Laserfiche WebLink
I <br /> I Michael Kroll, RLA <br /> Team Leader/Principal-In-Charge <br /> - Professional Experience: Design, Final Landscape/Hardscape <br /> I <br /> During his extensive career, Mr.Kroll, Design,Street Lighting Design,Irrigation <br /> Design and Site Grading Design. <br /> Vice President of Landscape <br /> Architecture, Planning and Miramar Parkway Redevelopment-This <br /> !( Environmental Services, has been redevelopment and streetscape project <br /> actively involved in projects ranging from included a two-mile,two-block urban <br /> Years of Experience:26 large scale habitat restoration to section of the Miramar Parkway corridor <br /> 1 Years With the Firm:24 international urban redevelopment <br /> projects. adjacent to SR 7/US 441. Miller Legg <br /> designed the landscape and irrigation <br /> Registrations&certifications: improvements for Florida Department of <br /> 1 Registered Landscape Architect,FL,1989 Mr.Kroll's diverse professional Transportation (FOOT)along this corridor <br /> Registered Landscape Architect,TX,2009 experience has led to projects that north and south of Miramar Parkway. In <br /> successfully integrate environmental, addition,certified arborist services were <br /> Education: planning and landscape architectural provided for a tree inventory and quality <br /> 1 BachelorofLandscapeArchitecture,LandscapeArchitservices. Under his leadership, Miller <br /> University <br /> evaluation. The proposed streetscape <br /> of Florida,1986 Legg develops project solutions that improvements included enhancement of <br /> Studies Abroad,VIA'86 Landscape respond to the natural environment, the pedestrian corridor to encourage <br />' Architecture/Architecture Studies respect the social fabric and create safe pedestrian traffic for adjacent <br /> Vicenza,ItaN,1986 <br /> Graduate Studies,Urban and Regional Planning sustainable aesthetic spaces. commercial and office uses.The design <br /> Florida State University,1989 also calls for consolidated parking areas <br /> Relevant Project Experience: rather than replacing backout parking in <br /> Publications&Presentations: front of businesses for the safety of both <br /> American Satiety of Landscape Architects,Broward Florida Department of Transportation the pedestrian and automobile traffic <br /> Section,Habitat Restoration,October,1995 (FOOT) District 6 Biscayne Boulevard and to improve the street operation and <br />' Builders Association of South Florida, (NE 5th Street to NE 13th Street)-In the aesthetics of the streetscape. <br /> Environmental Issues&Development,1999, <br /> Lecturer order to continue the enhancements of <br /> Florida Engineering Society,Environmental Design the US 1 Corridor for the City of Miami, Cocoa Beach Downtown Streetscape <br /> &Habitat Restoration,April,1995,Lecturer Miller Legg developed a streetscape Comprehensive Master Plan-Miller <br />' Florida Planning and Zoning Association,Public n to unifythe area surrounding Partnerships,lune 2007, design Che Legg was responsible for the preparation <br /> Presenter/Speaker American Airlines Arena, Bicentennial of a comprehensive master development <br /> University of Florida School of Architecture,Where Park and the Performing Arts Center. plan for approximately 1.5 miles of <br />' the Water Meets the Land,September,1996, Enhancement of the pedestrian corridor existingurban streetscape improvements within <br /> Guest Lecturer and integration with the <br /> g Roberto the historic downtown core of Cocoa <br /> Professional&civic Activities: Burle Marx paving design,directly to the Beach.The master plan included <br /> south,was integral in the design of the roadway horizontal alignment,traffic <br /> ' Member,American Society of Landscape Architects <br /> Post Member,American Society of Landscape project. calming,low impact drainage design, <br /> Architects,Florida Executive Committee street lighting, street furnishings and <br /> Member,Broward County Bicycle&Pedestrian St. Maarten Tourist Corridor <br /> Advisory Committee xeric landscape plantings. Additional <br /> ' Beautification -For the major tourist <br /> services include the development of <br /> Member,Broward Section,American Planning p <br /> Association <br /> corridor through the Dutch side of St. construction plans for a 1-mile segment <br /> Past Chair,Broward Section,American Society of Maarten,the Government of St. Maarten of the southbound section of Orlando <br /> Landscape Architects developed a plan to enhance the visual Avenue,a one-way pair through a Joint <br /> Member,Florida Earth Foundation,Engineering aesthetics of the roadwayand hired <br /> Advisory Committee,2004-present Participation Agreement with FDOT. <br /> Member,Florida Recreation and Park Association Miller Legg International to implement <br /> Member,Florida Redevelopment Association the plan. The project included The Waterfront-G9-Miller Legg <br /> ' Member,Urban Land Institute beautification of approximately two provided landscape architecture for a <br /> miles of roadway corridor,a vehicular 725-acre urban mixed-use development <br /> roundabout,and shoreline improvement in the Waterfront District of Dubai, <br /> ' to the Great Salt Pond. Services United Arab Emirates.The project area <br /> .\/".. <br /> � provided included Conceptual Landscape includes six miles of urban streetscape, <br /> MILLER LEGG <br />