0
<br /> ti-/q
<br /> _� ._
<br /> V '14 'CARLOS ALCANTARA, P E.
<br /> fr
<br /> •
<br /> ® Mr. Alcantara is a Senior Project Manager and an engineering professional with over 10
<br /> • e years of experience that encompasses: plans preparation and development, roadway design,
<br /> o
<br /> N.,\-1. 7 C fir. maintenance of traffic, lighting design, utility coordination, signalization design, signing &
<br /> pavement marking design and drainage.
<br /> orAs
<br /> RELEVANT EXPERIENCE
<br /> o ;- f i r, It
<br /> • CITY OF BOCA RATON, PALM BEACH, FL: Lead Project Designer on three work
<br /> ACADEM IC orders for the City, tasked with production of construction documents for the addition of a
<br /> o BACKGROUND right turn lane at Glades Road and NW 2nd Avenue; the signalization of three intersections
<br /> B.S., CM? Engineering, (Jog Road at Woodfield Hunt Club, Clint Moore Road at NW 24th Way and NW 2nd
<br /> • University of Florida, 2001 Avenue at NW 28th Street) and the addition of a roundabout at SE 12th Avenue and SW
<br /> • 13th Street.
<br /> • PROFESSIONAL UNIVERSITY OF MIAMI, CORAL GABLES, FL: Currently Project Manager responsible
<br /> REGISTRATION for design and preparation of construction documents for an internal circulation roadway
<br /> o Registered Professional throughout the University of Miami campus. Also, Project Manager for various external
<br /> o Engineer, FL#64760 roadway projects that the University must complete in order to comply with several City of
<br /> Coral Gables ordinances.
<br /> • PROFESSIONAL
<br /> o CERTI FICATIONS DISTRICTWI DE UTI LITY COORDINATION CONTRACT, BROWARD COUNTY.
<br /> FDOT Advanced Work FL: Responsibilities include the identification of existing and proposed utility facilities,
<br /> o Zone determination of eligibility of compensable interests, resolution of conflicts between utility
<br /> o facilities and proposed construction.Also responsible for securing executed legal agreements
<br /> Work Change Orders,JPAs, MOAs etc.) to clear a project for letting, analyzing and
<br /> Traffic Control Certified (Utility
<br /> • certifying utility relocation schedules for compatibility with FDOT construction schedules.
<br /> • NE 125TH STREET STREETSCAPE, MIAMI-DADE COUNTY, FL: Currently
<br /> o Engineer of Record responsible for the preparation of roadway construction documents.
<br /> The scope of the project includes streetscape improvements which include the placement of
<br /> o patterned textured pavement along the existing crosswalks and on-street parking lanes, the
<br /> • placement of landscaped bulb outs, and landscape and irrigation along the project corridor.
<br /> Project length: 0.526 miles.
<br /> •
<br /> ® ARCH CREEK BIKE PATH, NORTH MIAMI, FL: The Arch Creek Bike Path and
<br /> Pedestrian Bridges is an LAP project being done for the City of North Miami with the addition
<br /> • of designated bike lanes, milling and resurfacing, and the construction of two single-span steel
<br /> truss pedestrian bridges along the Arch Creek bicycle/shared-use path connecting NE I 35th
<br /> • Street and the FIU Biscayne Bay Campus.
<br /> o SW 157TH AVENUE, MIAMI-DADE COUNTY, FL: Currently Project Manager for
<br /> o design and preparation of construction documents for the widening of SW 157th Avenue
<br /> o from SW 184th Street to SW 152nd Street from a two-lane undivided facility to a four-lane
<br /> divided facility. Project also includes drainage, signalization, lighting, signing and marking.
<br /> o Project Length: 2.0 Miles.
<br /> • LEJEUNE ROAD, MIAMI-DADE COUNTY, FL: Assisted Project Manager in the
<br /> • production of final construction documents. Responsible for the completion of the roadway
<br /> lighting plans and Maintenance of Traffic plans. Served as Lead Designer on the Maintenance
<br /> • Lighting system inside the box girders of the Lejeune Road Flyover.
<br /> • SR-5/US-1/B ISCAYNE BOULEVARD, FPI D: 414624-1-52-01, Miami-Dade County,
<br /> o FL: Engineer of Record responsible for the roadway, lighting and maintenance of traffic for
<br /> • the reconstruction of Biscayne Boulevard (SR-S/US-1) from NE 15th Street to NE 35th
<br /> Terrace. The project includes the construction of a new 5-lane section, drainage, decorative
<br /> • lighting, signalization, signing and pavement markings and landscaping. Project Length: 1.4
<br /> Miles.
<br /> ®,,._.._ - -_ :.ii KEITH and SCFR�ARS,P.A.
<br /> ]� Q
<br /> FIDRIDAS V�IDC.LL FIRM
<br /> • RFQ 2-04-02 PAGE 27 -a,
<br />
|