My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Architectural
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Architectural
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:51:12 PM
Creation date
2/5/2016 1:51:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architecture I 4-3 <br /> 1 <br /> 1 <br /> Coordination with permitting entities and the <br /> public. Atkins' staff has extensive permitting experience <br /> with numerous municipal projects throughout the state <br /> including land management, transportation, stormwater <br /> management, and utility improvements. Our team is <br /> intimately familiar with federal, state, and local permitting <br /> regulations and requirements for the various agencies that <br /> may have jurisdiction over the assignments issued under <br /> this services contract. We have strong relationships and a <br /> successful permitting track record with many such agencies <br /> including FDEP, Miami-Dade County, Florida Department of <br /> Transportation(FDOT), South Florida Water Management <br /> District (SFWMD), and USACE. <br /> Our team's experience is unmatched in handling the <br /> community participation and public involvement portion of <br /> projects from the early stages of planning through design <br /> and construction. Atkins offers full-service support inhouse <br /> to generate and reproduce all types of graphics, exhibits, <br /> presentations, newsletters, video-simulation, modeling, <br /> before-and-after photos,website creation and maintenance, <br /> news releases, advertisements, and press kits. Our technical <br /> management and construction professionals are well-versed <br /> in responding to questions from community members <br /> and making sure that the entire community is involved in <br /> 1 developing the potential range of solutions to be studied for <br /> the duration of the project. We can successfully handle these <br /> efforts to the degree desired by the City of Sunny Isles Beach. <br /> Scheduling methodology <br /> Atkins understands the importance of maintaining the project <br /> schedule on all assignments that may be given through <br /> this contract. Our firm's successful history is integrally tied <br /> to meeting schedules. Our staff will work with the project <br /> controls group to assist in developing a cost estimate as well <br /> as project schedule for the design and implementation of <br /> all assignments. The project controls group has maintained <br /> successful results when engaged by our clients separately, or in <br /> support of our in-house architects and engineers. <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> 0006.027944.0512 Atkins I City of Sunny Isles Beach, RR)No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.