|
I J Bonfill 8 Associates
<br /> RFQ#12-04-02 Page 48
<br /> IE. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Structulal Engineer a.TOTAL O.WITH CURRENT FIRM
<br /> I David Santamaria 30 2
<br /> 15.FIRM NAME AND LOCATION(City and State/
<br /> Nifah and Partners Consulting Engineers, Inc Miami,FL
<br /> 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISC/PUNE)
<br /> 1 MS - Structural Engineer Engineer Intern - E.I .
<br /> 1 18. OTHER PROFESSIONAL OUAUF1CATIONS(Pub#cat%ons,Organizations, Tractmg,Awards,etc.)
<br /> Computer operator and programmer
<br /> PhD Candidate, 2011
<br /> 19. RELEVANT PROJECTS
<br /> 111 TITLE AND LOCATION(City and Stare) (21 YEAR COMPLETED
<br /> I Hotel de L'Opera at 1771 NE 4th
<br /> Ave. , Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(II applicable)
<br /> 2009
<br /> 13)BRIEF DESCRIPTION(Brie!scope,size,cost,etc.)AND SPECIFIC ROLE Idl Check i(project performed with Current firm
<br /> a.
<br /> I Project Engineer responsible for coordination of the structural design and development
<br /> of the construction documents. The building is a 39-story residential with P.T.
<br /> concrete slabs, concrete shear walls and columns on auger-cast pile foundation:
<br /> Estimated project construction cost $100,000,000
<br /> (11 TITLE AND LOCATION(City and Slate) (21 YEAR COMPLETED
<br /> I Camillus House at Downtown Miami, PROFESSIONAL SERVICES CONSTRUCTION(II applicable)
<br /> FL 2009
<br /> (3) BRIEF DESCRIPTION(Bile/scope,size,cost,etc./AND SPECIFIC ROLE U Check if project performed with current firm
<br /> b.
<br /> 1 ' Project Engineer responsible for coordination of the structural design and development
<br /> of the construction documents. The building consists of 6-modules, 5 stories each, with
<br /> P.T. concrete slabs, masonry shearwalls, concrete columns on pile foundation.
<br /> Estimated project construction cost: $35,000,000.
<br /> 1 (11 TITLE AND LOCATION(City and State) YEAR COMPLETED
<br /> Everglades on the Bay at 3ayside PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> area, Downtown Miami. 2007 2009
<br /> 13) BRIEF DESCRIPTION(Brie(scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm
<br /> 1 c.
<br /> Project Engineer responsible for coordination of the structural design and development
<br /> of the construction documents. The building is a 52-story residential with P.T.
<br /> concrete slabs, concrete shear walls and columns on auger-cast pile foundation.
<br /> Estimated project construction cost $220,000,000
<br /> 111 TITLE AND LOCATION(City and State) (21 YEAR COMPLETED
<br /> The Opera Tower (Miramar Ph. II) , PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> NE 17th St./4th Ave. , Miami, FL 2005 2008
<br /> d. (31 BRIEF DESCRIPTION(Brief scope,size,cost, enc.)AND SPECIFIC ROLE U Check if project performed with current firm
<br /> Project Engineer responsible for coordination of the structural design and development
<br /> of the construction documents. The building is a 58-story residential with P.T.
<br /> concrete slabs, concrete shear walls and columns on auger-cast pile foundation.
<br /> IEstimated project construction cost $150,000,000
<br /> 111 TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> The 500 Brickell at Brickell area, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Miami, FL 2005 2008
<br /> I (31 BRIEF DESCRIPTION(Brie!scope.size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm
<br /> e.
<br /> Two 44-story condominium towers designed over pile foundation. The tower structural
<br /> systems consist of concrete shearwalls and columns, and Post-Tensioned concrete slabs.
<br /> IEstimated project construction cost $150,000,000
<br /> • STANDARD FORM 330 (6/20041 PAGE 2
<br /> I
<br /> 1
<br />
|