Laserfiche WebLink
0 <br /> r r <br /> , • <br /> 5v,- fb <br /> "to ' <br /> w �W MATT IDOL l Ta. • <br /> a 3 ,a,,,r o : Mr. Neddeff is an engineering professional experienced in the production of roadway design. <br /> d.e. g ,, He has provided roadway design services for various FDOT and municipal projects. Mr. <br /> iii r.' . Neddeffs involvement in roadway design is as follows: flexible pavement design, development <br /> F° f " ` 6 s of typical section packages, design of horizontal and vertical geometry, signing and pavement <br /> f, marking design,signalization design,utility coordination,work zone traffic control,computation <br /> \, kei4 1 j of quantities, specification development and assisted in drainage design. He has developed <br /> II,; ,II n , ,,J( qq� expertise in the use of AASHTO, FDOT and municipality design standards. He has also <br /> I" Il, t ,� f:n j�IIj j I�j I Y. <br /> �. ,,, _ ,� prepared Geotechnical Reports. Mr. Neddeff is proficient with Microstation/Geopak and <br /> other software that aids in the efficient design and production of roadway plans. <br /> ACADEMIC <br /> BACKGROUND RELEVANT EXPERIENCE <br /> B.S.,Civil Engineering, <br /> University of Florida,2005 EL RIO CANAL SHARED USE PATHWAY, FPI D: 423812-1-58-01, PALM BEACH <br /> COUNTY, FL: Lead Designer tasked with the development of complete construction plans <br /> PROFESSIONAL and specifications. The project scope includes the construction of a 12 foot wide concrete <br /> REGISTRATION path, and a signalized crosswalk where the proposed path meets Congress Avenue. The <br /> Registered Professional project also involves ADA ramp improvements, signing and marking, sidewalk construction, <br /> Engineer,FL#71611 utility coordination, permitting, signal video detection improvements and landscaping. Client/ <br /> Contact: City of Boca Raton/Joy Puerta, Phone: (561) 416-3410, email:jpuerta@ci.boca-raton. <br /> PROFESSIONAL flus (3/10 to Present) <br /> CERTIFICATIONS SR-713/KINGS HIGHWAY RRR, FPID: 422957-1-52-01, ST. LUCIE COUNTY, <br /> Specification Certified FL: Assisted Project Manager with the development of complete construction plans and <br /> specifications. The project scope includes the milling & resurfacing of a 2 mile section of <br /> SR-713/Kings Highway in St. Lucie County from Indrio Road to Spanish Lakes Boulevard. The <br /> project also involves widening design for a new left turn lane, signalization upgrades, ADA <br /> ramp improvements,signing and marking, sidewalk construction, drainage modifications, utility <br /> coordination,permitting,signal video detection improvements and landscaping.Client/Contact: <br /> FDOT District 4/Nadir Rodriguez, P.E., Phone: (954) 777-4385, email: nadir.rodriguez@dot. <br /> state.fl.us. (12/08 to Present) <br /> SR-826 INTERCHANGE AT NW 122ND STREET, MIAMI-DADE COUNTY, FL: <br /> Provided complete utility coordination services including the development of the final Utility <br /> Certification Package. Client/Contact: FDOT District 6/Judy Solaun-Gonzalaz, Phone: (305) <br /> 470-5207, email: judy.solaun@dot.state.fl.us (1/08 to 6/10) <br /> SR-826 INTERCHANGE AT NW 122ND STREET, MIAMI-DADE COUNTY, FL: <br /> Provided complete utility coordination services including the development of the final Utility <br /> Certification Package. Client/Contact: FDOT District 6/Judy Solaun-Gonzalaz, Phone: (305) <br /> 470-5207, email: judy.solaun@dot.state.fl.us (1/08 to 6/10) 0 <br /> DISTRICTWIDE UTILITY COORDINATION, BROWARD COUNTY, FL: Utility <br /> Coordinator responsible for assisting the Senior Utility Coordinator with the management of <br /> the contract. Responsibilities include the identification of existing and proposed utility facilities, <br /> determination of eligibility of compensable interests, resolution of conflicts between utility <br /> facilities and proposed construction. Also responsible for securing executed legal agreements j <br /> (Utility Work Change Orders, JPAs, MOAs etc). Client/Contact: FDOT District 4/Anne <br /> Endsley, Phone: (954) 777-4128, email: anne.endsley@dot.state.fl.us. (11/05 to Present) 40 <br /> DOLPHIN STADIUM, MIAMI-DADE COUNTY, FL: Created plans necessary to <br /> re-permit parking along the Snake Creek Canal. Lead Designer responsible with creating 00 <br /> post-game stadium exit concepts, which included; closing down north bound (NB) Turnpike <br /> at Golden Glades Interchange and re-routing traffic to north bound (NB) 1-95 by use of MOT <br /> standards and DMS signs to alert drivers along all roadways leading to NB turnpike. Developed <br /> plans to install new guide signs for the stadium along Florida's Turnpike and 1-95. Worked <br /> with the Miami Dolphins in developing a MOT plan for the Dolphin Cycling Challenge which <br /> was an extensive MOT plans that took place in many major roads of the Miami-Dade, Broward <br /> and Palm Beach Area. Client/Contact: Miami Dolphins/Todd Boyan, Phone: (305) 943-6550, <br /> email: tboyan@dolphins.com. (8/08 to 11/10) <br /> KEITH#'k' .?1CHP.A.and SNARS, <br /> ___ FLORIDAS 61,LOCAL FIRM <br /> PAG F. 30 RFQI2-04-02 <br />