Laserfiche WebLink
I <br /> Y . Ronald Rollins, RLA . <br /> IDesign <br /> ' S.a Professional Experience: <br /> I x' : -----• <br /> --- ' Miramar Parkway Lane Reduction Study <br /> Mr.Rollins is responsible for landscape -Conducted study of impact of <br /> architectural design for a varietyof <br /> B eliminating outside lanes on this one-half <br /> a public and private projects including mile segment of Miramar Parkway(SR7 <br /> '. 14 j <br /> roadway landscaping and irrigation, to SW 64 Avenue),therefore reducing <br /> • <br /> active and passive park landscape the cross-section from a six-lane divided <br /> Years of Experience:20 design,as well as residential and to a four-lane divided roadway. Existing <br /> ' Years with the Firm:9 commercial projects. and future operating conditions of <br /> segments and intersections along the <br /> Registrations&Certifications: Relevant Project Experience: study corridor were analyzed. Future <br /> I Registered Landscape Architect,FL,1994 demand was based on a combination of <br /> City of Coconut Creek SR 814/Atlantic historical growth rates and long-range <br /> Education Boulevard Landscape Beautification model projections.This older,low- <br /> Bachelor of Landscape Architecture Improvements-Under the firm's intensity retail,corridor reflects minimal <br /> I University of Florida,1992 ContinuingServices contract for <br /> Bachelor of Science,Chemical Engineering access management,with significant <br /> University of Florida,1982 Landscape Architecture services,Miller parking which backs directly onto <br /> Legg is providing landscape Miramar Parkway. Miller Legg <br /> I Publications&Presentations: beautification improvements to this inventoried parking spaces and access <br /> Florida Main Street"Main Street Minute" roadway corridor from west of Lyons connections for all 31 parcels,studied <br /> Newsletter,Moore Haven landscape,May& Road to the Florida Turnpike. Services weekday and weekend parking <br /> June 2007,Author include landscape architecture, <br /> P occupancy and developed a conceptual <br /> I Professional&Civic Activities: hardscape,irrigation,water use plan to improve safety and access <br /> Member,American Society of Landscape Architects permitting,construction observation, management,eliminating back-out <br /> traffic control and surveying services. parking while providing additional <br /> I We also facilitated the plans for streetscape amenities and landscaping. <br /> execution of agreements and provided <br /> . coordination with FOOT District 4 and Miramar Parkway Redevelopment-This <br /> I Florida's Turnpike Enterprise. redevelopment and streetscape project <br /> included a two-mile,two-block urban <br /> Florida Department of Transportation section of the Miramar Parkway corridor <br /> (FDOT) District 4 Districtwide adjacent to SR 7/US 441. Miller Legg <br /> I Landscaping Design/Production In <br /> House Design Support-Miller Legg designed the landscape and irrigation <br /> improvements for Florida Department of <br /> currently has a multi-year districtwide Transportation (FOOT)along this corridor <br /> I landscape architecture contract to north and south of Miramar Parkway. In <br /> support in-house projects. Under this addition,certified arborist services were <br /> contract,we are providing planting provided for a tree inventory and quality <br /> design,irrigation design, hardscape evaluation. The proposed streetscape <br /> I design and miscellaneous support improvements included enhancement of <br /> services as well as minor engineering the pedestrian corridor to encourage <br /> design to support in-house landscape safe pedestrian traffic for adjacent <br /> I projects. commercial and office uses.The design <br /> also calls for consolidated parking areas <br /> Las Olas Boulevard Study(Individual rather than replacing backout parking in <br /> Experience)-Traffic and Urban Design front of businesses for the safety of both <br /> study for Las Olas Boulevard (downtown the pedestrian and automobile traffic <br /> Ft. Lauderdale). Project included public and to improve the street operation and <br /> workshops,traffic studies,traffic the aesthetics of the streetscape. <br /> Pmanagement and urban/streetscape <br /> ` design. <br /> MILLER LEGG <br /> 0 <br />