fi
<br /> : , 3r o r ' e r . �� w " 1' . 'c"�
<br /> C � n Rrq /4"'�f Q I ,�iN !« s r iti r , { lo.°"t°' � ,;U g i �,p
<br /> 1 �'i' n i Al #r r •',� ,' t r d y pr« ika 'sn fR
<br /> - *
<br /> A ) «w'' Mr. Kline has over 28 years of engineering design and management experience with projects
<br /> } , #.: involving roadway design, transportation planning and land development. Mr. Kline has
<br /> "J r become proficient in the engineering design aspects of roadway geometrics, drainage, signing
<br /> ji: « Ai and pavement marking, signalization, lighting and work zone traffic control. He has expertise
<br /> ' r. in the use AASHTO design guidelines and manuals, the FDOT Plans Preparation Manual, the
<br /> FDOT Design Standards, the FDOT Standard Specifications, the Florida Greenbook, the
<br /> . Manual on Uniform Traffic Control Devices (MUTCD) and other important design standards
<br /> and criteria.
<br /> ACADEMIC
<br /> BACKGROUND RELEVANT EXPERIENCE
<br /> B.5,Civil Engineering,
<br /> Ohio University, I983 DISTRICTWIDE GENERAL IN-HOUSE CONSULTANT, FDOT DISTRICT
<br /> 4: Responsible for constructability and bidability phase plan reviews related to various
<br /> PROFESSIONAL transportation facility improvement projects. The scope of work includes the review of
<br /> REGISTRATION all contract plan components (Roadway, Signing and Pavement Markings, Signalization,
<br /> Registered Professional Lighting and Landscape) as well as the review of all pertinent contract documents (typical (®
<br /> Engineer,FL#44016 sections approvals, RRR reports, safety reports, drainage reports, pavement design reports,
<br /> environmental reports, computation books, permit documentation, utility coordination,
<br /> PROFESSIONAL etc.). Additionally provide design services for support of FDOT in-house design projects.
<br /> CERTIFICATIONS 11
<br /> Advanced Work Zone EL RIO CANAL SHARED USE PATHWAY- LWDD L-40 CANAL TO CONGRESS
<br /> Traffic Control AVENUE, F DOT LAP, F PI D:423812-1-58-01, BOCA RATON, FL: Project Manager
<br /> and Engineer of Record. Project scope included the design of a 12 foot wide concrete shared
<br /> use pathway and coordination of permitting efforts to allow for construction the pathway
<br /> within the boundaries of the Yamato Scrub Oak Preserve, a Section 4f property. Included in
<br /> the project was the coordination of landscape and site amenities, and a signalized crossing
<br /> at Congress Avenue.
<br /> •
<br /> 1-95 MANAGED LANES, FPI D: 415456-1-52-01, MIAMI-DADE COUNTY, FL:
<br /> Design Engineer providing design of conceptual roadway plans, striping plans, signing plans
<br /> and construction specifications for the 1-95 Managed Lanes Project for FDOT District 6.
<br /> Scope of work included design of variable priced tolling lanes within the existing 1-95 corridor
<br /> from NW 29th Street to Golden Glades interchange in Miami-Dade County, Florida.
<br /> LAS OLAS BOULEVARD/SR-842 ENHANCEMENT PROJECT, FORT
<br /> LAUDERDALE, FL: Project Manager and Engineer of Record for the preparation
<br /> engineering design plans for the milling, resurfacing, reconstruction and widening of Las Olas
<br /> Boulevard/SR-842 from Birch Road to Ocean Boulevard/SR-AIA. This project involved
<br /> the preparation of roadway, signing and marking, signalization, lighting, and landscape plans,
<br /> drainage modifications, and utility coordination/relocation.
<br /> YAMATO ROAD, BOCA RATON, FL: Project Manager and Engineer of Record for the
<br /> preparation of engineering design plans for the milling, resurfacing, and widening of Yamato
<br /> Road from Jog Road to the Military Trail. This project involved the preparation of roadway
<br /> plans, signing and marking plans, signalization plans, and drainage analysis and permitting, and
<br /> utility coordination/relocation.
<br /> ATLANTIC BOULEVARD/SR-8 14 SAFETY PROJ ECT(CPTED)(LAP), BROWARD
<br /> COUNTY, FL: Prepared engineering design plans for milling, resurfacing, widening, and
<br /> incorporation of safety and esthetic enhancements to the Atlantic Boulevard/SR-814 from
<br /> East 19th Avenue to East 23rd Avenue and Federal Highway (SR-5/US-I) from SE 2nd
<br /> Street to NE 2nd Street in the City of Pompano Beach, Florida. This project involved
<br /> the preparation of roadway plans, signing and pavement marking plans, signalization plans,
<br /> lighting plans and landscape plans
<br /> FLORIDAS
<br /> K e
<br /> �iquxr`FIRM PAGE 28 RFQ 2-04-02
<br />
|