Laserfiche WebLink
I <br /> Christopher Keller, RLA,AICP <br /> 1 firm's role.All landscape,hardscape, and Florida Department of Environmental selection of more energy efficient <br /> irrigation plans were designed to also Protection(FDEP)permitting east of the utilities inside the structures over the <br /> meet Florida Department of Coastal Construction Control Line(CCCL), roadways and in preservation of existing <br /> ITransportation District 5 standards. CCCL surveying, restroom design and resources. Project evaluation was also <br /> replacement,shade pavilion design and completed to determine opportunities to <br /> Boynton Beach Oceanfront Park replacement,boardwalk redesign and reduce the heat island effect,reduce <br /> I Boardwalk-Miller Legg is the prime implementation, hardscape irrigation water use from potable water, <br /> consultant for the replacement of improvements(plazas,seating,signage, and incorporate other elements of the <br /> existing boardwalk and minor structures site furnishings), coastal dune Airport Master Plan into the Runway <br /> at Oceanfront Boardwalk Park in restoration, landscape design, project approach where environmental <br /> Boynton Beach. The goal of the City was interactive splash pad design,and or other sustainability benefits could be <br /> to renovate their only beach access park. construction administration. Success of realized. Miller Legg is a subconsultant to <br /> Other elements of this improvement the park restoration program has Atkins North America. <br /> ' project include hardscape,lighting and <br /> landscape. Services being provided by required close coordination with the City <br /> of Fort Pierce and subconsultants to Tamiami Trail Master Plan and <br /> the Miller Legg team include incorporate typically fast-tracked Guidelines-Mr. Keller was the project <br /> environmental permitting,surveying, schedule requirements. manager and principal planner for the <br /> I <br /> architectural design,structural development of a Corridor Master Plan <br /> engineering, electrical engineering, City of Orlando Landscape Architecture for a 3-mile segment of US Highway 41, <br /> landscape architecture,site analysis, &Land Planning Continuing Contract-A also known as Tamiami Trail,in Manatee <br /> I construction documents and continuing contract to provide a variety County. Approximately two-thirds of this <br /> construction observation services. This of on-going landscape architecture and corridor is located in Manatee County's <br /> project requires extensive coordination land planning consulting services for the South County Community <br /> I with the City's Park&Recreation City of Orlando to include, but not Redevelopment Area and was <br /> • <br /> Department, Public Works Department, limited to:conceptual design, park considered blighted.The plan provided a <br /> Purchasing Department, Building planning,landscape design and comprehensive land use,transportation <br /> Department,and various subconsultants. specifications, hardscape design, project and policy analysis geared toward the <br /> I <br /> image design, lighting design and redevelopment of the roadway and <br /> City of Fort Pierce Continuing Services- specifications,streetscape programs, abutting properties along the corridor. <br /> Miller Legg currently maintains a illustrative graphics, irrigation design and <br /> ' Continuing Services contract with the - specifications,construction bidding Tavares Gateway Landscape Project- <br /> City of Fort Pierce Redevelopment assistance,construction observation, Creation of a significant entry feature <br /> Agency to provide landscape public involvement assistance, master into the City of Tavares,at the <br /> architecture and ancillary planning and site planning,feasibility analysis, intersection of newly-widened US 441 <br /> I services. Projects under this contract redevelopment programs and urban with SR 19 and SR SODA.The area <br /> have been completed or are in varying design,streetscape and corridor contains a triangular retention pond and <br /> stages of design or construction. Miller planning,and land-use analysis. occupies a prominent location as the <br /> I Legg has provided multiple services for entry-way into the City from the north. <br /> the restoration of five waterfront parks Fort Lauderdale/Hollywood The design consists of landscaping that <br /> and one inner city park within the City of International Airport South Runway serves as a major focal point. Large trees <br /> Fort Pierce. The parks include Pioneers Project-Miller Legg is the lead and palms have been placed in the <br /> IPark,South Beach Park, Kimberly professional for environmental corners and along the sides of the <br /> Bergalis Park,Surfside Park,Jaycee Park permitting and for determining triangular body of water. There are <br /> and Jetty Park. The projects combine sustainability strategies viable for massive beds of shrubs that create <br /> I elements of both active and passive on the new South continuity and a setting for the other <br /> parks and can be found in urban and Runway project.The role of the firm also plants. The majority of the plant <br /> coastal settings. Services provided to the includes tracking of all other site permits materials are native and of xeriscape <br /> City include landscape architecture including stormwater,utility,FEC and species. Future plans call for a five-jet <br /> design,civil engineering,surveying and roadway permits.The new Runway is fountain in the pond which will spray <br /> environmental permitting. In addition, proposed to be 8,000 LF and elevated to water over 40 feet into the air,creating <br /> Miller Legg manages subconsultants for cross over the Airport's Perimeter Road, an even more exciting entrance feature. <br /> ' geotechnical,structural,electrical and the FEC railroad and USl. Extensive Plans were reviewed and approved by <br /> lighting services. Project tasks have permitting agency coordination is Florida Department of Transportation <br /> included:charrette services, master required due to mangrove and other District 5. <br /> planning, permitting through FDEP, wetland impacts.Utilizing LEED criteria, <br /> ' <br /> SFWMD,and the City of Fort Pierce, sustainability opportunities exist in <br /> ``7 <br />