROFESSIONAL throughout Florida;including residential,commercial,and institutional.The diversity in project locations
<br /> REGISTRATION has provided exposure to the unique multi-jurisdictional requirements throughout South Florida. His
<br /> Registered Professional project management skills and ability to prioritize client needs and concerns while complying with
<br /> Engineer, FL#50588 jurisdictional requirements have been enhanced through his years of experience and the variety of
<br /> projects completed.
<br /> PROFESSIONAL PUBLIC SECTOR: Projects include modeling and design of water, wastewater, and stormwater
<br /> AFFILIATIONS collection systems at both a master planning and project specific level. Mr.Hall has a firm awareness of
<br /> Florida Engineering Society State and Jurisdictional requirements and methodology/means for compliance. His past civic experience ID
<br /> and role as client manager for several general services contracts,provides an understanding of what's 6:�i
<br /> needed to work as an extension of Municipal Staff.
<br /> •
<br /> ACME BASIN B — SECTION 24, WELLINGTON, F L: Project lead on development of 360-acre
<br /> stormwater attenuation basin with 4.5 miles of related canal improvements and two 200 cfs pump '1t
<br /> stations. Project included working with a ACOE Project Implementation Report as a consultant to AL1.
<br /> SFWMD, in an effort to provide construction documents for water quality and flood attenuation
<br /> project meeting.Client/Contact:South Florida Water Management District(SFWMD)/Tommy Strowd, 411)
<br /> P.E.,Phone:(561) 242-5520 ext 4010.(1/03 to 10/06)
<br /> EDGEWOOD DRAINAGE ANALYSIS, FORT LAUDERDALE, FL: Project lead on drainage is
<br /> analysis of existing 600-acre neighborhood with the purpose of quantify and identifying cause for
<br /> frequent and substantial flooding. Orchestrated project modeling,proposed alternatives,and provided
<br /> cost estimates with defined level of service. Presentation findings to homeowners and City officials.
<br /> Client/Contact:City of Fort Lauderdale/Paul Pohlander,P.E.,Phone:(954) 828-6527.(2006 to 2007) •
<br /> CITY OF FORT LAUDERDALE —WW2011 PROGRAM, FORT LAUDERDALE, FL: Project
<br /> Lead for design services related to City's Capital Improvements Program which included approximately
<br /> $636 million in utilities infrastructure repair,replacement,and upgrades.The program includes analysis,
<br /> modeling and design for improvements to water and wastewater facilities in meeting a comprehensive
<br /> plan in response to expanded demand and service areas.Client/Contact City of Fort Lauderdale/Paul
<br /> Bohlander,P.E.,Phone:(954) 828-6527.(2003 to 2010)
<br /> ITCHEPACKESSASA CREEK WATER MANAGEMENT FACILITY, POLK COUNTY, FL:
<br /> Principal-in-charge for 265-acre parcel purchased by the County for conversion from pasture to a cp
<br /> water quality treatment facility with active and passive park components. Project considerations
<br /> include uptake of nutrients from existing streams,creation and preservation of wetlands and habitat, I):
<br /> and provisions for a natural ecosystem providing an ancillary affect of stormwater attenuation.Client/
<br /> Contact:Polk County Natural Resources (PCNR)/Robert Kollinger,P.E.Project Manager,Phone:(863)
<br /> 534-7377.(5/09 to 5/1 I)
<br /> BROWARD COUNTY NEIGHBORHOOD IMPROVEMENT PROJECTS, BROWARD 41
<br /> COUNTY, F L: Four individual neighborhood improvement projects ranging from 900 to 1600-acres
<br /> each. Prepare models to identify areas of inadequate fire protection, sewer collection,and drainage. '
<br /> Utilize models to design upgrades to water, force main, lift stations, and drainage. Improvements
<br /> include re-grading of roadways and landscaping.
<br /> ¢tyon KEITH and SCHNARS,P.A.
<br /> FIAIUDAS 5,k LOCAL FIRM
<br /> PAGE 22 RFQJ2-04-02
<br />
|