Laserfiche WebLink
.J Bonfill 8 Associates <br /> RFO#12-04-02 Page50 <br /> 1E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Structural Engineer a.TOTAL b.WITH CURRENT FIRM <br /> I Erlan Pa)enzuela 24 2 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Nifah and Partners Consulting Engineers, Inc Miami,FL - <br /> 16.EDUCATION (DEGREE AND SPEC/AL24TION) IT.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> I Structural - B.S. Engineer Intern, E.I. 4 1100007199 <br /> (State of Florida) <br /> 1 18. OTHER PROFESSIONAL QUALIFICATIONS(htbbcations, Organizations, Training.Awards.etc.) <br /> 19. RELEVANT PROJECTS <br /> (I)TITLE AND LOCATION(City and State) 121 YEAR COMPLETED <br /> Hotel de L'Opera at 1771 NE 4th PROFESSIONAL SERVICES CONSTRUCTION III applicable) <br /> Ave. , Miami, FL 2009 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm • <br /> a. <br /> Analysis and design of 39-story residential building. Design of Concrete and steel <br /> Istructures, with emphasis on finite element modeling and auger-cast pile foundations. <br /> Developed processed and coordinated of structural computer models, with analysis and <br /> dimensioning of shearwall and all other elements. Construction cost $100,000,000. <br /> It)TITLE AND LOCATION(City and State) - 121 YEAR COMPLETED <br /> I Camillus House at Downtown Miami, PROFESSIONAL SERVICES CONSTRUCTION(II applicable) <br /> FL 2009 N/A • <br /> (31 BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> b. <br /> II 6-Modules 5-story residential buildings. Performed complete structural design. The <br /> structure consists of regular and ?.T. concrete slabs, masonry shearwalls and concrete <br /> columns, and pile foundation. Estimated project construction. cost: $35,000,000. <br /> 1 (I)TITLE AND LOCATION(City and State) I 21 YEAR COMPLETED <br /> Everglades on the Bay at Bayside PROFESSIONAL SERVICES'CONSTRUCTION(1/applicable) <br /> area, Downtown Miami. 2007 2009 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC POLE U Check if project performed with current firm <br /> I c. <br /> Double Tower 52-Story residential concrete building. Performed structural design and <br /> structural construction administration, including design of architectural changes, <br /> remedial works, review of shop drawings/products, and more. <br /> Estimated project construction cost: $220,000,000. <br /> p)TITLE AND LOCATION(City and State) (2)YEAH COMPLETED <br /> The Opera Tower (Miramar Ph. II) , PROFESSIONAL SERVICES CONSTRUCTION 11/applicable) <br /> NE 17th St./4th Ave. , Miami, FL 2005 2008 <br /> 1 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> d. <br /> SB-Story residential concrete building and 10-story parking garage. Performed value <br /> engineering re-design of all concrete shear walls. Calculation of Lateral Forces on Slab <br /> elements. Estimated project construction cost: $150,000,000. <br /> 1 Iii TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> The ?laza on Brickell at Downtown. PROFESSIONAL SERVICES CONSTRUCTION PI applicable <br /> Miami, FL 2006 2008 • <br /> 1131 BRIEF DESCRIPTION(Brief scope.size.cost.etc.)AND SPECIFIC ROLE U Check if project performed with current firm <br /> 0. <br /> 57-Story residential concrete building. Performed structural design, including design of <br /> architectural changes, remedial works, and more. <br /> I Estimated project construction cost: $220,000,000. <br /> STANDARD FORM 330(6/2004) PAGE 2 <br /> 1 <br /> 1 <br />