Laserfiche WebLink
I J Bonfill&Associates <br /> RFO#12-04-02 Page 27 <br /> I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. 03 <br /> Complete one Section F Mr each project.) - <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2010 <br /> Parking Garage 5- University Park Campus PROFESSIONAL SERV CES CONSTRUCTION(If applicable) <br /> Florida International University- Miami, Florida Land Surveying N/A <br /> I23. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Florida International University Thaddeus Smith 305-216-4021 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope.size,and cost) <br /> Description: Complete Land Surveying Services for the Design and Construction of 2,000-space/7-Level Parking Garage Structure. <br /> Improvements included site utilities and underground utilities,commercial shell space on ground floor,police department. <br /> IScope of Work: Specific Purpose Topographic Survey including: <br /> • Location of all above ground improvements within the requested boundaries relative to Florida State Plane Coordinates System Grid <br /> • Location of all walls,fences and foundations inclusive of,adjacent to and within five feet outside of the defined boundary <br /> I • Permanent Buildings, Temporary Buildings <br /> • Temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid <br /> • Official data upon which the elevations are based. Bench mark established on/or adjacent to site <br /> • Elevations, Cross Sections at 50'intervals <br /> I • Location of all curbs, building lines, street alleys,sidewalks,curb grades, adjacent grade,description of materials. <br /> • Location of Walkways, Parking,Curbs,Asphalt Areas. <br /> • Location of all known/visible utility services, poles,wires,hydrants,catch basins&manholes. <br /> • Right of Ways. <br /> I • Tree Location and Identification. <br /> • Surveying Services throughout the construction for General/Specialty Contractors. <br /> Total fees paid to firm: $15,000 . <br /> I Project Start Date: 06/2008 Completion Date: 08/2010 <br /> Total time of construction: Estimated: N/A Actual: N/A <br /> Total cost of construction: Estimated: N/A Actual: N/A <br /> Owner Information: Florida International University Facilities Management/Facilities Development Department <br /> I CAMPUS SUPPORT COMPLEX CSC#245 University Park Campus Miami, Fl 33199 <br /> Paulo Costa, Construction Projects Coordinator Phone: (305)348-4009 Email: Paulo.Costa ac fiu.edu <br /> Client Information: Turner Construction Company FIU Parking Garage 5 <br /> I 885 SW 109`"Avenue Miami FL 33199 <br /> • Thaddeus Smith,LEED AP,Senior Project Manager • <br /> • <br /> Phone: 305-552-9417 Fax: 305-207-7584 Cel: 305-216-4021 E-mail: tsmith@tcco.com <br /> I25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(Cary and State) (3)ROLE <br /> I a. <br /> b (1)FIRM NAME - <br /> (2)FIRM LOCATION(City and State) (3)ROLE <br /> c. <br /> (1)FIRM NAME (2)FIRM LOCATION(Ctty and State) (3)ROLE <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> Ie. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> f (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> I <br /> I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(62004)PAGE <br /> MANDATORY USE DATE OF FORM 6/2004 <br /> I <br />