|
I
<br /> I Michael Kroll, RLA
<br /> Team Leader/Principal-In-Charge
<br /> - Professional Experience: Design, Final Landscape/Hardscape
<br /> I
<br /> During his extensive career, Mr.Kroll, Design,Street Lighting Design,Irrigation
<br /> Design and Site Grading Design.
<br /> Vice President of Landscape
<br /> Architecture, Planning and Miramar Parkway Redevelopment-This
<br /> !( Environmental Services, has been redevelopment and streetscape project
<br /> actively involved in projects ranging from included a two-mile,two-block urban
<br /> Years of Experience:26 large scale habitat restoration to section of the Miramar Parkway corridor
<br /> 1 Years With the Firm:24 international urban redevelopment
<br /> projects. adjacent to SR 7/US 441. Miller Legg
<br /> designed the landscape and irrigation
<br /> Registrations&certifications: improvements for Florida Department of
<br /> 1 Registered Landscape Architect,FL,1989 Mr.Kroll's diverse professional Transportation (FOOT)along this corridor
<br /> Registered Landscape Architect,TX,2009 experience has led to projects that north and south of Miramar Parkway. In
<br /> successfully integrate environmental, addition,certified arborist services were
<br /> Education: planning and landscape architectural provided for a tree inventory and quality
<br /> 1 BachelorofLandscapeArchitecture,LandscapeArchitservices. Under his leadership, Miller
<br /> University
<br /> evaluation. The proposed streetscape
<br /> of Florida,1986 Legg develops project solutions that improvements included enhancement of
<br /> Studies Abroad,VIA'86 Landscape respond to the natural environment, the pedestrian corridor to encourage
<br />' Architecture/Architecture Studies respect the social fabric and create safe pedestrian traffic for adjacent
<br /> Vicenza,ItaN,1986
<br /> Graduate Studies,Urban and Regional Planning sustainable aesthetic spaces. commercial and office uses.The design
<br /> Florida State University,1989 also calls for consolidated parking areas
<br /> Relevant Project Experience: rather than replacing backout parking in
<br /> Publications&Presentations: front of businesses for the safety of both
<br /> American Satiety of Landscape Architects,Broward Florida Department of Transportation the pedestrian and automobile traffic
<br /> Section,Habitat Restoration,October,1995 (FOOT) District 6 Biscayne Boulevard and to improve the street operation and
<br />' Builders Association of South Florida, (NE 5th Street to NE 13th Street)-In the aesthetics of the streetscape.
<br /> Environmental Issues&Development,1999,
<br /> Lecturer order to continue the enhancements of
<br /> Florida Engineering Society,Environmental Design the US 1 Corridor for the City of Miami, Cocoa Beach Downtown Streetscape
<br /> &Habitat Restoration,April,1995,Lecturer Miller Legg developed a streetscape Comprehensive Master Plan-Miller
<br />' Florida Planning and Zoning Association,Public n to unifythe area surrounding Partnerships,lune 2007, design Che Legg was responsible for the preparation
<br /> Presenter/Speaker American Airlines Arena, Bicentennial of a comprehensive master development
<br /> University of Florida School of Architecture,Where Park and the Performing Arts Center. plan for approximately 1.5 miles of
<br />' the Water Meets the Land,September,1996, Enhancement of the pedestrian corridor existingurban streetscape improvements within
<br /> Guest Lecturer and integration with the
<br /> g Roberto the historic downtown core of Cocoa
<br /> Professional&civic Activities: Burle Marx paving design,directly to the Beach.The master plan included
<br /> south,was integral in the design of the roadway horizontal alignment,traffic
<br /> ' Member,American Society of Landscape Architects
<br /> Post Member,American Society of Landscape project. calming,low impact drainage design,
<br /> Architects,Florida Executive Committee street lighting, street furnishings and
<br /> Member,Broward County Bicycle&Pedestrian St. Maarten Tourist Corridor
<br /> Advisory Committee xeric landscape plantings. Additional
<br /> ' Beautification -For the major tourist
<br /> services include the development of
<br /> Member,Broward Section,American Planning p
<br /> Association
<br /> corridor through the Dutch side of St. construction plans for a 1-mile segment
<br /> Past Chair,Broward Section,American Society of Maarten,the Government of St. Maarten of the southbound section of Orlando
<br /> Landscape Architects developed a plan to enhance the visual Avenue,a one-way pair through a Joint
<br /> Member,Florida Earth Foundation,Engineering aesthetics of the roadwayand hired
<br /> Advisory Committee,2004-present Participation Agreement with FDOT.
<br /> Member,Florida Recreation and Park Association Miller Legg International to implement
<br /> Member,Florida Redevelopment Association the plan. The project included The Waterfront-G9-Miller Legg
<br /> ' Member,Urban Land Institute beautification of approximately two provided landscape architecture for a
<br /> miles of roadway corridor,a vehicular 725-acre urban mixed-use development
<br /> roundabout,and shoreline improvement in the Waterfront District of Dubai,
<br /> ' to the Great Salt Pond. Services United Arab Emirates.The project area
<br /> .\/"..
<br /> � provided included Conceptual Landscape includes six miles of urban streetscape,
<br /> MILLER LEGG
<br />
|