Laserfiche WebLink
0 <br /> CITY OF SUNNY ISLES BEACH <br /> SECTION FOUR: APPROACH/METHODOLOGY <br /> • QUALITY ASSURANCE/ will be checked on a line-by-line basis for adherence to the <br /> ® QUALITY CONTROL following items: <br /> ® K&S recognizes that a QA/QC program is a benefit to ' methodology analyses; <br /> • accuracy; <br /> • both the City and the Consultant,and we are aggressively . adequacy of delineation and notation;and <br /> • committed to a practical and useful QA/QC Program. Our . interface with other elements and components. <br /> program will ensure not only that the final products reflect <br /> • the highest standards, but also that deliverables conform to Our strict adherence to this quality control plan will help <br /> ® the Scope of Services and are free of errors and omissions. us provide the City with technically sound and accurately <br /> Quality, accuracy, and completeness will be provided by prepared work products. <br /> 0 adherence to the processes outlined in the Quality Assurance/ <br /> • Quality Control Plan detailed below. The products prepared by the Team's subconsultants will be <br /> 0 Quality Assurance subject to the same level of quality control review discussed <br /> above. This quality control will be performed directly by the <br /> ® The Quality Assurance (QA) program provides a framework respective subconsultants. In addition,copies of the products <br /> • where reviews for all work elements are made prior to each prepared by the subconsultants will be checked by K&S for <br /> submittal.The depth of the quality assurance oversight ensures accuracy and consistency with the overall scope of services <br /> ® that the project staffing is appropriate, that proper direction and intent of the task.Strict adherence to this quality control <br /> • has been provided, that project decisions are documented, plan will assure a technically sound and accurately prepared <br /> • that the Quality Control (QC) program is being followed,and product is provided to the City. <br /> that the project is being developed in accordance with our <br /> • QC plan. ENVIRONMENTAL PERMITTING <br /> ® Documentproduction,reportpreparation,andtaskdeliverables Nearly every design project involves some form of federal, <br /> • for the project will use the process described in our quality state or local permitting,and often the procurement of these <br /> • control plan below. We will naturally adhere to the City's permits must be expedited. K&S has more than 30 years of <br /> requirements on all submittals, where applicable (e.g. plans experience obtaining and modifying permits from the USArmy <br /> • preparation),to assure a quality final product. MarkTomczyk, Corps of Engineers (Section 404), US Coast Guard (Bridge <br /> PE.,Vice President, will be responsible for implementing the Permits), Florida Department of Environmental Protection <br /> ® QA program. Mr.Tomczyk will ensure that the quality control (ERR UIC, SSL Authorization, CGP), Florida Fish and Wildlife <br /> • procedures required by the City are implemented for the Conservation Commission and US Fish and Wildlife Service <br /> engineering tasks assigned under this contract. Mr. Hall will (Species Relocation Permits, Disturbance Permits),the South <br /> • maintain all records detailing with the specifics of the quality Florida Water Management District (ERR RAN Occupancy <br /> • control activities performed. Permits,Consumptive Use Permits),and local agencies (PERA, <br /> ® City, local 298 drainage district, building permits, etc.). As a <br /> Quality Control result we have developed excellent relationships not only with <br /> • permitting agencies but with commenting agencies such as <br /> The following is a general summary of our daily QC measures the State Historic preservation Officer (SHPO) and National <br /> • that we will use to ensure a complete and accurate final Marine Fisheries Service(NMFS). <br /> • product for each task. Reports and studies will be reviewed <br /> • by the K&S' Project Manager to ensure technical accuracy,and Joyce Howland is one of our Senior Permit Coordinators. Her <br /> by the QA/QC manager assigned to the project to ensure notable career encompasses 30 years of permitting,much of it <br /> • an overall quality work product We use a checklist and sign- with the FDOT. Her projects have included coastal highways <br /> off sheet for each work product developed for delivery to and bridges; ICWbridges; new corridors and upgraded <br /> • W the client These sheets are maintained in the project files to highway facilities;wetlands and mitigation areas;surface water <br /> • document our efforts. For plans quality control,we utilize a issues;site development; multi-use trails;violation issues;and <br /> • "check print" system. Our technicians and engineers utilize a erosion control. <br /> color-coded notation system to ensure that all changes and <br /> • additions are appropriately implemented. Use of the color- Our permitting experts possess current knowledge of <br /> • coded method saves time in checking,helps us avoid careless permitting criteria to quickly assess the needs, recommend <br /> mistakes,and gives our production personnel the opportunity solutions,and process permits and modifications. We believe <br /> • to learn from their mistakes. Reports, figures, and drawings in proactively addressing permitting issues at a project's early <br /> • <br /> • <br /> _ Iij4 KEITH and SCH\ARS,P.A. <br /> RFQ_I2-04-02 PAGE 41 i rnwat&igtpcw FIRM <br />