|
1 Civil/Environmental Engineering I 3-15
<br /> I
<br /> I
<br /> I Education JeremyBourdon PE
<br /> B.S., Civil Engineering, i
<br /> Michigan State University Roadway Design
<br /> IRegistrations/Licenses
<br /> Professional Engineer: Jeremy Bourdon has 14 years of transportation experience, and is responsible for the
<br /> Florida 59933, 2003 preparation of plans, schedules, cost and manhour estimates, and job budgets; performance
<br /> I Michigan 6201049133, 2002 of preliminary engineering design and reviews; oversight of final plans and reports for client
<br /> approval; and coordination of work with other engineers and professionals.
<br /> Certifications
<br /> Specification Package Mr. Bourdon's Atkins project experience includes:
<br /> 1 Preparation (FDOT Certified) Coconut Creek Educational Corridor, Broward County, FL. Project manager for this 3R
<br /> Advanced Maintenance of project which includes major pedestrian enhancements.
<br /> Traffic(FDOT Certified) FDOT District Seven, 118th Avenue (CR 296), Pinellas County, FL. Mr. Bourdon
<br /> IPresentations serves as assistant project manager and lead roadway engineer. This project includes major
<br /> "MDOT Highway Material reconstruction and the addition of elevated express lanes and frontage roads.
<br /> Testing Program," American Cargo Road Extension, Hillsborough County, FL.Assistant project manager and lead
<br /> I Society for Quality, January roadway engineer for this design build project. This new 4-lane, divided alignment had multiple
<br /> 2003 existing and proposed utilities that required extensive coordination.
<br /> Professional Affiliations Spencer Avenue Extension, Sarasota County, FL. Project manager for this new rural
<br /> I American Society of Civil alignment. Oversees the project's day-to-day operations including oversight of technical issues,
<br /> Engineers(ASCE) plans production, adherence to schedule, quality control compliance, client coordination, and all
<br /> other contractual obligations.
<br /> I Honore Avenue/Pinebrook Extension, Sarasota County, FL. The Honore Avenue/
<br /> Pinebrook Road extension consists of a new four-lane divided roadway alignment from Laurel
<br /> Road to SR 681 in Sarasota County. In conjunction with this project, 1-75 will be relocated
<br /> toward the median, and a portion of 1-75 will be converted into a local road. Noteworthy
<br /> I project elements include significant public involvement, coordination with the Florida
<br /> Department of Transportation (FOOT), environmental sensitivity, and construction of a new
<br /> alignment for a majority of the project.
<br /> I Florida's Turnpike Enterprise, FL. Responsible for the review of consultant specifications
<br /> packages and technical special provisions.
<br /> FDOT District One, SR 70, Manatee County, FL. Project engineer and assistant project
<br /> I manager from 2003 to 2007. Responsibilities included consultant coordination, roadway design,
<br /> traffic control design, plans production, estimating, specifications, and significant post-design
<br /> services.
<br /> FDOT District Seven, US 41 (SR 45) North, Citrus County, FL. Developed traffic control
<br /> Iplans (TCP)for this project, which extends from Watson Street to SR 44.
<br /> FDOT District Seven, 1-275, Segment 2A, Hillsborough County, FL. Mr. Bourdon served as
<br /> roadway engineer for stage three of this project, which involved creating designs for the interim
<br /> 1 and ultimate configuration of 1-275 in Tampa. Coordinated the efforts of 17 consultants on
<br /> stage two of the project.
<br /> FDOT District Seven, US 41 (SR 45) South, Citrus County, FL. Oversaw roadway design
<br /> I for this project, which starts at SR 44 and ends at SR 200. Served as assistant project manager,
<br /> overseeing all technical project issues and plans production.
<br /> I
<br /> I0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02
<br />
|