My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Civil
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Civil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:53:19 PM
Creation date
2/5/2016 11:05:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICivil/Environmental Engineering I 4-1 <br /> 4. Approach/methodology <br /> II <br /> IProject approach <br /> Communication and coordination. Our proposed team <br /> The key components of successfully operating a general works together daily. Our professionals know when to <br /> I engineering contract include: collaborate with one another in order to address a problem <br /> • Providing a detail-oriented project manager. in a timely manner and maximize the use of our technical <br /> resources. <br /> I • Assigning appropriate support staff. <br /> Monitoring of services provided.As project manager, <br /> • Promoting communication and coordination. Mr. Herrera will be responsible for making sure that services <br /> • Monitoring the services provided. provided are accurate and meet the City's needs. He will <br /> 1monitor all projects from beginning to end and maintain <br /> • Performing quality assurance and quality control (QA/QC). contact with the entire team,which includes the City and <br /> • Coordinating with permitting agencies and the public. Atkins' professionals. Our proposed QA/QC manager, John <br /> Wilt, PE,will also be available at a moment's notice. The <br /> I Atkins project team is locally staffed and well qualified <br /> Detail-oriented project manager. Mr. Herrera was asked to provide all required services outlined in the request for <br /> to serve as project manager on a $4.5 million project with qualifications. <br /> the City of Miami <br /> I Beach. The grant QA/QC. Atkins is a strong WAKE c0 <br /> schedule required A true testament of the in- believer that quality service �� sgFc <br /> house capabilities of Atkins, can only be provided to <br /> that design of the z <br /> new fishing pier services have included our clients if we have QC W <br /> at South Pointe structural, mechanical, and measures in place for all t coMv�EtE <br /> Park be completed electrical engineering; civil deliverables. To ensure �4 4 V \ <br /> in less than 120 engineering; architecture this important step, Atkins '7, a t V <br /> I days. Mr. Herrera design; landscape develops a QA/QC plan os�b�_dt of <br /> was responsible tailored for each assignment. s o� <br /> for coordinating architecture; and cost l j Q—VEP\FV CP' <br /> g estimating, and will include The major objectives of <br /> with multiple construction administration our QA/QC plan are to <br /> I disciplines and provide senior-level technical <br /> various regulatory later this year. guidance throughout the project, eliminate redundant work <br /> agencies including and miscommunicated efforts, and ensure consistency and <br /> FDEP Bureau of Beaches and Coastal Systems, FDEP accuracy of deliverables meeting the scope of work. <br /> I Submerged Lands and Environmental Resources Program, At each milestone and/or project deliverable point, the work <br /> U.S. Army Corps of Engineers (USAGE), and Florida Fish and produced undergoes a standard, five-step QC review process <br /> Wildlife Conservation Commission (FWC), as well as local city prior to completion and/or release. The work product and <br /> I and county agencies. His responsiveness and attentiveness supporting documentation are gathered and delivered to the <br /> throughout the contract have been recognized by the City as QC reviewer from the developing lead technical professional <br /> being key to the success of this project, as demonstrated by (LTP). The QC reviewer completes a review by indicating <br /> the survey letter included in Section 7. This project has been a both items verified and those that may require correction <br /> I great achievement for Atkins, and its success is primarily due or further clarification. Upon completion of the review, the <br /> to the firm's selection of key team members and their ability to QC reviewer returns documents to the LIP. The LTP reviews <br /> work together toward a common goal. the QC comments with the design and management team, <br /> I Assignment of appropriate support staff. The success of and indicates concurrence by a red checkmark. If there is a <br /> any project is determined by the members of the team. To be difference of opinion, resolution is reached through the use <br /> successful, the City and Atkins must work as a collaborative of another qualified technical resource. The agreed-upon <br /> team. Our project managers select each team member based adjustments are made to the document by the design team, <br /> I on past projects, technical expertise, and working relationships and a clean revised document is sent back to the QC reviewer. <br /> with peers. Atkins' success in south Florida is a direct The QC reviewer checks the revised document and verifies <br /> result of our ability to assign appropriate staff to with a green checkmark that the appropriate changes were <br /> Iaddress each of our client's specialized needs. made. <br /> 1 0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.