Laserfiche WebLink
0 <br /> ti-/q <br /> _� ._ <br /> V '14 'CARLOS ALCANTARA, P E. <br /> fr <br /> • <br /> ® Mr. Alcantara is a Senior Project Manager and an engineering professional with over 10 <br /> • e years of experience that encompasses: plans preparation and development, roadway design, <br /> o <br /> N.,\-1. 7 C fir. maintenance of traffic, lighting design, utility coordination, signalization design, signing & <br /> pavement marking design and drainage. <br /> orAs <br /> RELEVANT EXPERIENCE <br /> o ;- f i r, It <br /> • CITY OF BOCA RATON, PALM BEACH, FL: Lead Project Designer on three work <br /> ACADEM IC orders for the City, tasked with production of construction documents for the addition of a <br /> o BACKGROUND right turn lane at Glades Road and NW 2nd Avenue; the signalization of three intersections <br /> B.S., CM? Engineering, (Jog Road at Woodfield Hunt Club, Clint Moore Road at NW 24th Way and NW 2nd <br /> • University of Florida, 2001 Avenue at NW 28th Street) and the addition of a roundabout at SE 12th Avenue and SW <br /> • 13th Street. <br /> • PROFESSIONAL UNIVERSITY OF MIAMI, CORAL GABLES, FL: Currently Project Manager responsible <br /> REGISTRATION for design and preparation of construction documents for an internal circulation roadway <br /> o Registered Professional throughout the University of Miami campus. Also, Project Manager for various external <br /> o Engineer, FL#64760 roadway projects that the University must complete in order to comply with several City of <br /> Coral Gables ordinances. <br /> • PROFESSIONAL <br /> o CERTI FICATIONS DISTRICTWI DE UTI LITY COORDINATION CONTRACT, BROWARD COUNTY. <br /> FDOT Advanced Work FL: Responsibilities include the identification of existing and proposed utility facilities, <br /> o Zone determination of eligibility of compensable interests, resolution of conflicts between utility <br /> o facilities and proposed construction.Also responsible for securing executed legal agreements <br /> Work Change Orders,JPAs, MOAs etc.) to clear a project for letting, analyzing and <br /> Traffic Control Certified (Utility <br /> • certifying utility relocation schedules for compatibility with FDOT construction schedules. <br /> • NE 125TH STREET STREETSCAPE, MIAMI-DADE COUNTY, FL: Currently <br /> o Engineer of Record responsible for the preparation of roadway construction documents. <br /> The scope of the project includes streetscape improvements which include the placement of <br /> o patterned textured pavement along the existing crosswalks and on-street parking lanes, the <br /> • placement of landscaped bulb outs, and landscape and irrigation along the project corridor. <br /> Project length: 0.526 miles. <br /> • <br /> ® ARCH CREEK BIKE PATH, NORTH MIAMI, FL: The Arch Creek Bike Path and <br /> Pedestrian Bridges is an LAP project being done for the City of North Miami with the addition <br /> • of designated bike lanes, milling and resurfacing, and the construction of two single-span steel <br /> truss pedestrian bridges along the Arch Creek bicycle/shared-use path connecting NE I 35th <br /> • Street and the FIU Biscayne Bay Campus. <br /> o SW 157TH AVENUE, MIAMI-DADE COUNTY, FL: Currently Project Manager for <br /> o design and preparation of construction documents for the widening of SW 157th Avenue <br /> o from SW 184th Street to SW 152nd Street from a two-lane undivided facility to a four-lane <br /> divided facility. Project also includes drainage, signalization, lighting, signing and marking. <br /> o Project Length: 2.0 Miles. <br /> • LEJEUNE ROAD, MIAMI-DADE COUNTY, FL: Assisted Project Manager in the <br /> • production of final construction documents. Responsible for the completion of the roadway <br /> lighting plans and Maintenance of Traffic plans. Served as Lead Designer on the Maintenance <br /> • Lighting system inside the box girders of the Lejeune Road Flyover. <br /> • SR-5/US-1/B ISCAYNE BOULEVARD, FPI D: 414624-1-52-01, Miami-Dade County, <br /> o FL: Engineer of Record responsible for the roadway, lighting and maintenance of traffic for <br /> • the reconstruction of Biscayne Boulevard (SR-S/US-1) from NE 15th Street to NE 35th <br /> Terrace. The project includes the construction of a new 5-lane section, drainage, decorative <br /> • lighting, signalization, signing and pavement markings and landscaping. Project Length: 1.4 <br /> Miles. <br /> ®,,._.._ - -_ :.ii KEITH and SCFR�ARS,P.A. <br /> ]� Q <br /> FIDRIDAS V�IDC.LL FIRM <br /> • RFQ 2-04-02 PAGE 27 -a, <br />