Laserfiche WebLink
• <br /> • <br /> MATT NEDDEFF, PE. <br /> -E Mr. Neddeff is a professional engineer experienced in the production of roadway design. He <br />• —' has provided roadway design services for various FDOT and municipal projects.Mr.Neddeffs <br /> • `% involvement in roadway design is as follows:flexible pavement design, development of typical <br /> • f - = e'-. -, `- section packages, design of horizontal and vertical geometry, signing and pavement marking <br /> • design, signalization design, utility coordination, work zone traffic control, computation of <br /> ..,,71,,-.. - quantities, specification development and assisted in drainage design. He has developed <br /> • : ti expertise in the use of AASHTO, FDOT and municipality design standards. He has also <br /> ® ..r 4 prepared Geotechnical Reports. Mr. Neddeff is proficient with Microstation/Geopak and <br /> ACADEMIC other software that aids in the efficient design and production of roadway plans. <br />• BACKGROUND RELEVANT EXPERIENCE <br /> • B.S.,Civil Engineering, <br /> • University of Florida, 2005 UNIVERSITY OF MIAMI. CORAL GABLES, FL: Assisted the Project Manager with the <br />® PROFESSIONAL design preparation of construction documents for an internal circulation roadway throughout <br /> REGISTRATION the University of Miami campus. Designed plans for external project at University of Miami <br /> • including the addition of a left turn lane on Red Road at the Albenga intersection, lengthening <br /> Registered Professional of turn lanes at Stanford Drive and Alhambra Circle. <br /> • Engineer,FL#71611 <br />• DISTRICTWIDE UTILITY COORDINATION. BROWARD COUNTY, FL: Utility <br /> PROFESSIONAL Coordinator responsible for assisting the Senior Utility Coordinator with the management <br /> • CERTIFICATIONS of the contract. Responsibilities include the identification of existing and proposed utility <br /> • Specification Certified facilities,determination of eligibility of compensable interests, resolution of conflicts between <br /> utility facilities and proposed construction. Also responsible for securing executed legal <br /> • agreements (Utility Work Change Orders,JPAs, MOAs etc). <br /> • DOLPHIN STADIUM, MIAMI-DADE COUNTY. FL: Created plans necessary to <br /> • re-permit parking along the Snake Creek Canal. Lead Designer responsible with creating <br /> • post-game stadium exit concepts, which included; closing down north bound (NB) Turnpike <br /> at Golden Glades Interchange and re-routing traffic to north bound (NB) 1-95 by use of <br /> • MOT standards and DMS signs CO alert drivers along all roadways leading to NB turnpike. <br /> Developed plans to install new guide signs for the stadium along Florida's Turnpike and <br /> • 1-95. Worked with the Miami Dolphins in developing a MOT plan for the Dolphin Cycling <br /> • Challenge which was an extensive MOT plans that took place on many major roads of the <br /> Miami-Dade, Broward and Palm Beach area. <br /> ® 1-95 RIGID PAVEMENT REHABILITATION STUDIES. FPI D: 429300-1-32-01, <br /> • FPI D 429301-1-32-01, MIAMI-DA D E COUNTY. FL: Assisted Project Manager with <br /> • the preparation of two (2) separate PD&E reports which address the pavement deficiencies <br /> • on SR-9A/l-95 from NW 79th Street (MP 7.294) to NW 103rd Street (MP 8.823) and from <br /> the Biscayne Canal (MP 12.091) to north of the Golden Glades Interchange (MP 13.368). <br />• The three main purposes of the study were to identify the existing pavement and safety <br /> deficiencies along the corridor, evaluate the causes of pavement distress and generate repair <br />• solutions and alternates, and provide costs for each alternate so that the FDOT can choose <br /> • the best and most cost effective alternate for further development. <br /> • ANDREWS AVENUE EXTENSION (SEGMENT 5). FPID: 230724-1-52-01, <br /> • BROWARD COUNTY, FL: Assisted Project Manager tasked with the development of <br /> complete construction plans and specifications. Andrews Avenue is being reconstructed as <br /> • a divided 4-lane urban typical section, and requires significant right of way acquisition. The <br /> ® project is being constructed between SW 3rd Street and Atlantic Boulevard. The project <br /> includes upgrading the signalized intersection at SW 3rd Street, ADA ramp improvements, <br /> • sidewalk construction, drainage improvements, signing and pavement marking, utility <br /> ® coordination, permitting and landscaping. <br /> • SR-826 INTERCHANGE AT NW 122ND STREET, MIAMI-DADE COUNTY. FL: <br /> Provided complete utility coordination services including the development of the final Utility <br /> 0 Certification Package. iiiiesve.„KEITH and _ <br /> Wir RFQI2-04-02 PAGE 28A 1 <br />