My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SGM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
SGM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 4:43:40 PM
Creation date
2/5/2016 4:37:20 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • ._014 rs4 <br /> • 0427. _'. • <br /> SGM Engineering, Inc. <br /> t�— City of Sunny Isles Beach RFP No. 12-04-02 <br /> • !, ,=I Continuing Professional Architectural & Engineering Services <br /> • � „o4J, Firms Only (CCNA) <br /> • io Section 2 - Qualifications <br /> o.1V• <br /> • <br /> ® Town of Palm Beach—Electrical and Mechanical Engineering Consultants <br /> Contract reference name, email address, and telephone number <br /> • Michael Roach, PE, MRoacht7a TownofPalmBeach.com 561-838-5440 <br /> • Nature of your firm's responsibility on this contract <br /> ® SGM is providing Mechanical, Electrical, Plumbing, Fire Protection Engineering Design, Construction <br /> Administration, and Commissioning services for this NE work order contract for Services on as needed. SGM is <br /> commissioned to provide engineering design services in areas of: HVAC, IAQ, lighting, power, plumbing, fire alarm, <br /> ® CC-TV/security, systems/audio, LEED and construction administration throughout the Town of Palm Beach. <br /> • SGM's services include but are not limited to: <br /> • Program and Scope Verification <br /> • • Schematic, design development, permitable construction drawings, specs and construction administration <br /> • including the close-out documents <br /> • Peer review, feasibility studies and budgeting <br /> • • Trouble shooting for on-going problems in existing facilities <br /> ® • Renovation replacement for existing chillers, cooling towers, condenser pumps, primary/secondary chilled <br /> water pumps, VFD's, VAV's, Building Automation System, Laboratory systems, library, kitchen/cafeteria, <br /> • offices, computer/ IT rooms, emergency power systems, lightning protections, warehouse, community <br /> centers and auditoriums <br /> • • Review, comment, and approval of design documents, and final construction drawings and specifications <br /> • Commissioning/retro-commissioning/or re-commissioning of existing facilities <br /> • Contract administration and inspection services for construction/renovation projects <br /> • • Inspection and reporting services for existing MEP Systems to identify potential problems that related to, but <br /> ® not limited to materials and workmanship, and system age. Recommended solutions to identified problems <br /> included a detailed cost estimate. <br /> • • Review and comment services related to warranty service requests <br /> ® • Technical support in matters regarding MEP systems to Town Staff <br /> • Technical support by the use of other consultants when specialized areas of expertise <br /> Contract term —start and end date <br /> • 2009—2015 <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> SGMA <br /> • ENGINEERING! 15 <br /> i%,It <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.