Laserfiche WebLink
I <br /> Michael Kroll, RLA <br /> ' four miles of commercial and residential Water Management District, and improvements throughout the project <br /> waterfront,and three major urban parks. Broward County Environmental area. Work was completed directly for <br /> Services include conceptual through final Protection Department.The seagrass the City under our Miscellaneous <br /> Idesign plans for the project's landscape, • survey was conducted using scuba diving Surveying and Mapping Contract. <br /> hardscape, irrigation,site furnishings, and digital global positioning satellite <br /> water features,architectural amenities, equipment and included CCCL Permitting Miami Beach-Miller <br /> ' signage and lighting. This project was transect/quadrant measurements of <br /> seagrass density,abundance,and Legg assisted a landscape architectural <br /> developed to achieve Gold LEED firm EDAW(as a sub)with the processing <br /> Certification. frequency of occurrence. of a CCCL(Coastal Construction Control <br /> Line) Permit through FDEP. In particular, <br /> I <br /> Tamiami Trail Master Plan and Boynton Beach Oceanfront Park the firm prepared a CCCL survey, <br /> Guidelines—This project included the Boardwalk-Miller Legg is the prime through a combination of field ground <br /> development of a Corridor Master Plan consultant for the replacement of truthing and CAD work. Miller Legg then <br /> I for a 3-mile segment of US Highway 41, <br /> also known as Tamiami Trail, in Manatee existing boardwalk and minor structures related the proposed improvement <br /> at Oceanfront Boardwalk Park in features to the CCCL in CAD drawings <br /> County. Approximately two-thirds of this Boynton Beach. The goal of the City was which were submitted to FDEP as part of <br /> I corridor is located in Manatee County's to renovate their only beach access park. the CCCL permit application. <br /> South County Community Other elements of this improvement <br /> Redevelopment Area and was project include hardscape,lighting and Town of Miami Lakes Streetscape <br /> considered blighted.The plan provided a landscape. Services being provided by Master Plan-Miller Legg is the Town of <br /> ' comprehensive land use,transportation the Miller Legg team include Miami Lakes'Consultant Landscape <br /> and policy analysis geared toward the environmental permitting, surveying, Architect responsible for a variety of on- <br /> redevelopment of the roadway and architectural design,structural going landscape architecture <br /> t abutting properties along the corridor. engineering,electrical engineering, assignments and specifically for <br /> landscape architecture, site analysis, development of a comprehensive Town <br /> West Lake Park II- Environmental construction documents and Streetscape Master Plan.The Town <br /> Services-Miller Legg is the prime construction observation services. This consists of a 35-year old streetscape for <br /> I consultant for the permitting and design project requires extensive coordination original parts of the Town and newly <br /> of enhancements for the second phase with the City's Park& Recreation annexed components which have <br /> of this 1,500-acre estuarine wetland. Department, Public Works Department, doubled its size. The primary network of <br /> I Services provided included:paving and <br /> drainage improvements for the nature Purchasing Department, Building streets include all arterials and many <br /> Department, and various subconsultants. collector streets which comprise some <br /> center and associated parking lot,design 12 miles of roadways. Miller Legg <br /> of three sewage pump stations,water City of Miami Beach Boardwalk II developed an approach to the project <br /> Idistribution system design,sanitary Topographic Survey- Miller Legg that includes development or assembly <br /> sewage collection and transmission recently completed work on a of all data necessary;organizing and <br /> system design,off-site force main,traffic topographic and Coastal Construction conducting a public workshop to gather <br /> engineering,surveying, water quality Control Line(CCCL)survey to help public input and support; development <br /> data analysis, hypothesis development facilitate the design of improvements to of a phased schedule of landscape <br /> and review,sediment analysis,fishery a beach boardwalk located between implementation plans;and production of <br /> analysis,rip-rap design,benthic macro- Lummus Park and South Point Drive in a schedule for implementation tied to <br /> Iinvertebrate identification,seagrass Miami Beach. The survey included beach identified existing and future funding <br /> survey,mitigation credit determination, transects to the Mean Low Water Line, resources. In funding, Miller Legg has <br /> and permitting with the US Army Corps establishment of the Coastal successfully prepared a grant for Town <br /> I of Engineers,Florida Department of <br /> Environmental Protection,South Florida Construction Control and Erosion Control landscaping of existing parks through the <br /> Lines, and location of surface State of Florida Department of Forestry. <br /> I <br /> I <br /> I <br /> `e <br />