Laserfiche WebLink
• K MEC <br /> ® l• I. ti fl l: t: I' n <br /> capacity improvements which consist of pipe/manhole up-sizing, water main upgrades, relocation of <br /> • water meters/meter boxes, new decorative lighting system, landscape and irrigation upgrades, <br /> • replacement of curb & gutter and sidewalk, compliance with ADA requirements, modification of <br /> parking space layout and relocation of existing utilities. Responsible for the construction <br /> • administration related to the project. Some of the construction administration services provided for <br /> • this project included but not limited to weekly construction/coordination meetings, all shop drawing <br /> • program functions, respond to request for information (RFI's), evaluation request for changes to <br /> project schedules, contract documents clarifications, inspect all MOT operations, and review, track <br /> and maintain construction schedules. <br /> • Florida Department of Transportation (FDOT) District VI, Miami Intermodal Center (MIC) (1993- <br /> 2005) Mr. Mohandes served as FDOT's Program Manager. The MIC, Florida's largest transportation <br /> • project and a project of national significance was estimated to cost approximately 1.4 billion dollars. <br /> ® Mr. Mohandes reported directly to the district secretary. The MIC is being designed and built to <br /> solve the pressing transportation needs in Miami-Dade County, currently ranked the third most <br /> • congested area in the country. It will be a transfer point providing connectivity for this community's <br /> • various modes of ground transportation including Miami-Dade Transit Authority, Greyhound bus <br /> lines, Tri-Rail and Amtrak. Currently, such a connecting point does not exist anywhere in Miami- <br /> • Dade County. The MIC will also decongest ground transportation access to Miami International <br /> • Airport (MIA), the eighth largest airport in the U.S. and one of the fastest growing. MIC was the first <br /> project to receive a loan under the federal Transportation Infrastructure Finance and Innovation Act <br /> • (TIFIA), part of the Transportation Equity Act for the 21st Century, or TEA-21. <br /> • The MIC Program includes the Rental Car Center (RCC), Miami Central Station (MCS), MIA Mover <br /> • and major roadway improvements, all to be completed by 2012. FDOT is also pursuing private <br /> • and/or public sector joint development projects to enhance the MIC's economic viability. Miami-Dade <br /> County is developing the MIC-Airport Link Metrorail Extension bringing Metrorail service to MIA via <br /> • the Miami Central Station by 2012. One of the major roadway improvements includes the Le Jeune <br /> Road/MIA Interchange reconstruction with 12 new and/or reconstructed bridges, reconstruction of <br /> NW 14th Street from NW 34th Avenue to NW 42`d Court, MIA Tri-Rail Station relocation and <br /> • improvements, MIA Mover Guideway (light rail system from MIC/MIA Station to MIA Station) with 7' <br /> • and 12' diameter by 80' deep concrete drilled shafts, and the future MIC Core private development. <br /> • Mr. Mohandes was responsible for the management of this mega-project from the PD&E, right-of- <br /> • way acquisition, utility relocation coordination, design of bridges and roadways, and construction <br /> • management, engineering and inspection services. Turner Construction Company was the <br /> Construction Manager contracted by the FDOT under the CM @ Risk process to construct this <br /> • project, which is currently ongoing. Mr. Mohandes continued as Program Manager of this project for <br /> • approximately 2.5 years of this phase of the project. <br /> East/West Multimodal Corridor (EWC) (1993-1998) Mr. Mohandes served as FDOT's Program <br /> • Manager for the 22-mile long transit project beginning at the Tamiami Campus of Florida <br /> • International University (FIU), and extending the length of SR-836, pass MIA, through Downtown <br /> Miami to the port, across Biscayne Bay to South Beach, and ending at the Miami Beach Convention <br /> • Center. EWC was the first transit project in Miami-Dade County to obtain a record of decision in <br /> • August of 1998. Mr. Mohandes was responsible for this Mega PD&E project all the way to the Final <br /> Environmental Impact Statement (FEIS) at which point the project was transferred to Miami Dade <br /> • County for the next phase. <br /> • <br /> • <br /> • <br /> • 18625 Atlantic Blvd. Sunny Isles Beach, FL 33160 Phone 786-586-7779 Fax 305-402-2208 E-mail Kouroche@kmecinc.com <br />