My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Systems
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Coastal Systems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 4:49:21 PM
Creation date
2/3/2016 4:49:21 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 1,2012 <br /> COASTAL City of Sunny Isles Beach <br /> Request for Qualifications <br /> �. e,5 1 Continuing Professional Architectural 8 <br /> ,,,,,-....1-1.‘. Engineering Services Firms Only(CCNA) <br /> ® I <br /> rmgY r�r RFQ No.: 12-04-02 Page 1414 <br /> a / —arm w�4 <br /> i _ ---�c=.m— --r'�{ 1�R .; ' _ �. -yam'? ._ Q _ ' <br /> • <br /> T <br /> bra:' O • ' I ' -ice ate'"i t <br /> ii <br /> r 17h1 - - .� <br /> 1:� <br /> l � 1� "� Yea <br /> Acz< <br /> rr. s� f / . A "s lr' `Si:ta Irl .si.: <br /> -.`- Fa, `" Museum Park, Miami, Florida <br /> s k t f Coastal Systems was part of the design team led by the <br /> '' `Y"i5j- architectural firm. Cooper Robertson and Partners, for the <br /> planning and design of the 22-acre city park on the Biscayne Bay <br /> f L'. in downtown Miami. The park project includes both active and <br /> passive recreation areas and a baywalk along the waterfront. <br /> ® r' ' + Coastal Systems worked with the project team for the initial <br /> master planning of the Park that included environmental permit <br /> feasibility studies and conceptual design of waterfront <br /> f ' :-\-FJ\ C' improvements. <br /> ..1: � ., r <br /> Coastal Systems was retained by Cooper Robertson and Partners <br /> to provide civil engineering and environmental permitting <br /> services for the park based on the approved master plan and park <br /> program. The stormwater management system consists of a <br /> combination of exfiltration trenches, retention area within the <br /> park, deep injection drainage wells and outfalls to the bay. The <br /> engineering design required close coordination with the design <br /> team of planners, architects and landscape architects to meet the <br /> design objectives and program for the park. The stormwater <br /> system was designed to meet the stringent guidelines for treating <br /> stormwater runoff on-site for thiswaterfront park that is adjacent <br /> to the environmentally sensitive Biscayne Bay. An Environmental <br /> Resource Permit (ERP) was processed through the Miami-Dade <br /> County Department of Environmental Resource Management <br /> (DERM) for the stormwater management system. Coastal <br /> Systems also prepared and processed the NPDES and FDOT <br /> Permits for the project. <br /> Potable water and sanitary sewer utility services were also <br /> ® designed for the Park. Service connections were coordinated with <br /> Miami-Dade County WASD which included the preparation of <br /> documents for the service agreement with the City. Easements <br /> Corporate Office. 464 South Dille Highway.Coral Gable,Florida Dub•Tel:p5{61.}655•Fs 005b61-1914 <br /> Regional Office, 2047 Vista Parkway.Suite 1:1:WSeix Palm Beach;Florida 33411•Tel 561-643100•Far 561440-1X9 <br /> ow,eoanalsntnnn com•info@<ootatsJ+tnnsinvmm <br />
The URL can be used to link to this page
Your browser does not support the video tag.