My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Civil
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Civil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:53:19 PM
Creation date
2/5/2016 11:05:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICivil/Environmental Engineering I 2-6 <br /> I City of Miami Springs General AT�{p S <br /> Engineering Consultant Service <br /> 1 Miami Springs, Florida _ f , _�..ti5he;7?.� <br /> Iirygt:.ba'A-'-'' <br /> �, 7 ir f ..� '�T , • Sewer system operation and er` 42. ;d�^� <br /> atm``!` maintenance(O&M)manual. Prepared ` <br /> . -—a✓'� the O&M manual as part of the DERM ? i r ,1 ti <br /> I� I t, Y.i t,. ▪-a• 1. <br /> Y and federal consent decree. f tit- <br /> - " nnit� , E nnrrtt ' r.. , <br /> � .�4 ,r,, fir a;' • Sewage pumping station manifolding <br /> 1 , rrr !r9� study.An evaluation was made of the w, <br /> 1j _ existing City sewage pump stations, V' p +'- <br /> ers which formed a repump system.With wt Ci. <br /> �+" computer modeling, a manifolded a <br /> c=_�c. 4. ' .r ' `�";; s- - system was devised to upgrade the me , � <br /> .a.-*------- system at a savings. 1 . ..t 1 . ` <br /> 't�4' .. <br /> Atkins has served as general engineering • Pump station study.As part of P‘-'--1-• 1;;, <br /> e consultant to the City of Miami Springs since DERM and federal consent decree x^'' <br /> 1970. In this capacity,Atkins has provided requirements, a study report was ts±: <br /> .' <br /> a multitude of expertise for ongoing Bevel- prepared for the existing wastewater k:c -<<'a.t - ` •- - VI <br /> opment and improvements within the city pump stations. <br /> 1 including the following tasks:• Client <br /> • <br /> Airlift stations conversions. The City of Miami Springs <br /> Stormwater improvements to Basin 35. conversion of four older airlift sewage lift Client reference <br /> Based on a previous stormwater master stations into more efficient submersible Robert Williams <br /> I plan developed by Atkins in 2001,Atkins lift stations. 1401 Westward Drivehas served as engineer-of-record for Miami Springs,FL 33166 <br /> implementation of various projects. ▪ Architectural design for the city hall 305.348.2366 <br /> The most recent update consisted of expansion, including the provision of williamsr@miamisprings-fl.gov <br /> 1 stormwater improvements to Basin 35, construction administration services. <br /> which includes the City's golf course as Completion date <br /> well as the fragile drinking water wells ▪ Continuing services for plan review Ongoing <br /> for Miami-Dade County.The project involving site plans, landscaping plans, Project cost <br /> involved extensive coordination with the and engineering construction drawings. Various <br /> 1 County in order to ensure appropriate . Landscape architectural services for Services provided <br /> design under South Florida Water lineal park development along the Miami • Civil engineering <br /> Management District's strict policies in River. <br /> the area.Additionally,Atkins conducted • Stormwater improvements <br /> all site plan reviews on behalf of theand master planning <br /> • Lead/copper water testing and analysis. <br /> City. In this capacity,Atkins verified • Landscape architecture <br /> compliance with City codes and • Contamination assessment plan(CAP). <br /> regulatory criteria. Architectural design <br /> • Plan cleanup of public works complex. • Plan review services <br /> Construction management services <br /> for Catch Basin 14 that consisted of • Stormwater management master plan. <br /> stormwater management improvements. Conducted an areawide evaluation <br /> B • of drainage basins within the city and <br /> Sewer system evaluation study(SSES). prepared a stormwater management <br /> Study of infiltration into the existing master plan.Some drainage basins <br /> sewer system as a part of Miami-Dade were selected for stormwater <br /> 1 County DERM and federal consentmprovement design final construction <br /> decrees. Some of the old gravity sewer plans. <br /> pipes were relined to reduce infiltration <br /> as a part of the study. • Plan reviews. Served as an extension <br /> of the City's Public Works Department <br /> Ground control survey services for aerial by reviewing plans submitted by other <br /> photogrammetry for the entire city. developers for compliance with City <br /> standards. <br /> IPlan Design Enable <br /> 1 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.