Laserfiche WebLink
0 <br /> 0 <br /> At <br /> . . :j JJ©ff j 1 D • NIL raw <br /> E F >rrA <br /> L i4 k Mr. Krane has over 23 years of experience in planning, transportation engineering, <br /> ,.:::,.:4. -01.1..„;:, preliminary engineering/PD&E, access management, traffic operations, and safety, with <br /> . 8t` 15-plus years of management experience. His primary areas of expertise include site impact <br /> s' s analyses, intersection and roadway operational and level of service analyses, development <br /> - and application of transportation demand forecasting models, project traffic development, <br /> ,y4ryy, and project management. He currently serves as the Director of Transportation Planning <br /> w, t ... ,> 4x�'.. activities statewide. In addition to acting as senior advisor on division work and project • <br /> Th... . manager for important projects, he is responsible for the oversight of workflow, staff <br /> ACADEMIC development, and Quality Assurance of his Division. <br /> BACKGROUND <br /> B.S.,Civil Engineering, RELEVANT EXPERIENCE 0 <br /> Michigan State University, <br /> /988 GENERAL PLANNING CONSULTANT (GPC), FDOT DISTRICT 4 OFFICE OF <br /> PROFESSIONAL <br /> PLANNING AND ENVIRONMENTAL MANAGEMENT: Senior Project Manager- As <br /> REGISTRATIONS the Director of the Transportation Planning Division, Mr. Krane provides a senior oversight 0 <br /> Registered Professional role for this Keith and Schnars GPC contract with the District's Strategic Intermodal System <br /> Engineer,FL#0048952 section. This is an on-going Task Work Order based contract to assist the unit in conducting 0 <br /> special projects, and other work as requested. <br /> POST GRADUATE 0 <br /> TRAINING GENERAL ENGINEERING CONSULTANT(GEC), FDOT DISTRICT 4 TRAFFIC 0 <br /> Traffic and Transportation OPERATIONS OFFICE: Senior Project Manager - As the Director of the Transportation <br /> Engineering—Northwestern Planning Division, Mr. Krane provides a senior oversight role for this Keith and Schnars GEC 0 <br /> University Troff c Institute contract with the District's Access Management section. This is a Task Work Order based 0 <br /> Planning and Design of contract to assist the unit in conducting special projects, and other work as requested. <br /> Freeways and Interchanges <br /> —Joel P..Leisch DAVIE COMMONS DRI, IMRAND LUPA STUDIES, DAVIE, FL: As the Director <br /> of the Transportation Planning Division, Mr. Krane became the senior advisor to the study <br /> Design,Construction and team preparing complex development related studies including a Development of Regional 0 <br /> Maintenance of Highway Impact(DRI)report, Interchange Modification Report(IMR)and a Land Use Plan Amendment <br /> Safety Features and (LUPA)for a development of 2,000,000 square feet. Mr. Krane's FDOT and policy experience <br /> Appurtenances—National helped the application progress through FDOT and FHWA procedures. 0 <br /> Highway Institute <br /> Basic and Intermediate CROSSTOWN PARKWAY EXTENSION PD&E (EIS), PORT ST. LUCIE, FL: <br /> FSUTMS Modeling—FOOT Senior Project Manager - Mr. Krane is Project Manager for the Project Development and <br /> Environment (PD&E) study for the extension of Crosstown Parkway across the North Fork 0 <br /> Land Use Modeling for St.Lucie River to US-1. This study has been designated as an Environmental Impact Statement <br /> FSUTMS—FDOT (EIS). Mr. Krane is responsible for project coordination between the FDOT, FHWA, the 0 <br /> Leadership Academy—FOOT City of Port St. Lucie, and the State and federal resource and regulatory agencies. The study <br /> is currently in progress. <br /> Various Management and 0 <br /> Communication Classes MATANZAS WOODS AND 1-95 IJR, FLAG LER COUNTY, FL: Mr. Krane was Project <br /> —FDOT Manager for a new interchange proposal along 1-95 between the existing interchanges of Palm <br /> Coast Parkway in Flagler County and US-1 in St.Johns County. The Interchange Justification <br /> Site Impact Training—FDOT Report (IJR) was approved in March 2011. The interchange will enable the reconstruction <br /> Q/LOS Training—FOOT of the existing bridge crossing of Matanzas Woods Parkway into a full interchange with <br /> 1-95. The interchange will serve the City of Palm Coast, Bunnell, and future DRI scale <br /> Highway Capacity Workshop developments that have been approved in the area. <br /> —Northwestern University <br /> Center for Public Safety 0 <br /> PROFESSIONAL 0 <br /> AFFILIATIONS 0 <br /> Member,Institute of <br /> Transportation Engineers (ITE) 0 <br /> 0 <br /> an <br /> KEITH <br /> F'IOH and SCHHNARS,AI.FIRMEA. <br /> :,,tzz P <br /> �� PAGE 18 RFOj2-04-02 0 <br />