My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Civil
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Civil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:53:19 PM
Creation date
2/5/2016 11:05:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICivil/Environmental Engineering 12-3 <br /> I Stormwater Work Program ATIC N S <br /> Development for Stormwater <br /> I Improvements <br /> Miami, Florida '✓ <br /> 1 _ • • <br /> ,,\.::: 1 A.- tlf 1 . y.l.,•- ♦ S, l y- <br /> A,- 1Y�/Vi v`• � V.�\ y_- Sf_14:. <br /> InTaerv� 1L - . Y.1 '�• r~� 11"� .F ,r �, S.. „ �j'. • . . <br /> 1 <br /> N. ! i •t. - � - <br /> I A . <br /> Stntturt:lOQ] • � .y ft . : Client <br /> Q y' t�`� , moY: /• : f. r "' - .- City of Miami <br /> • 4ik : <br /> Q _ I.••• h r � Completion date <br /> Ail.... �:''r — `�: 1' ,» .;'� 2011 <br /> Atkins assisted in the development of a Once the data was compiled, it was loaded Services provided <br /> stormwater work program to address more into the geodatabase where engineers •Stormwater management <br /> than 100 stormwater structures that were could quickly review the field inspection •Cost estimating <br /> I not in compliance with local regulatory crite- data, photographs,and city GIS data in a .GIS <br /> ha.Atkins evaluated 135 auger-hole struc- custom Microsoft Access application and <br /> tures that were installed in multiple locations make engineering recommendations on <br /> by the City of Miami and developed a work each structure.When the recommendations <br /> I program that addresses the improvements were complete,the application generated a <br /> needed at each structure in order to comply standardized report. <br /> with regulatory agencies. <br /> Elements of the work included using exist- <br /> In order to cut costs and improve the ing data provided by the city,visiting the site <br /> productivity of field inspection crews and of each structure,developing alternatives <br /> engineers providing recommendations, that are permittable with the Florida Depart- <br /> Atkins'civil engineers and applied technolo- ment of Environmental Protection Under- <br /> I gies professionals developed a GIS-based ground Injection Control Program and Miami <br /> field inspection application,geodatabase, Dade County Department of Environmental <br /> and automated report generation tool. Resources Management, preparing prelimi- <br /> Atkins developed an ESRI geodatabase and nary construction documents and specifica- <br /> I <br /> ArcPad application on a handheld Trimble <br /> computer so inspectors could navigate to tions, and compiling a thorough report that <br /> would be used as a design criteria package <br /> the stormwater structures,conduct detailed for a design-build request for proposals. <br /> structure assessments,and collect photos. <br /> I <br /> I <br /> IPlan Design Enable <br /> I0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.