My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Architectural
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Architectural
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:51:12 PM
Creation date
2/5/2016 1:51:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IArchitecture 14-2 <br /> I <br /> I <br /> QA/QC. Atkins is a strong SAKE C • Begin with a clearly defined program and problem <br /> believer that quality service /o oa,,, ' statement. <br /> can only be provided to o • Involve decision makers. <br /> I our clients if we have QC W �2. <br /> measures in place for all \� • Schedule weekly meetings with clearly defined agendas <br /> deliverables. To ensure CO\MPLE[E <br /> V and action items. Include the cost consultant/contractor <br /> this important step, Atkins 3 p early on to establish and confirm budgets. <br /> I develops a QA/QC plan jos Z W Establish and adhere to project milestones. <br /> tailored for each assignment. abs �Q� `cot p j <br /> The major objectives of p--VEP\FV c.OQQ4 • Provide adequate time for review and design response to <br /> I our QA/QC plan are to review. <br /> provide senior-level technical <br /> guidance throughout the project, eliminate redundant work Our team will work with the City to identify a detailed <br /> and miscommunicated efforts, and ensure consistency and schedule. Once the scope and tasks are approved by <br /> accuracy of deliverables meeting the scope of work. the owner, a comprehensive scheduling work session <br /> will be conducted to provide all participants with a clear <br /> At each milestone and/or project deliverable point, the work understanding of schedule requirements, responsibilities, and <br /> produced undergoes a standard, five-step QC review process interface commitments. The schedule will be developed and <br /> I prior to completion and/or release. The work product and <br /> supporting documentation are gathered and delivered to the analyzed to identify all participants in the planning process, <br /> define anticipated activities, verify established target dates and <br /> QC reviewer from the developing lead technical professional milestones, and establish and coordinate activity timeliness <br /> (LTP). The QC reviewer completes a review by indicating both and interface requirements. <br /> I items verified and those that may require correction or further <br /> clarification. Job progress and schedules are fixed agenda items for all <br /> progress meetings. During these meetings, the progress of <br /> QC reviewer returns documents to the LTP. The LTP reviews each discipline will be discussed to facilitate coordination, <br /> I the QC comments with the design and management team, eliminate obstacles, and determine additional resources that <br /> and indicates concurrence by a red checkmark. If there is a may be required. When appropriate, techniques such as look- <br /> difference of opinion, resolution is reached through the use ahead schedules for the coming week's activities, summaries <br /> of another qualified technical resource. The agreed-upon of action items and assignments, and recovery schedules may <br /> I adjustments are made to the document by the design team, be developed to meet schedule requirements. Ultimately, it is <br /> and a clean revised document is sent back to the QC reviewer. the project manager's responsibility to maintain the schedule <br /> The QC reviewer checks the revised document and verifies and keep the client informed on project progress. <br /> I with a green checkmark that the appropriate changes were <br /> made. Atkins believes in a proactive design approach. This <br /> means the City of Sunny Isles Beach will be vital <br /> The final step is QA, performed by the designated QA/QC members of the development team.Your input is <br /> manager, verifying that the five-step process was appropriately imperative for a successful project. Maintaining the schedule <br /> Iperformed, and authorizing the release of the work product. is a team effort; it is not solely driven by the consultant. <br /> Atkins understands the importance of maintaining the project Decisions, input, and milestone reviews will be handled in a <br /> schedule on all assignments that may be given through timely manner. Working together, we can maintain even the <br /> I this contract. Our firm's successful history is integrally tied most aggressive schedule. For example, Atkins' South Pointe <br /> to meeting schedules. Our staff will work with the project Park Fishing Pier project required a turnaround on 100-percent <br /> controls group to assist in developing a cost estimate as well design documents within 120 days of issuance of the notice to <br /> I as project schedule for the design and implementation of proceed (NTP). A true testament of the in-house capabilities <br /> all assignments. The project controls group has maintained of Atkins, services have included structural, mechanical, and <br /> successful results when engaged by our clients by performing electrical engineering; civil engineering; architecture design; <br /> the following steps: landscape architecture; and cost estimating, and will include <br /> 1 construction administration later this year. <br /> I <br /> I0006.027944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.