<br /> M.B.A., Business Ricardo Castro has seven years of engineering experience involving preparation of construction
<br /> Administration, University of and cost estimates; presentation of alternative engineering solutions, as well as budget and
<br /> I Tampa schedule updates to clients; preparation of material for reports and permit applications; and
<br /> Registrations/Licenses preparation of plans and specifications. His current responsibilities at Atkins include roadway
<br /> Professional Engineer and interstate design; preparation of plans, calculations, and revision of the various items
<br /> Florida 68294, 2008 included in the computation book.
<br /> Mr. Castro's Atkins project experience includes:
<br /> Honors and Awards
<br /> Beta Gamma Sigma. Florida Department of Transportation (FDOT) District Four, Local Agency Program
<br /> Selected for membership Coordinator. Mr. Castro assists the District Program Management office coordinating all LAP
<br /> n the honor's society for projects in Palm Beach County. Responsibilities include review of all submittals throughout the
<br /> collegiate schools of business, design process until a final PS&E package is approved, and also provides oversight during the
<br /> accredited by the American letting and construction phases in various activities such as review of bid tabulations, change
<br /> I Assembly of Collegiate orders, etc.
<br /> Schools of Business(AACSB) City of Miami, Design Project Manager, Miami, FL. Under Atkins' program management
<br /> contract with the City of Miami, Mr. Castro was responsible for all scoping, contractual
<br /> I management, review/approval of design decisions, coordination of utilities, permitting liaison
<br /> activities, constructability reviews, and public information efforts for various roadway projects.
<br /> These projects required coordination with various departments and districts, Miami-Dade
<br /> County, and various elected officials.
<br /> ICargo Road Extension (Design-Build). Lead technical person of project for the Hillsborough
<br /> County Aviation Authority involving design of 1.4 miles of a new four-lane urban arterial.
<br /> Responsibilities included pavement design, horizontal and vertical geometry, sidestreet
<br /> I intersections, traffic control plans, and coordination of utility design including water and sewer
<br /> lines.
<br /> 2007 Work Program Update Cycle with FDOT District Seven. Responsible for managing
<br /> I over 100 project construction cost estimate updates. Responsibilities included field reviews and
<br /> coordination of estimates across various disciplines.
<br /> SR 45 (Nebraska Avenue) from Kennedy Boulevard to Hillsborough Avenue,
<br /> I Hillsborough County, FL. Under Atkins' general engineering consultant contract with FDOT
<br /> District Seven, Mr. Castro served as roadway design engineer for this complex Resurfacing,
<br /> Restoration, and Rehabilitation (RRR)in-house project. Project included sections of pavement
<br /> reconstruction; storm sewer system improvement; reconstruction of curb, gutter, and sidewalk;
<br /> I reconfiguration of four-lane undivided roadway to two-lane divided with both raised median
<br /> and bidirectional left turn lane. Project included extensive public involvement and modification
<br /> to existing driveways.
<br /> I SR 93 (1-75)at Corkscrew Road Interchange, Lee County, FL. Transportation engineer for
<br /> this project for FDOT District Seven, involving the design of 1.9 miles of 1-75 and single-point
<br /> urban interchange (SPUI)at Corkscrew Road. Responsibilities include plans preparation as well
<br /> as assisting in the geometric design, calculation of ramp terminal details, and preparation of
<br /> I pavement type selection report.
<br /> SR 93 (1-75) Hillsborough/Pasco County Line to Cypress Creek Bridge, Pasco County,
<br /> FL. Transportation engineer for this project for FDOT District Seven involving the design of
<br /> I 1.2 miles of 1-275 with intersecting area streets. Responsibilities include plans preparation,
<br /> geometric design, and computation book preparation.
<br /> 1 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02
<br />
|