|
0
<br /> „R v Y, i 7 P. wA .
<br /> .�e i' S ( . i A tom' r 0
<br /> �: tf --2, in. v,
<br /> 5 Ms. Howland has over 37 years of professional experience with primary emphasis on
<br /> environmental permitting and compliance. During Ms. Howland's 30-year tenure with the
<br /> �� i FDOT, she was responsible for the District 4 environmental permitting program, which for
<br /> " , several years included Miami-Dade County. She coordinated projects with the state, federal,
<br /> i county and local permitting agencies including the SFWMD, USACE, USCG, FDEP, and PERA
<br /> '' ',*.tri I (formerly DERM). Following her assignment as Permit Coordinator, Ms. Howland served a
<br /> eJ decade in the District Construction Office overseeing environmental construction compliance,
<br /> R,,,,-„„, ,, ,, ,, , ,,-_ NPDES tasks, and actively participated in the resolution of non-compliance issues.
<br /> PROFESSIONAL Since joining Keith and Schnars, Ms. Howland has coordinated the environmental permitting
<br /> CERTIFICATIONS for many civil and highway projects that involved complex coordination with clients, agencies
<br /> Qualified Stormwater and other consultants I
<br /> Management Inspector&
<br /> Instructor—NPDES RELEVANT EXPERIENCE
<br /> Palm Beach County UNIVERSITY OF MIAMI, UHEALTH GABLES MEDICAL CENTER, CORAL
<br /> Stormwater Management GABLES, FL: Ms. Howland serves as the permitting lead for the site development project.
<br /> Inspector—NPDES Permits and authorizations are required from SFWMD, USACE, USCG, PERA, Coral Gables,
<br /> and FDEP for drainage improvements,culvert extensions,and pedestrian and vehicular bridges
<br /> PROFESSIONAL over the Mahi Canal. Client/Contact: UM/Ivette Carcas, Phone: (305)243-9535 (on-going)
<br /> TRAININGS ED
<br /> Project Engineer's School— SR-AlA CONSTRUCTION PROJECTS, FDOT DISTRICT 4, PALM BEACH
<br /> 1999 COUNTY, FL: Ms.Howland provided environmental and permitting oversight on the SR-AIA ED
<br /> construction projects.Tasks included: review of permit documents; permit modifications and
<br /> FHWA Contract submittals;coordination with environmental agencies,contractor,and FDOT;and compliance
<br /> Administration field reviews. Client/Contact: FDOT/Debra Ihsan, PE, Phone: (561) 434-3900. (5/07 to 8/07)
<br /> Water Quality Impact EL RIO CANAL SHARED USE PATHWAY, BOCA RATON, FL: Ms. Howland compiled
<br /> Evaluation the Categorical Exclusion documents needed to obtain federal funds (LAP project). One
<br /> segment involved a County Natural Area requiring a Determination of Section 4(f)Applicability
<br /> Certified Public Manager to be coordinated with the FHWA. El Rio Shared Use Pathway segments required permits
<br /> Courses from the SFWMD, USACE, FWC, and the Lake Worth Drainage District. Client/Contact
<br /> City of Boca Raton/Joy Puerta, Phone: (561) 416-3410. (3/10 to Present)
<br /> Strategic Planning Training ARCH CREEK PEDESTRIAN BRIDGES, NORTH MIAMI, FL: Ms. Howland provided
<br /> AWARDS field documentation for mangrove impacts, processed application packages for SFWMD,
<br /> 1984 District Engineer's USACE, PERA, the USCG to receive authorization for the new pedestrian bridges along 0
<br /> the Arch Creek Bicycle Path near Biscayne Bay. Client/Contact; City of North Miami/Tanya
<br /> Managerial Award Wilson-Sejour, Phone: (305) 895-9826. (on-going)
<br /> 1988 FPL Outstanding RICKEN BACKER FISHING PIER, MIAMI-DADE COUNTY, FL: Ms. Howland
<br /> Quality Performance Award acquired permits for the repair of the Rickenbacker Fishing Pier from PERA, FDEP, SFWMD,
<br /> and USACE.Client/Contact:Miami-Dade County/Juan Santandreu, PE, Phone:(305) 375-3946.
<br /> Awards for resolving permit (1/09 to I 1/09)
<br /> related issues,Hurricane ED
<br /> Andrew aftermath SOUTH FLORIDA STADIUM CORPORATION/MIAMI DOLPHINS,
<br /> MIAMI-DADE COUNTY, FL: Ms.Howland coordinated the resolution of non-compliance
<br /> issues with SFWMD and processed the permitting of seasonal parking on the C-9 Canal right CO
<br /> of way. Client/Contact: South Florida Stadium, LLC/Todd Boyan, Phone: (305) 623-6100.
<br /> (2006 to I/II)
<br /> STORMWATER POLLUTION PREVENTION PLANS, FL: Ms. Howland developed
<br /> and reviewed stormwater pollution prevention plans and performed compliance reviews for
<br /> FDOT construction projects from 1992 through 2001. Since joining Keith and Schnars, she
<br /> has developed and reviewed stormwater pollution prevention plans for landscaping, highway,
<br /> civil site development projects, and for design/build contractors. (1992 to present)
<br /> P��, 0
<br /> ;KEITH and SCHNAKS,P.A. .. „r p„gip
<br /> FLORIoAs EirOCALFIHM PAGE 28 RFQI2-04-02 0
<br />
|