Laserfiche WebLink
• <br />• • .� :r FRANK VI_LAR P.E. <br /> 0 ti, s� ,tY <br /> .„. Mr.Vilar has over 14 years of extensive professional experience in the design of water/wastewater <br />® a ' .- <br /> �d,f � systems, design of drainage and storm water management systems, site design and development, <br /> / ' 4 -i!y - preparation of contract documents and specifications for bid and permitting services experience <br />® �, `- "' through numerous South Florida agencies. His experience includes design of water and wastewater <br /> ..l _ . improvements for the City of Fort Lauderdale, rehabilitation of lift stations in City of Coconut <br /> - . Creek and North Lauderdale,and neighborhood improvements for the Westgate CRA.Professional <br />® experience also includes work on various land development projects for Seminole Tribe of Florida, <br /> ! Coscan Homes and also administering the NPDES Program for the City of Miami. <br /> ACADEMIC RELEVANT EXPERIENCE <br />® BACKGROUND <br />® M.S.,Environmental FIRST SEMINOLE INDIAN BAPTIST CHURCH ADDITIONAL PARKING, FORT <br /> Engineering,Florida LAUDERDALE, FL: The project scope for the 25-acre site development included parking lot <br />® International University, improvements/expansions,and water mains for fire protection.In addition,the stormwater management <br /> system was expanded and consisted of swales and exfiltration trench to provide pre-treatment,water <br />® 1995 <br /> quality and flood control for the improved site prior to discharging through a control structure into <br />® B.S.,Civil Engineering, the existing FDOT Turnpike Canal adjacent to the site.Drainage Calculations were performed to meet <br /> SFWMD,CBWD criteria and also FDOT. An FDOT Critical Storm Duration Analysis was performed <br />® Florida International on 32 storm events in order to obtain the Drainage Connection Permit from FDOT.Responsibilities <br /> 0 University, 1992 included design of the site plan,water mains for fire protection,paving,grading,and drainage,pavement <br /> marking and signage,and permitting. <br />® AA,Miami-Dade College, <br /> 1988 WESTGATE CRA NORTH INFRASTRUCTURE IMPROVEMENTS PHASES IV, V,AND VI. <br />® WEST PALM BEACH, FL: The proposed improvements included design and permitting services <br /> PROFESSIONAL for the construction of the last three phases of a six phase 140-acre site for the Westgate Community <br />® REGISTRATIONS Redevelopment Agency and located in West Palm Beach.The improvements involved paving,grading <br />® Registered Professional and drainage,water main and sanitary sewer improvements within this existing subdivision comprised <br /> of mainly residential and commercial properties.Responsibilities included the design of water,sewer, <br />® Engineer,FL#55459 drainage, roadway, and pavement marking and signage. Permitting, bidding and negotiating and cost <br /> estimating services were also provided. Client/Contact Westgate CRA/Elizee Michel, Phone: (561) <br /> 0 233-3626.(9/08 to 4/10) <br />® WATER AND WASTEWATER IMPROVEMENT PROJECT FOR LAUDERDALE WEST, <br />® SUNSET NORTH. RIVER RUN, FLAMINGO PARK. OAK RIVER. SHADY BANKS AND <br /> EDGEWOOD COMMUNITIES, BROWARD COUNTY, FL: Project Manager for the design of <br />® water and wastewater improvements for the City of Fort LauderdaleWaterWorks 2011 Program.The <br />® service areas for these projects are comprised of a mixture of single family,multi-family,commercial, <br /> office and industrial uses.The design phase includes over 188,000 linear feet of gravity sewer,20,300 <br />® linear feet of force mains, 16 new wastewater pump stations,and 43,000 linear feet of water mains. <br /> The total construction value was estimated to be 30 million dollars. Client/Contact City of Fort <br />® Lauderdale/Paul Bohlander,P.E.,Phone:(954) 522-2604.(1/03 to 6/09) <br /> 0 SEWER STUDY FOR CHULA VISTA/RIVER LANDS/LAUDERDALE ISLE AND RIVER <br />® LANES COMMUNITIES, BROWARD COUNTY, FL: Project Manager for an engineering study <br /> to provide sanitary sewer systems to several residential communities which are being serviced by <br />® individual septic tank systems and recently annexed by the City of Fort Lauderdale.The study area <br />® comprised of 425-acres of mostly single-family dwellings. The study identified and evaluated several <br /> options to service the subject communities.The recommended wastewater system includes 55,000 <br />® linear feet of gravity sanitary sewer collection systems,7,000 linear feet of force mains and three (3) <br /> wastewater pump stations. The total construction value was estimated to be $10 million. Client/ <br /> 0 Contact City of Fort Lauderdale/Paul Bohlander,P.E.,Phone:(954) 522-2604.(4/03 to 10/03) <br /> 0 ARDEN PARK, HOLLYWOOD, FL: Redevelopment of a former 33-acre mobile home park into <br />® a 153 unit residential development in Hollywood.The design and permitting was done in three phases: <br /> I. demolition phase involved removal of the mobile homes and existing utilities within the site,and <br /> 0 capping the existing utilities at the right of way.2.Lake Improvements Phase involved the partial filling <br />® of two existing lakes and sizing/designing the two proposed lakes that would ultimately serve as the <br /> sites storm water management system. 3. Residential Development phase was the master design <br />® of the potable water, sanitary sewer, paving,grading and drainage, pavement marking & signage and <br /> roadway design for the proposed 153 unit development '' ,`' <br /> 5..KEITH and SCHNARS,RA. <br /> 0 RFQ12-04-02 PAGE 23 <br />