My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J. Bonfill
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
J. Bonfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 4:00:38 PM
Creation date
2/5/2016 4:00:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J Bonfill&Associates <br /> RFQ#12-04-02 Page 98 . <br /> J . B O N F I L L & ASSOCIATE S <br /> Architects <br /> Land Surveyors & Mappers <br /> • <br /> Approach and Methodology <br /> Proposed project methodology: Overall approach to accomplishing the project. <br /> Project Initiation: <br /> Our approach to respond to a request for work order or fee proposal will follow these procedural • <br /> steps: <br /> • Establish Point of contact for each project and provide JBA's assigned representative <br /> • Have preliminary meeting, if warranted, to define the Scope of Services and to resolve any <br /> questions. <br /> • Visit the proposed site, gather all pertinent information necessary for preparing the Proposal <br /> • or Request for Work Order of Notice to Proceed. <br /> Define and/or confirm the scope of work. <br /> • Investigate and become familiar of the project scope and limitations <br /> 1 • Obtain input from Professional Consultants <br /> • <br /> • Generate fee proposal including timeline for completion, staffing and deliverables. <br /> Fee proposals will comply with all the requirements established in the contract. <br /> ' Project Planning: <br /> Approach and Method: Approach, management and methods utilized to plan, conduct, and <br /> administer project, inclusive of procedures to assure timely performance of the work. <br /> I ' JBA will approach each City of Sunny Isles Beach project with the same professionalism that we <br /> serve all County and City agencies and private sector clients whether it is for a proposed multi- <br /> million dollar facility or a minor modification. We remain involved from the beginning of a project to <br /> its final completion, from the feasibility study of a site, through site design and construction, to the <br /> final as-built and close out. Our firm is experienced at conducting Architectural and Engineering <br /> Services in dynamic large sites where there is constant ongoing activity. Our staff is experienced in <br /> coordinating our work with the City's Project Managers and with the Professional Consultants, <br /> General Contractors, and Specialty Contractors as well as with all City, County and State Agencies <br /> having jurisdiction over the project (Building, Zoning, Planning, WASD, Public Works, Fire <br /> Department, DERM, etc.) <br /> Preliminary review and coordination of consultants work. <br /> Our staff enjoys the challenges encountered in conducting demanding work. We pay attention to <br /> details before the work commences. We like to coordinate with the occupants or users and receive <br /> their input. We devote ample office time to the project during the planning stage prior to any design <br /> submittals. <br /> a ' <br /> 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 <br /> AAC002050 • LB3398 • www.jbonfill.com <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.