Laserfiche WebLink
ICivil/Environmental Engineering j 4-2 <br /> I <br /> I <br /> 1 The final step is QA, performed by the designated QA/QC • Include the cost consultant/contractor early on to establish <br /> manager, verifying that the five-step process was appropriately and confirm budgets. <br /> performed, and authorizing the release of the work product. Establish and adhere to project milestones. <br /> I Coordination with permitting entities and the • Provide adequate time for review and design response to <br /> public.Atkins' staff has extensive permitting experience • <br /> with numerous municipal projects throughout the state review. <br /> I including land management, transportation, stormwater <br /> management, and utility improvements. Our team is Our team will work with the City to identify a detailed <br /> schedule. Once the scope and tasks are approved by <br /> intimately familiar with federal, state, and local permitting the owner, a comprehensive scheduling work session <br /> regulations and requirements for the various agencies that will be conducted to provide all participants with a clear <br /> I may have jurisdiction over the assignments issued under understanding of schedule requirements, responsibilities, and <br /> this services contract. We have strong relationships and a interface commitments. The schedule will be developed and <br /> successful permitting track record with many such agencies analyzed to identify all participants in the planning process, <br /> I including FDEP, Broward County, FWC, Florida Department define anticipated activities, verify established target dates and <br /> of Transportation(FDOT), South Florida Water Management milestones, and establish and coordinate activity timeliness <br /> District(SFWMD), USACE, and U.S. Fish and Wildlife Service and interface requirements. <br /> (USFWS). Job progress and schedules are fixed agenda items for all <br /> 1 Our team's experience is unmatched in handling the progress meetings. During these meetings, the progress of <br /> community participation and public involvement portion of each discipline will be discussed to facilitate coordination, <br /> projects from the early stages of planning through design eliminate obstacles, and determine additional resources that <br /> 1 and construction. Atkins offers full-service support inhouse may be required. When appropriate, techniques such as look- <br /> to generate and reproduce all types of graphics, exhibits, ahead schedules for the coming week's activities, summaries <br /> presentations, newsletters, video-simulation, modeling, of action items and assignments, and recovery schedules may <br /> before-and-after photos,website creation and maintenance, be developed to meet schedule requirements. Ultimately, it is <br /> I news releases, advertisements, and press kits. Our technical <br /> management and construction professionals are well-versed the project manager's responsibility to maintain the schedule <br /> and keep the client informed on project progress. <br /> in responding to questions from community members Atkins believes in a proactive design approach. This <br /> and making sure that the entire community is involved in means the City of Sunny Isles Beach will be vital <br /> I developing the potential range of solutions to be studied for members of the development team. Your input is <br /> the duration of the project. We can successfully handle these imperative for a successful project. Maintaining the schedule <br /> efforts to the degree desired by the City of Sunny Isles Beach. <br /> is a team effort; it is not solely driven by the consultant. <br /> I Scheduling methodology Decisions, input, and milestone reviews will be handled in a <br /> Atkins understands the importance of maintaining the project timely manner. Working together, we can maintain even the <br /> schedule on all assignments that may be given through most aggressive schedule. For example, the South Pointe Park <br /> I this contract. Our firm's successful history is integrally tied Fishing Pier project required a turnaround on 100-percent <br /> to meeting schedules. Our staff will work with the project design documents within 120 days of issuance of the notice to <br /> controls group to assist in developing a cost estimate as well proceed (NTP). A true testament of the in-house capabilities <br /> as project schedule for the design and implementation of of Atkins, services have included structural, mechanical, and <br /> I all assignments. The project controls group has maintained electrical engineering; civil engineering; architecture design; <br /> successful results when engaged by our clients by performing landscape architecture; and cost estimating, and will include <br /> the following steps: construction administration later this year. <br /> I • Begin with a clearly defined program and problem <br /> statement. <br /> • Involve decision makers. <br /> I • Schedule weekly meetings with clearly defined agendas <br /> and action items. <br /> I <br /> I0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />