Laserfiche WebLink
II J Bonfill&Associates <br /> RFO#12-04-02 Page 49 <br /> 1E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Structural Engineer a.TOTAL b.WITH CURRENT FIRM <br /> II Ronald L. Du-an, P.E. J 36 2 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Nifah and Partners Consulting Engineers, Inc Miami,FL <br /> 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINEJ <br /> II B.S. - Structural and Civil <br /> M.S. (Italy) - Structural Professional Engineer State of Florida <br /> ?Ejj 36075 - Structural <br /> 1 18. OTHER PROFESSIONAL QUALIFICATIONS(Pubecutions,Organizations,Training,Awards,etc.) <br /> Continuing Education Provider for Professional Engineers <br /> General Contractor (Inactive) <br /> I <br /> 19. RELEVANT PROJECTS <br /> Ill TITLE AND LOCATION(City and State) 12)YEAR COMPLETED <br /> 1Paramount Bay at Edge Water at PROFESSIONAL SERVICES CONSTRUCTION(/l applicable) <br /> Biscayne bay, Downtown Miami 2006 2009 <br /> 131 BRIEF DESCRIPTION(Brief scope.size, cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> a. <br /> 52-story residential building with 6-story parking garage. Performed complete <br /> structural design and structural construction administration. The structure consists of <br /> concrete P.T. slabs, conc. shearwalls and columns, and auger-cast pile foundation. <br /> Estimated project construction cost: S200,000,000. <br /> p)TITLE AND LOCATION IC/ryas/flare) 121 YEAR COMPLETED <br /> II Terrazas-at River Park - So. River PROFESSIONAL SERVICES CONSTRUCTION III applicable) <br /> Drive & NW 19th Ave. , Miami, FL 2006 2009 <br /> 131 BRIEF DESCRIPTION(an'el scope,size,cost,etc.)AND SPECIFIC ROLE u Check if project performed with current firm <br /> b. <br /> 1 Double Tower 27 & 20 stories, residential building with 7-story parking garage. <br /> Performed complete structural design and structural construction administration. The <br /> structure consists of P.T. concrete slabs, concrete shearwalls and columns, and concrete <br /> mat foundation. Estimated project construction cost: $120,000,000. <br /> II 11)TITLE AND LOCATION(City and State! (2)YEAR COMPLETED <br /> Aventura Marina at Aventura, PROFESSIONAL SERVICES CONSTRUCTION(ll applicable/ <br /> Florida 2006 <br /> 13) BRIEF DESCRIPTION!Brie/scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> I p. <br /> Large 19-Story residential concrete building consisting of 3 sections connected by the <br /> main shearwalls. Performed structural construction administration, including design of <br /> architectural changes, remedial works, review of shop drawings/products, and more. <br /> Estimated project construction cost: $70,000,000 <br /> I 11)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Design audit conducted by Broward PROFESSIONAL SERVICES CONSTRUCTION!/f applicable) <br /> .County Board of Rules & Appeals 2003 <br /> (31 BRIEF DESCRIPTION Wel scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> II d. <br /> Review, comments and recommendations to the board on observed structural designs of 11 <br /> existing residences for possible ammendments to the Code and/or review policies for the <br /> County's plan examinations. Broward County implemented our recommendation for requiring <br /> 1residence structural plans to be signed and sealed by a Florida PE. (no const. involved) <br /> (1)TITLE AND LOCATION(City and State) 121 YEAR COMPLETED <br /> Lynx NOB (New Operating Base) at PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> John Young Street in Orlando, FL - 2003 2006 <br /> I13) BRIEF DESCRIPTION(Brief scope,size, cost,etc.)AND SPECIFIC ROLE u Check if project performed with current firm <br /> e. <br /> This is a bus maintenance facility. We performed struct. design of the admin. building <br /> consisting of composite steel joists with conc. slabs and precast conc. tilt-up walls. <br /> 1 we designed foundations for all maintenance bldos. to support prefab steel structures. <br /> Construction consulting services were provided. Estimated construction cost $40,000,000. <br /> STANDARD FORM 330 (6/20(4) PAGE 2 <br /> I <br /> I <br />