Laserfiche WebLink
Dylan Larson, PWS, CEP <br /> IPort Properties/Hollywood Harbour-A Particular Concern(LAPC)area. Miller Airport Master Plan into the Runway <br /> proposed 600-slip boat marina in Legg staff travelled,along with FXE project approach where environmental <br /> Broward County.Services provided airport personnel,to review site or other sustainability benefits could be <br /> I <br /> include:wetland permitting,permit conditions and presence of protected realized. Miller Legg is a subconsultant to <br /> compliance,mitigation design,permit species. During this intensive review, Atkins North America. <br /> extension through BCDNRP, USACOE, Miller Legg staff observed, in detail, <br /> ' FDEP,and DRI update and compliance general topographic and soil conditions Florida Department of Transportation <br /> assistance. and characteristics of the airfield areas (FOOT) District 4 Sheridan Street <br /> as they physically traversed the site. The Boardwalk-For this project, Miller Legg <br /> City of Fort Lauderdale Environmental mapping of the protected species has provided environmental permitting and <br /> I <br /> Master Continuing Services Contract- provided us with intimate knowledge of surveying services for the installation of <br /> Miller Legg has been providing drainage and topographical features of a pedestrian boardwalk in West Lake <br /> Continuing Environmental Services to Ft. the entire airfield. Specifically,we have Park. In addition,extensive coordination <br /> ' Lauderdale since 2007.Services provided observed that the western approach to with the FOOT,City of Hollywood,and <br /> to the City on a work order basis include the landing strip is slightly lower in the Broward County Parks and <br /> threatened and endangered species elevation,discouraging gopher tortoise Recreation Department was required. <br /> ' assessments and Phase I and Phase II and burrowing owl occupation in this <br /> area. However,the elevation isnot low This project in being completed under a <br /> Environmental Site Assessments. Districtwide Miscellaneous Drainage <br /> Interpretation of environmental impacts enough to cause growth of wetland contract as a subconsultant to C3TS. <br /> to City projects in blighted areas has species that would indicate that the area <br /> ' been provided by Miller Legg on several ponds or retains water for long periods Weatherbee Road Sidewalk Project- <br /> projects for the neighborhood of time. All pervious areas within the Miller Legg was retained by St. Lucie <br /> improvement group.Services also airfield consist of sandy soils and most County to assist them in the preparation <br /> I include indoor air quality/asbestos and <br /> lead-based paint evaluations. are found in relatively higher elevations. of National Environmental Policy Act <br /> (NEPA)documentation. In particular,we <br /> Fort Lauderdale/Hollywood prepared the Type I Categorical Exclusion <br /> City of Fort Lauderdale General International Airport South Runway environmental support documents for a <br /> IEnvironmental Engineering Services- Project- Miller Legg is the lead sidewalk project. This documentation <br /> Miller Legg has been providing professional for environmental was used to comply with the federal <br /> continuing environmental services to permitting and for determining funding requirements associated with <br /> ' Fort Lauderdale since 2007 and currently sustainability strategies viable for the Federal Highway Administrations' <br /> holds a General Environmental implementation on the new South (FHWA's)Local Agency Program(LAP). <br /> Engineering Services Contract through Runway project.The role of the firm also This project involved the construction of <br /> 2015. Services provided include includes tracking of all other site permits a new 1.8-mile sidewalk loop along <br /> ' threatened and endangered species including stormwater,utility,FEC and Weatherbee Road in St. Lucie County. <br /> assessments,environmental permitting roadway permits.The new Runway is The LAP program is administered,at the <br /> compliance,consent order coordination, proposed to be 8,000 LF and elevated to state level,through the Florida <br /> ' bid preparation,environmental cross over the Airport's Perimeter Road, Department of Transportation(FOOT). <br /> construction observation,certified the FEC railroad and USl. Extensive This sidewalk project was funded <br /> arborist services and Phase I and Phase II permitting agency coordination is through the FHWA Safe Routes to School <br /> Environmental Site Assessments. required due to mangrove and other -Program to provide safe access to <br /> I Services also include indoor air wetland impacts. Utilizing LEED criteria, students to Weatherbee Elementary <br /> quality/asbestos and lead-based paint sustainability opportunities exist in School from the surrounding residential <br /> evaluations. selection of more energy efficient neighborhoods. Miller Legg provided <br /> I <br /> utilities inside the structures over the coordination services with agencies such <br /> Fort Lauderdale Executive Airport roadways and in preservation of existing as:FDOT, U.S. Fish and Wildlife Service, <br /> Gopher Tortoise Plan-Miller Legg resources. Project evaluation was also and State Historic Preservation Officer. <br /> recently completed a comprehensive completed to determine opportunities to <br /> I <br /> gopher tortoise and burrowing owl reduce the heat island effect,reduce <br /> survey and assessment of the active irrigation water use from potable water, <br /> airfield and adjacent Local Area of and incorporate other elements of the <br />