Laserfiche WebLink
I . J Bonfill 8 Associates <br /> RFQ#12-04-02 Page28 <br /> F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. 04 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2008 <br /> I FIU Golden Panther Stadium University Park PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Florida International University,Miami, Florida Land Surveying N/A <br /> 1 23. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> Florida International University Paulo Costa 305-348-4009 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> IDescription: <br /> Specific Topographic Survey of the FIU Golden Panther Stadium. The approximate area is 8.15 Acres. <br /> I Scope of Work: Specific Purpose Topographic Survey including but not limited to: <br /> Location of all above ground improvements within the requested boundaries relative to Florida State Plane Coordinates System Grid. <br /> Location of all walls,fences and foundations inclusive of,adjacent to and within five feet outside of the defined boundary.Permanent <br /> Buildings,Temporary Buildings,Adjacent Lake Area <br /> I Provide temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid. <br /> Official data upon which the elevations are based and the bench mark established on or adjacent to the site. <br /> Elevations,Cross Sections at 50'intervals <br /> Location of all curbs,building lines,street alleys, sidewalks,curb grades,adjacent grade,description of materials. <br /> Location of Walkways, Parking,Curbs,Asphalt Areas, Football field, Goals, Scoreboards&Signs, Running track, Bleachers. <br /> I Location of all known and visible utility services, poles,wires, hydrants,catch basins and manholes. <br /> Right of Ways,Tree Location and Identification. <br /> Surveying Services throughout Construction <br /> I Total fees paid to firm: 524,800 <br /> Project Start Date: 10/2005(Design) Completion Date: 05/2008(Construction) <br /> Total time of construction: Estimated: N/A Actual: N/A <br /> Total cost of construction: Estimated: N/A Actual: N/A <br /> I Client Information: Florida International University Facilities Management/Facilities Development Department <br /> Paulo Costa,Construction Projects Coordinator <br /> CAMPUS SUPPORT COMPLEX CSC#245 University Park Campus Miami, Fl 33199 <br /> I. Phone: (305)348-4009 Email: Paulo.Costa(ohfiu.edu <br /> 1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. <br /> 111 <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. <br /> I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> c. <br /> I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> Ie. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> I1 <br /> I AUTHORIZED FOR LOCAL REPRODUCTION <br /> MANDATORY USE DATE OF FORM 6/2004STANDARD FORM 330(6 2004)PAGE <br /> I <br />