My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Atkins - Architectural
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Atkins
>
Atkins - Architectural
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:51:12 PM
Creation date
2/5/2016 1:51:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IArchitecture 14-1 <br /> 4. Approach/methodology <br /> I1 <br /> IProject Approach through transit components including parking garages, from <br /> benches and shelters to full-blown intermodal facilities. Mr <br /> The key components of successfully operating a general Wingo specializes in mixed use structures, especially involving <br /> I engineering contract include: garage functions. As to Community Center design, Mr. Levis' <br /> Providing an experienced project manager. work for the Village of Pinecrest and the Miami Dade Public <br /> • Library System, in the same project, speaks for itself. He <br /> I • Mastering civic architecture created a complex that embodies the spirit of the Village, its <br /> Assigning appropriate support sta . architectural language, and through its site planning with <br /> • ffthe library, was able to create civic space that has become <br /> • Promoting communication and coordination. the focal point for communal life in Pinecrest. He relishes the <br /> I • Monitoring the services provided. opportunity to do the same for Sunny Isles Beach. <br /> Assignment of appropriate support staff. The success of <br /> • Performing quality assurance and quality control (QA/QC). any project is determined by the members of the team. To be <br /> I . <br /> Coordinating with permitting agencies and the public successful, the City and Atkins must work as a collaborative <br /> team. Our project managers select each team member based <br /> Experienced project manager. Mr. Levis has managed on past projects, technical expertise, and working relationships <br /> complex projects, including their public involvement with peers. After reviewing the type of assignments the City is <br /> 1 components, on four likely to need, Mr. Levis has identified key staff members who <br /> continents. With typical will be able to excel. Atkins' success in south Florida is a <br /> project values in the $40 A true testament of the direct result of our ability to assign appropriate staff to <br /> to $60 million range, in-house capabilities of address each of our client's specialized needs. <br /> 1 and all involving multiple Atkins, services have <br /> disciplines and specialty <br /> included structural, With a very limited staff, the Division of Engineering <br /> and Architectural Services alone provides overall project <br /> consultants, Mr. Levis mechanical, and management for the construction of approximately 200 <br /> has proved successfulI 9 PP Y <br /> n delivering complex electrical engineering; designated engineering and architectural projects and <br /> assignments on-time civil engineering; tasks annually. The Atkins team will provide the City with <br /> and on-budget. The architecture design; its extensive resources and expertise on an as-needed basis <br /> I complexities of a general landscape architecture; within a wide range of disciplines. This flexibility allows Atkins <br /> contract are different, and cost estimating. to provide assistance during emergency conditions, or simply <br /> but equally challenging. when a signature project is absorbing your in-house experts. <br /> Instead of one large Communication and coordination. Our proposed team <br /> I project with many moving parts, there are many small works together daily. Our professionals know when to <br /> projects—each with their own challenges. The same attention collaborate with one another in order to address a problem <br /> to detail is required. in a timely manner and maximize the use of our technical <br /> I Mastering civic architecture. Mr. Levis specializes in civic resources. <br /> architecture, at its crossroads with urban design and landscape Monitoring of services provided. As project manager, Mr. <br /> architecture. He is highly qualified to help the City establish Levis will be responsible for making sure that services provided <br /> a vision, an architectural language, a sense of place, and to are accurate and meet the City's needs. He will monitor all <br /> I work with staff, urban planners, and others to produce a projects from beginning to end and maintain contact with the <br /> pattern book to create civic architecture—whether it takes the entire team, which includes the City and Atkins' professionals. <br /> form of a revitalized streetscape, public open space, a garage Our proposed QA/QC manager, Gary Wingo, AIA, serves as <br /> I building lined with retail or other program and designed to Atkins' Orlando urban design leader. Although he is a just a <br /> conceal its automotive storage function, the creation of a day's notice away from the site, his location in another office <br /> new Community Center, Library, or other civic building scaled helps him perform this QA function impartially. The Atkins <br /> appropriately for Sunny Isles Beach. Mr Wingo's experience project team is locally staffed and well qualified to provide all <br /> I in Boston, the Northeast, and throughout the United Statesequired services outlined in the request for qualifications. <br /> is similarly focused on creating civic architecture, particularly <br /> I <br /> 1 0006.022944.0512 Atkins I City of Sunny Isles Beach, RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.