|
I
<br /> Dylan Larson, PWS, CEP
<br /> II
<br /> 4„. Senior Biologist
<br /> .tt r, Professional Experience: survey was conducted using scuba diving
<br /> I
<br /> _ ' C.41_,.` 1,1. .zs and digital global positioning satellite
<br /> Mr. Larson has significant experience in equipment and included
<br /> environmental consulting in Florida and transect/quadrant measurements of
<br /> I
<br /> is responsible for overseeing and seagrass density,abundance,and
<br /> F;? performing studies and investigations on frequency of occurrence.
<br /> biological and ecological impacts
<br /> Years of Experience:19 affecting the firm's projects.This Hallandale Beach Boulevard Corridor
<br /> Years With the Firm:18 includes field evaluations,assessments, Study-Miller Legg performed the design
<br /> recommendations and report writing. and permit approvals for FDOT and
<br /> Registrations&certifications: Broward County Traffic Engineering
<br /> I Professional Wetland Scientist,1999 Dylan has established himself as a Department for the conversion of two
<br /> Wetland Delineation Certification,1995 valuable leader and team member on a Hallandale Beach one way collector
<br /> Certified Environmental Professional,2004 variety of the firm's projects that have roadways,to two way facilities. The two
<br /> PADI Certified Rescue Diver,2003 involved environmental issues.Specific key issues addressed were meeting the
<br /> I Education: responsibilities include:wetland alignment criteria and not causing
<br /> Bachelor of Science,Biology and Business jurisdictional determination,dredge and additional delays in traffic flow on
<br /> Administration fill permitting,wetland mitigation design, Hallandale Beach Boulevard. The
<br /> I University of Wisconsin-Stevens Point,1994 mitigation monitoring, alignment was not an issue since a
<br /> Muster ofBusiness Administration recommendations for maintenance
<br /> Nova Southeastern University,1998 southbound through movement was not
<br /> procedures,coordination and oversight being provided at either intersection.
<br /> I Continuing Education: of environmental GIS applications,and The analysis of the traffic flow on
<br /> FOOT Environmental Management Training Course assistance with plan preparations and Hallandale Beach Boulevard require a
<br /> Hydric Soils Seminar,Florida Assoc.of mitigation. progression analysis of the traffic signals
<br /> Environmental Soil Scientists from 14th Avenue to SR AlA,which
<br /> ' y
<br /> Professional&Civic Activities: g Relevant Project Experience: illustrated how the signal cycles affected
<br /> Member,Broward County Climate Change Task the traffic flow. In addition,left turn
<br /> Force,2008-current West Lake Park II-Environmental flashing arrows(permitted left turn),
<br /> I
<br /> Technical Team Member,Broward County Water Services-Miller Legg is the prime elimination of pedestrian crosswalks and
<br /> Resources Task Force,2008-current consultant for the permitting and design modification to signals to eliminate
<br /> Past Member,Broward League of Cities, of enhancements for the second phase
<br /> crossing maneuvers, reduction cycles
<br /> Environmental Committee of this 1,500-acre estuarine wetland.
<br /> Member,FILE/SFWMD Water Resources Liaison and improvement to traffic flow were
<br /> I Committee,2009-current Services provided included:paving and
<br /> drainage improvements for the nature also a part of the traffic analysis.
<br /> Post President and Past BoardofDirectors,Florida Services provided include: traffic
<br /> Association of Environmental Professionals, center and associated parking lot,design engineering and transportation planning,
<br /> Treasure Coast of three sewa a pumpstations,water
<br /> distribution system design,sanitary
<br /> I
<br /> Member,National Association of Environmental g surveying,roadway design,drainage
<br /> Professionals design,public participation and utility
<br /> sewage collection and transmission coordination.
<br /> • system design,off-site force main,traffic
<br /> I engineering,surveying,water quality Hallandale Beach Water and Force Main
<br /> data analysis, hypothesis development Biological Monitoring-Miller Legg is on
<br /> and review,sediment analysis,fishery call to provide biological monitoring
<br /> I analysis, rip-rap design, benthic macro- services for horizontal directional drill
<br /> invertebrate identification,seagrass crossing under the Intracoastal
<br /> survey, mitigation credit determination, Waterway at three bridge locations
<br /> and permitting with the US Army Corps within the City. While drilling is
<br /> I
<br /> of Engineers,Florida Department of occurring,we are on standby in the
<br /> Environmental Protection,South Florida event there is a fracture in the sediment
<br /> Water Management District,and (frac-out). In that case,we respond
<br /> I
<br /> Broward County Environmental within two hours.
<br /> `�� Protection Department.The seagrass
<br /> MILLER LEGG
<br />
|