|
0
<br /> r r
<br /> , •
<br /> 5v,- fb
<br /> "to '
<br /> w �W MATT IDOL l Ta. •
<br /> a 3 ,a,,,r o : Mr. Neddeff is an engineering professional experienced in the production of roadway design.
<br /> d.e. g ,, He has provided roadway design services for various FDOT and municipal projects. Mr.
<br /> iii r.' . Neddeffs involvement in roadway design is as follows: flexible pavement design, development
<br /> F° f " ` 6 s of typical section packages, design of horizontal and vertical geometry, signing and pavement
<br /> f, marking design,signalization design,utility coordination,work zone traffic control,computation
<br /> \, kei4 1 j of quantities, specification development and assisted in drainage design. He has developed
<br /> II,; ,II n , ,,J( qq� expertise in the use of AASHTO, FDOT and municipality design standards. He has also
<br /> I" Il, t ,� f:n j�IIj j I�j I Y.
<br /> �. ,,, _ ,� prepared Geotechnical Reports. Mr. Neddeff is proficient with Microstation/Geopak and
<br /> other software that aids in the efficient design and production of roadway plans.
<br /> ACADEMIC
<br /> BACKGROUND RELEVANT EXPERIENCE
<br /> B.S.,Civil Engineering,
<br /> University of Florida,2005 EL RIO CANAL SHARED USE PATHWAY, FPI D: 423812-1-58-01, PALM BEACH
<br /> COUNTY, FL: Lead Designer tasked with the development of complete construction plans
<br /> PROFESSIONAL and specifications. The project scope includes the construction of a 12 foot wide concrete
<br /> REGISTRATION path, and a signalized crosswalk where the proposed path meets Congress Avenue. The
<br /> Registered Professional project also involves ADA ramp improvements, signing and marking, sidewalk construction,
<br /> Engineer,FL#71611 utility coordination, permitting, signal video detection improvements and landscaping. Client/
<br /> Contact: City of Boca Raton/Joy Puerta, Phone: (561) 416-3410, email:jpuerta@ci.boca-raton.
<br /> PROFESSIONAL flus (3/10 to Present)
<br /> CERTIFICATIONS SR-713/KINGS HIGHWAY RRR, FPID: 422957-1-52-01, ST. LUCIE COUNTY,
<br /> Specification Certified FL: Assisted Project Manager with the development of complete construction plans and
<br /> specifications. The project scope includes the milling & resurfacing of a 2 mile section of
<br /> SR-713/Kings Highway in St. Lucie County from Indrio Road to Spanish Lakes Boulevard. The
<br /> project also involves widening design for a new left turn lane, signalization upgrades, ADA
<br /> ramp improvements,signing and marking, sidewalk construction, drainage modifications, utility
<br /> coordination,permitting,signal video detection improvements and landscaping.Client/Contact:
<br /> FDOT District 4/Nadir Rodriguez, P.E., Phone: (954) 777-4385, email: nadir.rodriguez@dot.
<br /> state.fl.us. (12/08 to Present)
<br /> SR-826 INTERCHANGE AT NW 122ND STREET, MIAMI-DADE COUNTY, FL:
<br /> Provided complete utility coordination services including the development of the final Utility
<br /> Certification Package. Client/Contact: FDOT District 6/Judy Solaun-Gonzalaz, Phone: (305)
<br /> 470-5207, email: judy.solaun@dot.state.fl.us (1/08 to 6/10)
<br /> SR-826 INTERCHANGE AT NW 122ND STREET, MIAMI-DADE COUNTY, FL:
<br /> Provided complete utility coordination services including the development of the final Utility
<br /> Certification Package. Client/Contact: FDOT District 6/Judy Solaun-Gonzalaz, Phone: (305)
<br /> 470-5207, email: judy.solaun@dot.state.fl.us (1/08 to 6/10) 0
<br /> DISTRICTWIDE UTILITY COORDINATION, BROWARD COUNTY, FL: Utility
<br /> Coordinator responsible for assisting the Senior Utility Coordinator with the management of
<br /> the contract. Responsibilities include the identification of existing and proposed utility facilities,
<br /> determination of eligibility of compensable interests, resolution of conflicts between utility
<br /> facilities and proposed construction. Also responsible for securing executed legal agreements j
<br /> (Utility Work Change Orders, JPAs, MOAs etc). Client/Contact: FDOT District 4/Anne
<br /> Endsley, Phone: (954) 777-4128, email: anne.endsley@dot.state.fl.us. (11/05 to Present) 40
<br /> DOLPHIN STADIUM, MIAMI-DADE COUNTY, FL: Created plans necessary to
<br /> re-permit parking along the Snake Creek Canal. Lead Designer responsible with creating 00
<br /> post-game stadium exit concepts, which included; closing down north bound (NB) Turnpike
<br /> at Golden Glades Interchange and re-routing traffic to north bound (NB) 1-95 by use of MOT
<br /> standards and DMS signs to alert drivers along all roadways leading to NB turnpike. Developed
<br /> plans to install new guide signs for the stadium along Florida's Turnpike and 1-95. Worked
<br /> with the Miami Dolphins in developing a MOT plan for the Dolphin Cycling Challenge which
<br /> was an extensive MOT plans that took place in many major roads of the Miami-Dade, Broward
<br /> and Palm Beach Area. Client/Contact: Miami Dolphins/Todd Boyan, Phone: (305) 943-6550,
<br /> email: tboyan@dolphins.com. (8/08 to 11/10)
<br /> KEITH#'k' .?1CHP.A.and SNARS,
<br /> ___ FLORIDAS 61,LOCAL FIRM
<br /> PAG F. 30 RFQI2-04-02
<br />
|