Laserfiche WebLink
ICivil/Environmental Engineering 12-5 <br /> I South Pointe Park Fishing Pier &&IKDNS <br /> Miami Beach, Florida <br /> I <br /> I <br /> :1 Ia <br /> —,.,-------, 4,,,e, <br /> . $ r� t DM J-� <br /> i <br /> k7'4' <br /> r _ 4...44. t_ . p . \ . 41-/' <br /> -1e tr:%A. 41,IL._ MIL <br /> 1 r' , `��^� L. = • <br /> i ,'`' • . - <br /> -../kr,-• . . -"rt." , , , <br /> it "+' a ., Client <br /> I ' — � • d p.- City of Miami Beach <br /> t -�— _ jIii ' ,,,Y:.} r,. Completion date <br /> - _ -• j, 2012 <br /> J <br /> • <br /> ,-�� ^t Services provided <br /> T i , Y <br /> S__,:. <br /> y -- _ - , \ • Design and construction <br /> administration <br /> • Landscape architecture <br /> 1 Atkins is developing a new design and during construction activities. Because of the design <br /> providing construction administration ser- physical location,Atkins must also properly • permitting <br /> vices for the South Pointe Park Pier.This engineer the project to anticipate limited, <br /> project consists of demolition of the exist- water-based construction access. • Structural engineering <br /> I ing+10,000-square-foot fishing pier and • Architecture <br /> installation of a new pier supported by more The project site has multilayered jurisdic- <br /> than 60 reinforced concrete piles with the tional land and water rights between the city, <br /> footprint of the non-serviceable pier.The state, and federal government.All land and <br /> existing pier is in poor structural condition water rights will require updates and will be <br /> I and is currently closed to the public.The secured prior to construction.The project is <br /> pier's superstructure will be replaced within further affected by complex environmental <br /> a similar footprint,while also improving the conditions, including threatened species pro- <br /> aesthetic appearance and user experience lection.Atkins is overseeing the permitting <br /> I in a manner that is complementary to the efforts with multiple agencies, and all permits <br /> current South Pointe Park identity.Construc- will be secured and the conditions monitored <br /> tion is anticipated to start in the fall of 2012. to successfully complete the project with <br /> minimal environmental impact. <br /> I In addition to being an over-the-water struc- <br /> ture,the project has several unique design A true demonstration of Atkins'in-house <br /> constraints.The project sits within a highly expertise, our structural engineers, land- <br /> visible, narrow navigation channel used for scape architects, and architects based out <br /> I <br /> intemational shipping lines and cruise ships. of the Fort Lauderdale and Miami offices <br /> All coastal maritime and navigation require- coordinated the design. <br /> ments will need to be satisfied before and <br /> I <br /> 1 Plan Design Enable <br /> 1 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />