Laserfiche WebLink
• <br /> I ) <br /> 1 ) I/:-.4410 i <br /> a (It ; . RICK SAC KMAN <br /> ® II fih. <br /> d. £. J , j/ Mr. Sackman has more than 41 years of experience in office engineering, office administration and <br /> • I — f contract support, mostly while working for FDOT District 6. His responsibilities have included <br /> ' ` preparation of proposed projects and contract reports. Prepare final estimates, track and review <br /> • lei v . project documentations. Verify that quantities are correctly submitted for final estimates, prepare <br /> �_>, contract past performance rating reports, begin and end construction notices, maintain and enter <br /> • I manpower data in the profile database for the residency, maintain residency set of construction <br /> • I p; �.� • plans, contracts, special provisions and files. Mr. Sackman also perform quality assurance reviews as <br /> F -- assigned by the resident engineer and assist other resident personnel in assignments as requested <br /> • `` ^---• - -- ,, by the resident engineer. <br /> PROFESSIONAL <br /> • CERTIFICATIONS RELEVANT EXPERIENCE <br /> Site manager(Construction WORK GROUPS: 10.1. 10.3 & 10.4 (41 YEARS) <br /> Management System) <br /> • LIMS MARTIN LUTHER KING ROAD RECONSTRUCTION, MIAMI-DADE COUNTY, FL: <br /> • Profile (Project Database Contract Support Specialist - Project involves drainage, optional base, utility relocation, sidewalks, <br /> sidewalk pavers, landscaping, and lighting. Client/Contact City of Miami/Lionel Zapata, P.E., Project <br /> • Tracking Program) Manager, Phone: (305) 216-2056. Assigned to the FDOT District 6 Lakeside Building and Sunguide <br /> • Building Remedial Repairs. Client/Contact: FDOT District 6/Hector A. Rodriguez, P.E., Project <br /> Final Estimates- Manager, Phone: (305) 216-4960. (8/06 to Present) <br /> • Level I & II <br /> GLEN ROYAL PARKWAY, BATTERSEA ROAD DRAINAGE IMPROVEMENTS, <br /> • MIAMI-DADE COUNTY, FL: Projects involve drainage, optional base, utility relocation, <br /> sidewalks, sidewalk pavers, landscaping, and lighting. City of Miami Project Manager: Lionel Zapata, <br /> • P.E., Phone: (305) 216-2056. <br /> • FDOT DISTRICT6CONSTRUCTION REMEDIAL REPAIRS TO THE I.T.S. SUNGUIDE <br /> • BUILDING, LAKESIDE BUILDING, AND A/C/ REPLACEMENT MAIN BUILDING, <br /> MIAMI-DADE COUNTY. FL: Assigned to the FDOT District 6 Lakeside Building and Sunguide <br /> • Building Remedial Repairs. FDOT Project Manager: Hector A. Rodriguez, P.E., Phone: (305) <br /> • 216-4960. <br /> • SEMINOLE TRIBE OF FLORIDA SNAKE ROAD PROJECT: Contract Support Specialist <br /> - Responsibilities include preparation of proposed project reports with pictures, preparation of <br /> • contract reports. Preparation of the Final Estimates for projects under the supervision of Mr. <br /> Dewey Oliver. Verify that quantities are correctly submitted to FDOT District 4 final estimates. <br /> • Attend project status meetings and prepare meeting minutes. Assist in the completion of monthly <br /> • progress payments to the contractor. Track and review project documentation;this include monthly <br /> status reports, weather letters, contractor's past performance rating, begin and eng construction <br /> • notices, supplemental agreements, field supplemental agreements and work orders. Client/Contact <br /> Seminole Tribe of Florida/Dewey Oliver, Keith and Schnars Project Manager,Phone:(772)260-0187. <br /> • (10/05 to 7/06) <br /> • AIM ENGINEERING & SURVEYING. INC., RIVIERA BEACH. FL: Contract Support <br /> • Specialist- Responsibilities included preparation of monthly project progress reports with pictures, <br /> project construction and CEI construction cost graphs. Preparation of contract past performance <br /> • rating reports. Preparation of the final estimates for projects under the supervision of Mr. <br /> Chin. Verify that quantities are correctly submitted for final estimates. Attend project meetings <br /> • and prepare meeting minutes. Assist in the completion of monthly progress payments to the <br /> • contractor. Track and review project documentation such as; monthly status reports, weather <br /> letters, contractor's past performance rating, begin and end construction notices, supplemental <br /> • agreements, field supplemental agreements and work orders. <br /> • FDOT DISTRICT 6, MIAMI-DADE COUNTY. FL: Engineer Level III - Responsible for <br /> • supporting the North Miami-Dade Construction Residency in the areas of Final Estimates and <br /> Contract Administration Documentation. Specific duties were contract administration, final <br /> • estimates packages review, and others are requested by the resident engineer; such as maintain and <br /> enter manpower data in the profile database for the residency,maintain residency set of construction <br /> • plans, contracts, special provisions, and files. Distribute plans, plan revisions, specification packages <br /> and computation books to the assigned project engineer or project administrator. Perform quality <br /> • assurance reviews. (2/70 to 1/05) <br /> •lam -- . ___ i.?(1]�\IKEITH and SCHrcARS,OCAL RA. <br /> • RFQ_12-04-02 PAGE 33 --` 5� <br /> J <br />