Laserfiche WebLink
I J Bonfill 8 Associates <br /> RFQ#12-04-02 Page 48 <br /> IE. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Structulal Engineer a.TOTAL O.WITH CURRENT FIRM <br /> I David Santamaria 30 2 <br /> 15.FIRM NAME AND LOCATION(City and State/ <br /> Nifah and Partners Consulting Engineers, Inc Miami,FL <br /> 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISC/PUNE) <br /> 1 MS - Structural Engineer Engineer Intern - E.I . <br /> 1 18. OTHER PROFESSIONAL OUAUF1CATIONS(Pub#cat%ons,Organizations, Tractmg,Awards,etc.) <br /> Computer operator and programmer <br /> PhD Candidate, 2011 <br /> 19. RELEVANT PROJECTS <br /> 111 TITLE AND LOCATION(City and Stare) (21 YEAR COMPLETED <br /> I Hotel de L'Opera at 1771 NE 4th <br /> Ave. , Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(II applicable) <br /> 2009 <br /> 13)BRIEF DESCRIPTION(Brie!scope,size,cost,etc.)AND SPECIFIC ROLE Idl Check i(project performed with Current firm <br /> a. <br /> I Project Engineer responsible for coordination of the structural design and development <br /> of the construction documents. The building is a 39-story residential with P.T. <br /> concrete slabs, concrete shear walls and columns on auger-cast pile foundation: <br /> Estimated project construction cost $100,000,000 <br /> (11 TITLE AND LOCATION(City and Slate) (21 YEAR COMPLETED <br /> I Camillus House at Downtown Miami, PROFESSIONAL SERVICES CONSTRUCTION(II applicable) <br /> FL 2009 <br /> (3) BRIEF DESCRIPTION(Bile/scope,size,cost,etc./AND SPECIFIC ROLE U Check if project performed with current firm <br /> b. <br /> 1 ' Project Engineer responsible for coordination of the structural design and development <br /> of the construction documents. The building consists of 6-modules, 5 stories each, with <br /> P.T. concrete slabs, masonry shearwalls, concrete columns on pile foundation. <br /> Estimated project construction cost: $35,000,000. <br /> 1 (11 TITLE AND LOCATION(City and State) YEAR COMPLETED <br /> Everglades on the Bay at 3ayside PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> area, Downtown Miami. 2007 2009 <br /> 13) BRIEF DESCRIPTION(Brie(scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> 1 c. <br /> Project Engineer responsible for coordination of the structural design and development <br /> of the construction documents. The building is a 52-story residential with P.T. <br /> concrete slabs, concrete shear walls and columns on auger-cast pile foundation. <br /> Estimated project construction cost $220,000,000 <br /> 111 TITLE AND LOCATION(City and State) (21 YEAR COMPLETED <br /> The Opera Tower (Miramar Ph. II) , PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> NE 17th St./4th Ave. , Miami, FL 2005 2008 <br /> d. (31 BRIEF DESCRIPTION(Brief scope,size,cost, enc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> Project Engineer responsible for coordination of the structural design and development <br /> of the construction documents. The building is a 58-story residential with P.T. <br /> concrete slabs, concrete shear walls and columns on auger-cast pile foundation. <br /> IEstimated project construction cost $150,000,000 <br /> 111 TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> The 500 Brickell at Brickell area, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Miami, FL 2005 2008 <br /> I (31 BRIEF DESCRIPTION(Brie!scope.size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> e. <br /> Two 44-story condominium towers designed over pile foundation. The tower structural <br /> systems consist of concrete shearwalls and columns, and Post-Tensioned concrete slabs. <br /> IEstimated project construction cost $150,000,000 <br /> • STANDARD FORM 330 (6/20041 PAGE 2 <br /> I <br /> 1 <br />