My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McMahon Transportation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
McMahon Transportation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 4:50:17 PM
Creation date
2/3/2016 4:47:42 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Architectural & Engineering Services 2.0 Qualifications <br /> 1 RFQ No. 12-04-02 <br /> turtle nesting areas, and the drainage challenges of working on a barrier island with little vertical relief. <br /> This project was divided into two (2) phases. Phase I involved working with the County and Town to <br /> determine the pilot section. Phase II moved forward with the design and post design services to <br /> implement the approximately one mile piece chosen from the Master Plan. <br /> SERVICE TYPE— TRAFFIC ENGINEERING DESIGN/SIGNAL DESIGN <br /> McMahon has provided consulting engineering/design services to both public and private clients. Our <br /> expertise ranges from traffic calming plans, access permits and median modifications, to traffic signal <br /> installation projects. As part of our design services, we developed traffic control plans, utility <br /> relocation plans, and traffic signal and corridor timing plans. <br /> Design Consulting Services <br /> Commodore Bicycle Trail — Multiuse Path, Miami-Dade County Public Works Department, Miami-Dade <br /> County, FL <br /> Lana Moorey, P.E., Project Manager <br /> 111 NW 1st Street, Suite 1510 <br /> Miami, FL 33128-1970 <br /> (305) 375-2863 <br /> McMahon provided project management and oversight of the design and construction plans for Bicycle <br /> Route No. 1. This three-mile section of the bicycle route incorporated the design criteria for a multi-use <br /> path, bicycle lanes and shared use roadways. The project also included coordinating the design of the <br /> footings for a multi-use trail bridge, for pedestrian and bicycles, over the Coral Gables Waterway. In <br /> addition, significant coordination was required with the City of Miami, City of Coral Gables, Miami- <br /> 1 Dade County Metropolitan Planning Organization and Parks and Recreation Department, to obtain <br /> approval and the permit to construct the project. <br /> Morteza Allan, District Consultant Management Engineer <br /> FDOT District Four, Consultant Management <br /> 3300 W. Commercial Boulevard <br /> Fort Lauderdale, FL 33309 <br /> (954) 777-4449 <br /> 1 Provided design engineering consulting services to the Department on a multi-task work order contract <br /> for transportation engineering and the development of construction plans and specifications (1999- <br /> 2005). Services included: intersection operation analyses; traffic impact studies; intersection <br /> 1 operational improvement plans; milling and resurfacing; drainage analysis; traffic signalization; and <br /> lighting. <br /> 1 <br /> 1 <br /> AMCMAHON <br /> 2-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.