Laserfiche WebLink
Continuing Professional Architectural &Engineering Services 3.0 Staffing <br /> RFQ No. 12-04-02 <br /> I <br /> 3.0 STAFFING <br /> 3.1 Contact Person <br /> ' John Peter Kim, P.E., PTOE <br /> Senior Project Manager—Traffic <br /> ' 5500 Village Boulevard, Suite 103, West Palm Beach, FL 33407 <br /> Office: 561-840-8650/Fax: 561-840-8590 <br /> Cell: 561-445-6684/Home: 561-627-8249 <br /> Email:john.kim@mcmtrans.com <br /> ' John Kim, a traffic engineer, transportation planner and designer, will serve as the project manager and <br /> primary contact to the City of Sunny Isles Beach for this contract. He is a Florida Registered <br /> Professional Engineer (P.E.) and an Institute of Transportation Engineers Certified Professional Traffic <br /> Operations Engineer (PTOE). His work experience includes employment in the public and private <br /> sectors for planning, operations and design projects/studies. His experience performing transportation <br /> engineering and planning services for public and private sector clients gives him a valuable perspective <br /> ' that will greatly benefit the City. <br /> 1 His experience acquired during his 10 years with McMahon Associates, Inc. serving as a Project <br /> Manager and Senior Project Manager includes the following: <br /> • Serve as the Municipal Traffic Engineer for various Florida municipalities <br /> > Review of traffic impact/concurrency studies and site plans. <br /> > Comprehensive Plan Transportation Element Updates. <br /> Traffic Operational Analysis and Reviews. <br /> > Development of Regional Impact traffic study preparation and review. <br /> Municipal Code Evaluation. <br /> • Serve as the Project Manager for Florida Department of Transportation (FDOT) Traffic <br /> Operations <br /> > Signal Warrant Analysis; School Zone Study; Speed Studies; Strain Pole Analysis; <br /> Travel Time Study; Intersection Assessments; Pedestrian Studies. <br /> > Development of Work Orders for signing or marking installation; Collision <br /> Diagrams; Crash Analysis; Signing and Marking Plans Review; Traffic Data. <br /> Review Signage and Marking and Signal Plans; Field Investigations; and In-house <br /> Review of Consultant Traffic Studies. <br /> 1 • Serve as the Project Manager for FDOT Planning and Environmental Management. <br /> • Prepared Traffic Studies for site development and Future Land Use Amendments. <br /> • Preparation and management of traffic calming studies, parking studies, shared parking <br /> analysis, transportation master plans, parking generation studies and reversible lane <br /> studies. <br /> • Traffic signal and bike path design. <br /> I $McMAHON <br /> 3-1 <br />