|
•
<br /> CARLOS ALCANTARA, P.E.
<br /> Mr. Alcantara is a Senior Project Manager and an engineering professional with over 10
<br /> • - - ' ` years of experience that encompasses: plans preparation and development, roadway design,
<br /> ® — 7 maintenance of traffic, lighting design, utility coordination, signalization design, signing &
<br /> 1 pavement marking design and drainage.
<br /> RELEVANT EXPERIENCE
<br /> • ' • SR-5/US-1/BISCAYNE BOULEVARD, FPID: 414624-1-52-01, MIAMI-DADE
<br /> ® ACADEMIC COUNTY. FL: Engineer of Record responsible for the roadway, lighting and maintenance
<br /> BACKGROUND of traffic for the reconstruction of Biscayne Boulevard (SR-5/US-I) from NE 15th Street to
<br /> • B.S., Civil Engineering, NE 35th Terrace. The project includes the construction of a new 5-lane section, deep well
<br /> ® University of Florida, 2001 and injection well drainage system, decorative lighting, signalization, signing and pavement
<br /> markings and landscaping. Project Length: 1.4 Miles. Client/Contact FDOT District 6/Jose
<br /> • PROFESSIONAL Barrera, P.E., Phone: (305) 470-5260. (10/05 to 4/09)
<br /> REGISTRATION
<br /> • Registered Professional SW 157TH AVENUE, MIAMI-DADE COUNTY, FL: Currently Project Manager for
<br /> ® Engineer, FL#64760 design and preparation of construction documents for the widening of SW 157th Avenue
<br /> from SW 184th Street to SW 152nd Street from a two-lane undivided facility to a four-lane
<br /> ® PROFESSIONAL divided facility. Project also includes over 2 miles of self-contained exfiltration trench
<br /> • CERTIFICATIONS drainage,signalization, lighting, signing and marking. Project Length: 2.0 Miles. Client/Contatt:
<br /> FOOT Advanced Work Miami-Dade County Public Works Department/Raul Quintela, P.E., Phone: (305) 375-3971.
<br /> ® Zone (8/07 to Present)
<br /> ® Traffic Control Certified CR-664. BARTOW, FL: Engineer of record responsible for the Roadway, Signalization
<br /> and Signing and Pavement Markings Plans for improvements along CR-664 from Doc Coil
<br /> • Road to Hardee Street. The roadway improvements included milling and resurfacing and
<br /> ® cross-slope correction. Other improvements include the replacement of an existing box
<br /> culvert located at the West city limit of Bowling Green, guardrail upgrade and replacement,
<br /> • and reworking of shoulders. The project also included the upgrading of all ADA ramps to
<br /> ® meet current standards as well as replacing all damaged sidewalk so that a safe and navigable
<br /> surface is provided for the pedestrians on the corridor. The project also involved placing
<br /> new signs, bringing all signs up to current standards, and the replacement of signal loop
<br /> detection at US-17. Project Length: 3.53 Miles. Client/Contact FDOT District I/Kevin Ingle,
<br /> ® P.E., Phone: (863) 519-2740. (3/10)
<br /> • UNIVERSITY OF MIAMI, CORAL GABLES, FL: Currently Project Manager responsible
<br /> • for design and preparation of construction documents for an internal circulation roadway
<br /> • throughout the University of Miami campus. Also, Project Manager for various external
<br /> roadway projects that the University must complete in order to comply with several City of
<br /> • Coral Gables ordinances. Client/Contact University of Miami/Christopher Blair, P.E., Phone:
<br /> • (305) 284-6951. (7/06 to Present)
<br /> • SAWGRASS EXPRESSWAY, BROWARD COUNTY, FL: Design-Build Project Manager
<br /> • and Engineer of Record responsible for design and preparation of roadway construction plans
<br /> • and permitting for Florida's Turnpike Enterprise. Scope of work includes the construction
<br /> of dedicated Sunpass lanes with signature gantries at four (4) interchanges on the Sawgrass
<br /> • Expressway. The interchanges involved were Commercial Boulevard, Atlantic Boulevard,
<br /> Sample Road and University Drive. Client/Contact Florida's Turnpike/James Sanchez, P.E.,
<br /> • Phone: (407) 532-3999 ext. 3692. (10/07 to 5/08)
<br /> I
<br /> •
<br /> e /i�'1�KEITH and SCHNARS,RA.
<br /> • RFQI2-0402 PAGE 29 '1�� ' Ftoru°k5I LOCAL FIRM
<br />
|