Laserfiche WebLink
0 <br /> „R v Y, i 7 P. wA . <br /> .�e i' S ( . i A tom' r 0 <br /> �: tf --2, in. v, <br /> 5 Ms. Howland has over 37 years of professional experience with primary emphasis on <br /> environmental permitting and compliance. During Ms. Howland's 30-year tenure with the <br /> �� i FDOT, she was responsible for the District 4 environmental permitting program, which for <br /> " , several years included Miami-Dade County. She coordinated projects with the state, federal, <br /> i county and local permitting agencies including the SFWMD, USACE, USCG, FDEP, and PERA <br /> '' ',*.tri I (formerly DERM). Following her assignment as Permit Coordinator, Ms. Howland served a <br /> eJ decade in the District Construction Office overseeing environmental construction compliance, <br /> R,,,,-„„, ,, ,, ,, , ,,-_ NPDES tasks, and actively participated in the resolution of non-compliance issues. <br /> PROFESSIONAL Since joining Keith and Schnars, Ms. Howland has coordinated the environmental permitting <br /> CERTIFICATIONS for many civil and highway projects that involved complex coordination with clients, agencies <br /> Qualified Stormwater and other consultants I <br /> Management Inspector& <br /> Instructor—NPDES RELEVANT EXPERIENCE <br /> Palm Beach County UNIVERSITY OF MIAMI, UHEALTH GABLES MEDICAL CENTER, CORAL <br /> Stormwater Management GABLES, FL: Ms. Howland serves as the permitting lead for the site development project. <br /> Inspector—NPDES Permits and authorizations are required from SFWMD, USACE, USCG, PERA, Coral Gables, <br /> and FDEP for drainage improvements,culvert extensions,and pedestrian and vehicular bridges <br /> PROFESSIONAL over the Mahi Canal. Client/Contact: UM/Ivette Carcas, Phone: (305)243-9535 (on-going) <br /> TRAININGS ED <br /> Project Engineer's School— SR-AlA CONSTRUCTION PROJECTS, FDOT DISTRICT 4, PALM BEACH <br /> 1999 COUNTY, FL: Ms.Howland provided environmental and permitting oversight on the SR-AIA ED <br /> construction projects.Tasks included: review of permit documents; permit modifications and <br /> FHWA Contract submittals;coordination with environmental agencies,contractor,and FDOT;and compliance <br /> Administration field reviews. Client/Contact: FDOT/Debra Ihsan, PE, Phone: (561) 434-3900. (5/07 to 8/07) <br /> Water Quality Impact EL RIO CANAL SHARED USE PATHWAY, BOCA RATON, FL: Ms. Howland compiled <br /> Evaluation the Categorical Exclusion documents needed to obtain federal funds (LAP project). One <br /> segment involved a County Natural Area requiring a Determination of Section 4(f)Applicability <br /> Certified Public Manager to be coordinated with the FHWA. El Rio Shared Use Pathway segments required permits <br /> Courses from the SFWMD, USACE, FWC, and the Lake Worth Drainage District. Client/Contact <br /> City of Boca Raton/Joy Puerta, Phone: (561) 416-3410. (3/10 to Present) <br /> Strategic Planning Training ARCH CREEK PEDESTRIAN BRIDGES, NORTH MIAMI, FL: Ms. Howland provided <br /> AWARDS field documentation for mangrove impacts, processed application packages for SFWMD, <br /> 1984 District Engineer's USACE, PERA, the USCG to receive authorization for the new pedestrian bridges along 0 <br /> the Arch Creek Bicycle Path near Biscayne Bay. Client/Contact; City of North Miami/Tanya <br /> Managerial Award Wilson-Sejour, Phone: (305) 895-9826. (on-going) <br /> 1988 FPL Outstanding RICKEN BACKER FISHING PIER, MIAMI-DADE COUNTY, FL: Ms. Howland <br /> Quality Performance Award acquired permits for the repair of the Rickenbacker Fishing Pier from PERA, FDEP, SFWMD, <br /> and USACE.Client/Contact:Miami-Dade County/Juan Santandreu, PE, Phone:(305) 375-3946. <br /> Awards for resolving permit (1/09 to I 1/09) <br /> related issues,Hurricane ED <br /> Andrew aftermath SOUTH FLORIDA STADIUM CORPORATION/MIAMI DOLPHINS, <br /> MIAMI-DADE COUNTY, FL: Ms.Howland coordinated the resolution of non-compliance <br /> issues with SFWMD and processed the permitting of seasonal parking on the C-9 Canal right CO <br /> of way. Client/Contact: South Florida Stadium, LLC/Todd Boyan, Phone: (305) 623-6100. <br /> (2006 to I/II) <br /> STORMWATER POLLUTION PREVENTION PLANS, FL: Ms. Howland developed <br /> and reviewed stormwater pollution prevention plans and performed compliance reviews for <br /> FDOT construction projects from 1992 through 2001. Since joining Keith and Schnars, she <br /> has developed and reviewed stormwater pollution prevention plans for landscaping, highway, <br /> civil site development projects, and for design/build contractors. (1992 to present) <br /> P��, 0 <br /> ;KEITH and SCHNAKS,P.A. .. „r p„gip <br /> FLORIoAs EirOCALFIHM PAGE 28 RFQI2-04-02 0 <br />