Laserfiche WebLink
May 1,2012 <br /> City of Sunny Isles Beach <br /> Request for Qualifications <br /> ti gez. Continuing Professional Architectural 8 <br /> 1 Engineering Services Firms Only(CCNA) <br /> ® YYI MI RFQ No.: 12-04-02 <br /> Page 15 <br /> for the new water lines, including fire hydrants, were established <br /> and designed. To support the Large Vessel Mooring Facility at <br /> the Park, ship water services and a fire protection system were <br /> incorporated into the water distribution system within the Park. <br /> Coastal Systems was retained by the City to prepare construction <br /> documents for the park in three phases; 1) Utility Connections and <br /> 11'" Street entrance; 2) Baywalk and green space, and <br /> 3)Promenade adjacent to the art and science museums adjacent to <br /> the park. Coastal Systems managed the planning/landscape <br /> architect, Savino Miller, as well as soil remediation and electrical <br /> engineering subconsultants to prepare construction documents for <br /> these phases. Construction of Phase I commenced in January, <br /> 2012, and construction of Phase 2 is scheduled for July, 2012. <br /> 4111 <br /> Corporate Office 464 South Dive Hight-ay•Coral Gable,Florida 33146•Tek 325661-3655•Far 3:5461-1914 <br /> Regional Office 2C4:Vitra Park.-ay.Suite 1:1;C'at Palin Bnch:Florida 33411•Tel:561-643-193•Far 561-6412-t S9 <br /> 66-..coaukntansmtcom•info coauhnremamLmm <br />